St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilet...
Angebotsfrist:27. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store,...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: St Oliver Plunkett NS Newcastle
- Veröffentlicht: 29. April 2026
- Frist: 27. Mai 2026
Ausschreibungsbeschreibung
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Our Lady’s Meadow Primary SchoolDurrowFrist: 09. Apr.
MEchanical Upgrade Works to Our Lady of Meadows School, Durrow, Co. Laois. R32 FW18
EWS 2026 Mechanical upgrading works to Our Lady of Meadows, Durrow, Co. Laois. R32 FW18. The works entail the replacement of the existing space heating services throughout the existing building. Refer to the drawings and specifications for further information on the works to be carried out.
- Killeeneen National School (Craughwell)Killeeneen Craughwell Co GalwayFrist: 19. Mai
EWS26 - Electrical Upgrade Works at Killeeneen NS Killeeneen Craughwell Co Galway
EWS26 Electrical Upgrade works to Killeeneen NS, Killeeneen Craughwell Co Galway. The works entail replacement of existing electrical services throughout the building. Refer to the attached documents for further information on the works to be carried out. Site visits to be arranged directly with the school.
- Ballylooby NSCahirFrist: 07. Mai
2608 Electrical Upgrade Ballylooby National School
The scope of work for the contract involves upgrade of the electrical installations throughout the school including an upgrade to the ESB Networks supply, provision of new Distribution Boards and cable containment systems, general service and equipment power, general and emergency lighting systems, ICT structured wiring systems, protecticve services including fire detection and alarm system, security services, access control and CCTV systems and all associated builder’s and cilvil works
- Hewetson National SchoolClaneFrist: 06. Mai
EWS26 Hewetson National School Millicent Clane Co Kildare
EWS26 Electrical upgrade works to Hewetson NS Millicent Clane Co Kildare. The works entail replacement of the existing electrical services throughout the building. Refer to the attached documents for further information on the work to be carried out. Site visits to be arranged directly with the School.
- Kerry Education and Training BoardTraleeFrist: 15. Apr.
Tender for Mechanical and Electrical consultancy services for Kerry ETB installation of Biomass boiler with backup LPG
On behalf of Kerry Education and Training Board you are hereby invited to tender for Mechanical and Electrical services (including buying in of additional services for other disciplines as required) for the above project. The project consists of replacing the existing primary supply heat source, Oil fired boilers, with a Biomass boiler and LPG backup while retaining the existing heat distribution system. The works will be carried out in a live environment delivering educational training and serv
- Kingdom Homecare Services LtdTraleeFrist: 09. Apr.
Bluebird Care Day Centre – Fit-Out and Refurbishment Works
Internal fit-out and refurbishment of first floor of existing two-storey building for use as a day care and activity centre. Works include demolition of existing internal partitions and finishes; new drywall partition systems; fully accessible Wet Changing Room compliant with TGD Part M including full room XY/H-Frame ceiling track hoist; kitchen fit-out; sensory rooms with Autex Acoustics treatment; quiet rooms; office W.C.; protected corridor; electrical installation; mechanical ventilation with heat recovery; plumbing, drainage and water services; external wall insulation upgrade; attic insulation; fire safety works; Disability Access Certificate (DAC) compliance; and all associated finishes, fixtures and fittings.
- Office of Public Works (OPW)TrimFrist: 22. Apr.
National Centre for Research and Remembrance | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Centre will stand as a site of conscience that will honour equally all those who were resident in Industrial Schools, Reformatories, Magdalen Laundries, Mother and Baby Homes and related institutions. It will comprise the following: The provision of the National Centre Museum and Research Centre (total circa 7510m2) with a purpose built archival repository/storage space (circa 4,030m2, 3-4 storeys over circa 1,300m2 basement). This will comprise the restoration and remodelling of the existing convent blocks and chapel (circa 3,5490m2). There will also be a new L shaped building, which will enclose a garden of reflection. The National Centre will include extensive document repositories at basement levels; exhibitions spaces, conservation laboratories, and technical spaces at ground level; and public reading rooms at first floor level; The provision of a new multi storey multi-functional Educational Facility (circa 3,690m2 of new 3-5 storey building over basement) comprising of large and small teaching rooms, study spaces, offices, social space to support further and higher education. Classes, seminars, workshops and other events will be delivered from the site with access open to the local community to attend. (refer to Appendix D for preliminary layouts). The provision of Community based Family and Parenting Support Facilities (circa 1,195m2 divided between the two sites 2-3 storeys), within two existing buildings – a new building behind the former Scots Church facade, a protected structure, and the former Dispensary building. This will provide purpose-built spaces such as teaching and play spaces, offices, meeting rooms, workshop space; external play spaces etc.
- Westmeath County CouncilMullingarFrist: 26. Apr.
Improvement Works to Properties 9,10 and 11 St Mary's Terrace and Old Council Depot, Athlone, Co.Westmeath
Westmeath County Council (WCC) is progressing external improvement works to houses 9, 10 and 11 St Mary’s Terrace, Athlone County Westmeath with the intention of making these buildings safe and improve the aesthetic impact of the houses on the surrounding streetscape. The works will involve the removal of fire damaged roofs of houses 9 and 10 including asbestos slates and roof timbers. The damaged sections of the roof of house no. 11 are to be reinstated to make it weatherproof and prevent further deterioration of the house in the medium term. All windows and doors of the 3 no houses to be blocked up as detailed. All rubbish is to be removed from the external lower ground level areas front, back and side of the three houses. Consideration is to be given to the presence of Japanese Knotweed to the back of the properties and while not part of these works an exclusion zone will be required to be set up to exclude access to this area. As these houses are in a residential area safe access is to be maintained to neighboring properties throughout the duration of the works. WCC is also progressing the fitting of a new palisade gate and fence section to the yard of the old Council Depot at Loughanaskin, Athlone, Co. Westmeath and the general cleanup of the yard to the front of the building. The gate and fence section will be required to match the existing palisade gate. Some remedial work is required to the locking bolt of the existing gate to leave it in good working order. The front yard is to be cleaned of all debris and vegetation to leave in a condition suitable for follow on works. This invitation to tender is only applicable to the removal of asbestos, remedial works and general clean up to houses 9 to 11 St Mary’s Terrace and provision of gate and clean up to the Old Council Depot, Loughanaskin, Athlone, County Westmeath as detailed in this scope of works document , shown on the drawings and itemized within the accompanying pricing document.
- Office of Public Works (OPW)TrimFrist: 04. Juni
National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level support accommodation; bicycle shelter; external bin enclosure and plant rooms; hard and soft landscaping to a new communal amenity space; and all associated site works.
- Health Service Executive (HSE)KildareFrist: 24. März
HSE EST MW -St Josephs Ennis Pump Upgrade
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivilant) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 27. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist St Oliver Plunkett NS Newcastle.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.