National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level su...
Angebotsfrist:04. Juni 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level support accommodati...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Office of Public Works (OPW)
- Veröffentlicht: 22. April 2026
- Frist: 04. Juni 2026
Ausschreibungsbeschreibung
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level support accommodation; bicycle shelter; external bin enclosure and plant rooms; hard and soft landscaping to a new communal amenity space; and all associated site works.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
3- Office of Public Works (OPW)TrimFrist: 22. Apr.
National Centre for Research and Remembrance | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Centre will stand as a site of conscience that will honour equally all those who were resident in Industrial Schools, Reformatories, Magdalen Laundries, Mother and Baby Homes and related institutions. It will comprise the following: The provision of the National Centre Museum and Research Centre (total circa 7510m2) with a purpose built archival repository/storage space (circa 4,030m2, 3-4 storeys over circa 1,300m2 basement). This will comprise the restoration and remodelling of the existing convent blocks and chapel (circa 3,5490m2). There will also be a new L shaped building, which will enclose a garden of reflection. The National Centre will include extensive document repositories at basement levels; exhibitions spaces, conservation laboratories, and technical spaces at ground level; and public reading rooms at first floor level; The provision of a new multi storey multi-functional Educational Facility (circa 3,690m2 of new 3-5 storey building over basement) comprising of large and small teaching rooms, study spaces, offices, social space to support further and higher education. Classes, seminars, workshops and other events will be delivered from the site with access open to the local community to attend. (refer to Appendix D for preliminary layouts). The provision of Community based Family and Parenting Support Facilities (circa 1,195m2 divided between the two sites 2-3 storeys), within two existing buildings – a new building behind the former Scots Church facade, a protected structure, and the former Dispensary building. This will provide purpose-built spaces such as teaching and play spaces, offices, meeting rooms, workshop space; external play spaces etc.
- Cork County CouncilCorkFrist: 25. Mai
Works contractor and PSCS at 48 Nr. Proposed Dwellings (42 apartments and 6 houses) at Kilmallock Road, Charleville, Co. Cork
The Works comprise the construction of 48 No. new Social Housing Units in a mixture of apartments and house units employing conventional construction methods on a sloping site together with all associated Mechanical and Electrical Services Installations and extensive External Works.
- A/S ØresundKøbenhavn VFrist: 06. Mai
Tender for a Construction Agreement regarding Passing Tracks Kalvebod (Sub-project 2) Track and Catenary
On 4 April 2024, the Danish Parliament adopted the Act on the Upgrade of the Øresund Rail-way, which provides that two passing tracks shall be constructed at Kalvebod. A/S Øresund has been tasked by the Ministry of Transport to carry out the project 'Passing Track Kalvebod’. Several preliminary studies have been conducted to date, and material relating thereto is available at: https://sundogbaelt.dk/forbindelser/overhalingsspor/. The project thus comprises the establishment of two new tracks parallel to the two existing tracks. The project also includes a reconstruction of the Hammelstrupvej Bridge to accommodate four tracks instead of the current two tracks, and the replacement of two footbridges over the railway. The two new tracks shall have new catenary systems installed consisting of cantilever masts covering both tracks. The current neutral section shall also be relocated and pumping station 2 shall undergo certain modifications to make room for the new tracks. Sheet piling shall be installed along the entire stretch to retain the embankment and provide space for the two new tracks. The Passing Tracks Kalvebod project is being implemented in two sub-projects: Sub-project 1 “Structures and Civil Works” (“SP1”) and Sub-project 2 ”Track and Catenary” (“SP2”). SP1 comprises earthworks, drainage, structures and high-voltage installations (civil and construction works). SP2 comprises track and catenary (railway infrastructure). The execution of SP1 has been tendered as a separate design and build contract. The Contracting Entity has entered into a contract with the design and build contractor, and the works under that con-tract are ongoing. This tender concerns the contract regarding SP2, which comprises track and catenary (rail-way infrastructure). The activities in SP2 build upon the works carried out by the contractor for SP1. The project's safety objective is to maintain the existing safety level. A/S Øresund is the project owner and entity in charge of maintenance, whilst Banedanmark is the infrastructure manager. The tender procedure will be conducted as the competitive procedure with negotiation pursuant to Directive 2014/25/EU (the Utilities Directive).
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 04. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Office of Public Works (OPW).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.