National Centre for Research and Remembrance | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Centre will stand as a site of conscience that will honour equally all those who were resident in Industrial Schools, Reformatories, Magdalen Laundries, Mother and Baby Homes and related institutions. It will comprise the following: The provision of the National Centre Museum and Research Centre (total circa 7510m2...
Angebotsfrist:22. April 2026(abgelaufen)
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The Centre will stand as a site of conscience that will honour equally all those who were resident in Industrial Schools, Reformatories, Magdalen Laundries, Mother and Baby Homes and related institutions. It will comprise the following: The provision of the National Centre Museum and Research Centre (total circa 7510m2) with a purpose ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Office of Public Works (OPW)
- Veröffentlicht: 22. April 2026
- Frist: 22. April 2026
Ausschreibungsbeschreibung
The Centre will stand as a site of conscience that will honour equally all those who were resident in Industrial Schools, Reformatories, Magdalen Laundries, Mother and Baby Homes and related institutions. It will comprise the following: The provision of the National Centre Museum and Research Centre (total circa 7510m2) with a purpose built archival repository/storage space (circa 4,030m2, 3-4 storeys over circa 1,300m2 basement). This will comprise the restoration and remodelling of the existing convent blocks and chapel (circa 3,5490m2). There will also be a new L shaped building, which will enclose a garden of reflection. The National Centre will include extensive document repositories at basement levels; exhibitions spaces, conservation laboratories, and technical spaces at ground level; and public reading rooms at first floor level; The provision of a new multi storey multi-functional Educational Facility (circa 3,690m2 of new 3-5 storey building over basement) comprising of large and small teaching rooms, study spaces, offices, social space to support further and higher education. Classes, seminars, workshops and other events will be delivered from the site with access open to the local community to attend. (refer to Appendix D for preliminary layouts). The provision of Community based Family and Parenting Support Facilities (circa 1,195m2 divided between the two sites 2-3 storeys), within two existing buildings – a new building behind the former Scots Church facade, a protected structure, and the former Dispensary building. This will provide purpose-built spaces such as teaching and play spaces, offices, meeting rooms, workshop space; external play spaces etc.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Office of Public Works (OPW)TrimFrist: 04. Juni
National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level support accommodation; bicycle shelter; external bin enclosure and plant rooms; hard and soft landscaping to a new communal amenity space; and all associated site works.
- Rylane Community Park AssociationcorkFrist: 15. Aug.
Construction of a New Build Community Centre in Rylane Cork
Developing a site for community building. The development will consist of the following; construction of a single storey community building to include hall, changing rooms, showers, toilets, storage, meeting room, etc., car parking, vehicular and pedestrian entrances from the public road, all with associated sewer, storm ESB Ducting and site works.
- Mary Immaculate CollegeLimerickFrist: 23. Apr.
Mary Immaculate College Library and Learning Resource Centre - Main Contractor
Mary Immaculate College proposes to replace the existing Áras na Phiarsaigh Library with a new build Library and Learning Resource Centre adjacent to the current library. Once completed, most of the existing library will be demolished and a plaza will be developed between the Tara Building, the Quadrangle, and the New Library and Learning Resource Centre. The project will also include the refurbishment of an existing 300 seat lecture theatre annexed to the existing library, which is connected to the Tara Building. Mary Immaculate College wish to procure a Main Contractor for undertaking the Library and Learning Resource Centre project, on their Limerick College campus.
- Health Service Executive (HSE)KildareFrist: 19. Mai
New CT and ICU Extension - Connolly Hospital Blanchardstown
The new CT and ICU development at Connolly Hospital Blanchardstown forms an extension to the existing hospital and includes local renovations of the main hospital buildings where the new building connects to existing accommodation at ground and first floor level. The development is located on a constrained site which is enclosed on 3 sides by sensitive clinical accommodation including theatres, HDU, and Radiology. The hospital’s emergency department and blue light access route is located directly to the north of the site. Live hospital services must be maintained for the duration of construction. The development is comprised of 3 storeys as set out below: Ground Floor Level: The ground floor includes a new reception and waiting area for the hospital’s radiology department as well as administrative and support areas including offices, WCs and changing areas. The ground floor also includes a new CT scanner suite and associated control room and local plant space. The ground floor has a number of critical interfaces and tie-ins with existing buildings including the emergency department and existing radiology department. First Floor Level: The first floor of the proposed development provides a new ICU facility for the hospital which includes 4 no. segregated ICU patient rooms and 1 no. isolation suite as well as ancillary spaces and general support accommodation for staff and equipment. This floor will directly connect with the existing theatres and HDU by way of a high-level link which will require local reconfiguration of the Theatre and HDU departments and modification of existing building fabric similar to at ground floor level. Second Floor Level: The second floor contains an enclosed, dedicated plant room to serve the CT and ICU levels below. A new stair core and evacuation lift is proposed to serve all levels of the extension.
- University College Dublin ( UCD )DublinFrist: 24. Mai
UCDOPP5595 - Construction of UCD FBD Agricultural Science Centre
UCD proposes to enter into a Contract for the new UCD FBD Agricultural Science Centre, Celbridge, Co. Kildare. The proposed c. 2,000m2 building will provide high-quality research, laboratory and office facilities. Laboratory and research space will be required to be of the highest modern standards and representative of the UCD’s vision for research. The contract will also include extensive site services works, including a new attenuation pond, foul treatment system and also hard and soft landscaping.
- Cnoc Bui Community Arts Centre CLGUnion HallFrist: 23. März
Restoration Works Cnoc Bui Community Arts Centre, Union Hall Cork - Re Tender
The works comprise restoration of existing stone sheds to create a new exhibition space The existing floor slab will be demolished and replaced with a new insulated concrete floor slab, walls will be lime rendered, windows and doors replaced, new electrics and underfloor heating system installed and associated external paving, drainage and an insitu concrete retaining wall built to the rear of the site.
- Office of Public Works (OPW)Trim
Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly
The project involves a new development at the Clonmacnoise Monastic Site to improve visitor facilities . The works include alterations to the existing buildings and the construction of a new extension. Also included are substantial landscape works, such as alterations to the coach parking area, the provision of a new entrance courtyard and other ancillary works.
- ForsvarsbyggOSLOFrist: 13. Apr.
C06059/100712 - Construction of the new barracks - Haakonsvern (qualification phase) v2
The assignment is for the establishment of a new crew quarry at Haakonsvern Orlogsstasjon for Forsvarsbygg.The building shall house 360 quarters, organised as 60 six-man rooms, in addition to daily rooms, support rooms, technical rooms and the necessary functions on the basement. The building shall fulfil TEK17, the Norwegian Defence Estates Agency ́s engineering design requirements and relevant standards within fire, acoustics, energy, environment and technical installations.
- A/S ØresundKøbenhavn VFrist: 06. Mai
Tender for a Construction Agreement regarding Passing Tracks Kalvebod (Sub-project 2) Track and Catenary
On 4 April 2024, the Danish Parliament adopted the Act on the Upgrade of the Øresund Rail-way, which provides that two passing tracks shall be constructed at Kalvebod. A/S Øresund has been tasked by the Ministry of Transport to carry out the project 'Passing Track Kalvebod’. Several preliminary studies have been conducted to date, and material relating thereto is available at: https://sundogbaelt.dk/forbindelser/overhalingsspor/. The project thus comprises the establishment of two new tracks parallel to the two existing tracks. The project also includes a reconstruction of the Hammelstrupvej Bridge to accommodate four tracks instead of the current two tracks, and the replacement of two footbridges over the railway. The two new tracks shall have new catenary systems installed consisting of cantilever masts covering both tracks. The current neutral section shall also be relocated and pumping station 2 shall undergo certain modifications to make room for the new tracks. Sheet piling shall be installed along the entire stretch to retain the embankment and provide space for the two new tracks. The Passing Tracks Kalvebod project is being implemented in two sub-projects: Sub-project 1 “Structures and Civil Works” (“SP1”) and Sub-project 2 ”Track and Catenary” (“SP2”). SP1 comprises earthworks, drainage, structures and high-voltage installations (civil and construction works). SP2 comprises track and catenary (railway infrastructure). The execution of SP1 has been tendered as a separate design and build contract. The Contracting Entity has entered into a contract with the design and build contractor, and the works under that con-tract are ongoing. This tender concerns the contract regarding SP2, which comprises track and catenary (rail-way infrastructure). The activities in SP2 build upon the works carried out by the contractor for SP1. The project's safety objective is to maintain the existing safety level. A/S Øresund is the project owner and entity in charge of maintenance, whilst Banedanmark is the infrastructure manager. The tender procedure will be conducted as the competitive procedure with negotiation pursuant to Directive 2014/25/EU (the Utilities Directive).
- Office of Public Works (OPW)Trim
Civil and Structural Engineering Consultancy Service and Project Supervisor Design Process (PSDP)Consultancy Service, Naas Garda Station
The proposed project includes the construction of a new single storey ancillary building to the existing Garda station located in Naas town, providing a property and evidence store suitable for handling and storage of same. The new proposed development includes an area of c. 252 m2, with a total internal floor area of c. 230 m2 (Please refer to Definite Project Brief for further details) Civil and Structural Engineering Consultancy Services and Project Supervisor Design Process (PSDP)Consultancy Services are sought for the duration of the project.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 22. April 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Office of Public Works (OPW).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.