E134 Ølen - Mørkli
Traffic safety and improvement measures shall be carried out on the E134 on a stretch between Ølen (Vindafjord municipality) and Mørkli (Etne municipality). The stretch is approx. 6.3 km long, with volume of traffic (ÅDT for 2024) of approx. 4,200, ÅDT share of long vehicles, 16 %. The project is draft based. The aim o...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Traffic safety and improvement measures shall be carried out on the E134 on a stretch between Ølen (Vindafjord municipality) and Mørkli (Etne municipality). The stretch is approx. 6.3 km long, with volume of traffic (ÅDT for 2024) of approx. 4,200, ÅDT share of long vehicles, 16 %. The project is draft based. The aim of the work is to ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Statens vegvesen
- Veröffentlicht: 04. Mai 2026
- Frist: Nicht angegeben
- Thema: Straßenbau
Ausschreibungsbeschreibung
Traffic safety and improvement measures shall be carried out on the E134 on a stretch between Ølen (Vindafjord municipality) and Mørkli (Etne municipality). The stretch is approx. 6.3 km long, with volume of traffic (ÅDT for 2024) of approx. 4,200, ÅDT share of long vehicles, 16 %. The project is draft based. The aim of the work is to expand the current road to establish reinforced road marking (FVO). The work to be carried out is a combination of improving the existing road and the construction of a new road. Other works that can also be mentioned are; measures in waterways, retaining walls, bridges, sub-drains, feud underpasses, adaptations of exits and side terrain measures etc. Below is a small overview of the measures/work to be carried out. The list is not exhaustive.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Limerick City and County Council_103432Limerick.
Foynes to Limerick Road (including Adare Bypass) Independent PSCS Services
Limerick City and County Council in partnership with Transport Infrastructure Ireland (TII) propose to carry out the procurement, construction and implementation phases of the Foynes to Limerick Road (including Adare Bypass). The Foynes to Limerick Road (including Adare Bypass) comprises the construction of approx. 15.6km dual carriageway and approx. 17.5km motorway (approx. 33km long) and all ancillary works. The Consultant shall be required to carry out and fulfil the duties of Independent Project Supervisor for the Construction Stage (PSCS) in respect of all enabling works and advance contracts being carried out in advance of the main construction contract for the Foynes to Limerick Road (Including Adare Bypass) road Project. The successful Tenderer will be appointed as Independent PSCS in respect of the planned enabling and advanced works.
- Anskaffelser i Akershus, Buskerud og Østfold KODrammenFrist: 28. Mai
County road 109 Råbekken-Østfoldhallen Delparsell 1
Østfold County shall rebuild county road 109 between Råbekken and Østfoldhallen. At the same time alterations shall be made to the water and sewage installations on the stretch for Fredrikstad municipality. The project ́s area stretches from Råbekken to Østfoldhallen along county road 109 in Fredrikstad municipality. County road 109 along this stretch (approx. 1.7 km long) shall be expanded to 4 lanes, two of which are public transport lanes. Cycle paths shall be constructed. The project also includes the construction of retaining walls, footbridges and culverts as well as roundabouts.
- Statens vegvesenMoss
National road 52 Tuv-Venås and Storeskar - Galdane
National road 52 is the mountain pass between Østlandet and Western Norway with the highest share of heavy transport. The aim of all the measures on National Road 52 is to improve accessibility, traffic safety and operational conditions, especially in winter. Tuv-Venås: On the stretch between Tuv and Venås, the current road has a steep climb of 8.2-9.1 % in Støytebakken. This means that heavy vehicles get stuck in winter, which in turn causes blocking back, reduced accessibility and traffic hazardous situations. The current chain site is undersized and not built in accordance with the current requirements. There are no offers on the stretch for soft road users. Riksvegen shall therefore be improved to an H1 road, with a special focus on better vertical curvature, a parallel foot and cycle path shall be established and the chain place shall be moved and built according to requirements in the current hand books. The speed limit is set at 60 km/h up to Venås bridge. Walls and access screens shall be constructed. New sub-drains shall be established through national road 52, and old sub-drains shall be removed. Today Storeskar bridge has registered damage, and is after the new Skjøiten bridge was built, the weakest point on national road 52. The bridge ́s adjoining road currently has a crease S-curve that does not meet the current normal requirements. New Storeskar bridge is included in the contract work and adjoining road geometry shall be improved to H1 standard. The speed limit is set at 80 km/h. The Norwegian Public Roads Administration has, as a part of its engineering design, carried out a detailed engineering design services for the bridge and has carried out technical approval of this. Detailed engineering design services and technical certification will be made available for the contractor in chapter F and it can be used by the tenderer. If such use, the tenderer makes the material theirs and will be responsible for any further use of this. There are high rock cuttings in the project that shall be blasted, and securing rock shall be Performed. Blasting works have previously been carried out in the rock cuttings, and the remaining undetoned explosives must be expected. Gamle Storeskar bridge is demolished and removed after the new Storeskar bridge is trafficked.
- Statens vegvesenMoss
E134 the Oslo fjord connection - construction stage 2
The contract work includes engineering design services for and the construction of the Oslo fjord connection, construction stage 2, total approx. 14 km of road. The project is an expansion of the current road from 2 to 4 lanes. The works include i.a. new tunnels in the Oslofjord tunnel, Frogn tunnel and vassum tunnel, new tunnel portals, several large bridges and alterations to crossing areas. The contract shall be implemented with model based engineering design services.
- Vestland fylkeskommuneLEIKANGER
Framework agreement railings steel Vestland 2026-2028
Vestland County – Infrastructure and Road – Maintenance north will enter into framework agreement with a tenderer to carry out the replacement and assembly of steel railings on county roads in Vestland county. Approx. 16,000 metres per annum. Each stretch will be contracted via the attached call-off form. The length of the framework agreement applies from. from when the contract is signed until 2027-12-31. The size of the framework agreement is limited to a maximum of NOK 40,000,000. Excluding VAT.
- Lørenskog kommuneLørenskogFrist: 03. Juni
Procurement of a framework agreement for wood care and wood felling services.
Lørenskog municipality shall procure a framework agreement that covers the municipality ́s need for tree care services. The objective of the procurement is to cover the work that the Contracting Authority cannot carry out itself. The contracting authority reserves the right to assess when the work included in this contract shall be carried out itself and when the contract shall be used.
- Fingal County Council_371Dublin
FCC/103/24 - R132 Connectivity Project for Fingal County Council
The proposed works are to be carried out along the existing R132 situated between Lissenhall Interchange and Pinnockhill junction, to the east of Swords Town Centre. The section of road the subject of the proposed development is approximately 2.6km long. The works will involve the conversion of three existing intersections along the R132 (Estuary, Seatown and Malahide Road Roundabouts) to signalised intersections with 'at-grade pedestrian and cyclist crossing points; Carriageway alterations including the establishment of designated bus lanes, cycleways and pedestrian walkways; Construction of new bus-stops; Installation of a sub-surface attenuation system; and landscaping and other anciliary works.
- Oslo kommune, BymiljøetatenOslo
Direct procurement - SeaProtectorOne Akerselva
Oslo municipality c/o the Agency for Urban Environment intends to directly procure SeaProtectorOne from All in on Green. This is a waste management system to reduce marine littering from Akerselva to oslofjorden. The new garbage collector will be installed along the Akerselva river at Munch Brygge. Work for new technological solutions to prevent emissions of marine littering in the Oslo fjord is anchored in measure 3.10 in Oslo kommune's Initiative List against plastic and marine littering. The procurement includes the procurement and assembly of SeaProtectorOne and it will be carried out in 2026.
- Limerick City and County Council_103432Limerick.Frist: 04. Juni
Limerick City and County Council Topographical Survey Works
Limerick City and County Council (LCCC) requires the completion of a number of topographical surveys annually, primarily to support road realignment and junction improvement works. To expedite the procurement process LCCC are inviting applicants to tender rates for the provision of these survey requirements. The surveys will typically be required for projects including road pavement and realignment works, junction improvements, installation of vehicle restraint systems (VRS), implementation of traffic calming measures, and structural topographical surveys. The sites will be located throughout Limerick City and County, on National, Regional and local roads.
- Telemark fylkeskommuneSkienFrist: 18. Mai
County road 356 Raschebakken - Skippergata
The project is on county road 356 in Porsgrunn municipality in Telemark county, and consists of the establishment of a new crossing system and upgrading of the municipality ́s water and sewage installations in Raschebakken and Skippergata, as well as the establishment of a new green structure along the road. The works include road construction and upgrading of municipal water and sewage in the area, as well as the construction of a foot and cycle path, green areas, stone setting, electro, noise reduction measures and other associated works.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Statens vegvesen.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.