County road 109 Råbekken-Østfoldhallen Delparsell 1
Østfold County shall rebuild county road 109 between Råbekken and Østfoldhallen. At the same time alterations shall be made to the water and sewage installations on the stretch for Fredrikstad municipality. The project ́s area stretches from Råbekken to Østfoldhallen along county road 109 in Fredrikstad municipality. C...
Angebotsfrist:28. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Østfold County shall rebuild county road 109 between Råbekken and Østfoldhallen. At the same time alterations shall be made to the water and sewage installations on the stretch for Fredrikstad municipality. The project ́s area stretches from Råbekken to Østfoldhallen along county road 109 in Fredrikstad municipality. County road 109 al...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Anskaffelser i Akershus, Buskerud og Østfold KO
- Veröffentlicht: 27. April 2026
- Frist: 28. Mai 2026
Ausschreibungsbeschreibung
Østfold County shall rebuild county road 109 between Råbekken and Østfoldhallen. At the same time alterations shall be made to the water and sewage installations on the stretch for Fredrikstad municipality. The project ́s area stretches from Råbekken to Østfoldhallen along county road 109 in Fredrikstad municipality. County road 109 along this stretch (approx. 1.7 km long) shall be expanded to 4 lanes, two of which are public transport lanes. Cycle paths shall be constructed. The project also includes the construction of retaining walls, footbridges and culverts as well as roundabouts.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Rogaland fylkeskommuneStavangerFrist: 08. Mai
County road 44 Vassvik - Hellvik bridge - road improvements
Rogaland county needs to carry out county road 44 Vassvik - Hellvik bridge - road improvements. The project includes improvements to county roads (county road) 44 with a new longitudinal foot and cycle path over parts of the stretch. The road stretches from Sandvika to Hellvik bridge, total 2,550 metres. In connection with the establishment of a new county road 44, the project also includes the demolition of two existing bridges and the establishment of a new bridge in the same area adapted to a new situation.
- Statens vegvesenMossFrist: 22. Mai
National road 426 Eigerøy bridge
The main aim of the project is to replace the current Eigerøy bridge with a new bridge which shall be constructed parallel to the south side of the existing one. When the new bridge is finished, shall the old one be demolished. In addition a foot and cycle path shall be established south along the Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure comprehensive improvement of the infrastructure. New Eigerøy Bridge * The new Eigerøy bridge shall be constructed on the south side of the existing bridge. When the new the bridge has been completed, the old bridge shall be demolished. The new bridge is planned as a type of "Concrete slab bridge with blasted columns" with a length of approx. 272 m. * The bridge should typically have a total width of 13.6 m. * The sailing rectangle shall be (HxB) 22.5 m in 23.5 m. Other constructions * New culvert Lauåsen internal dimension (BxH) 3.5 m x 3.1 m * Support construction along Hovlandsvegen * Retaining wall and support construction at Hovlandsvegen 7 and 9 * Retaining wall along Old Eigerøyveien. * Other minor walls and support structures uncovered by the engineering design. need for. A new foot and cycle path shall be constructed as the main solution for walking and cycling. Some parts of the stretch will have pavements. * A new three-armed roundabout shall be constructed at Eigerøy. * The public transport stops along the stretch shall be upgraded to universal design and be equipped with shelters for better comfort and accessibility. * A new national road 426 shall be constructed on the east side of the new bridge, approx. 200 m eastwards. * Approx. 230 m new exit and local road from Langholmveien shall be constructed. Along Hovlandsveien * Along Hovlandsveien, National Road 426, a new foot and cycle path shall be constructed on the east side from the junction with Nyåskaiveien to the new Eigerøy bridge. This road shall connect on foot and cycle paths on the new bridge. The foot and cycle path is approx. 750 m long. The width of the new foot and cycle path varies between 2.5 and 3.0 m plus the shoulder and railing room. * The farthest south continues the current foot and cycle path on the west side of Hovlandsveien up to the existing pedestrian crossing at the public transport stops. See the tender documentation for detailed information on the contract work.
- Vestland fylkeskommuneLEIKANGERFrist: 07. Apr.
County road 5591 Rørdalsfjord bridge - Turnkey contract
Vestland County shall enter into a contract with a turnkey contractor for the engineering design services for and construction of a new bridge over Rørdalsfjorden at Ytre Sula in Solund municipality, and improvements to the accompanying county road county road 5591 Nåravegen on both sides of the fjord.
- Statens vegvesenMoss
National road 426 Eigerøy bridge
The main objective of the project is to replace the current Eigerøy bridge with a new bridge, which shall be constructed parallel to the south side of the existing bridge. When the new bridge is finished, the old bridge shall be demolished. In addition a foot and cycle path shall be established south along Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure a comprehensive improvement of the infrastructure.
- Limerick City and County Council_103432Limerick.Frist: 30. Apr.
Limerick City and County Council Road Safety Audit Services Framework
Limerick City and County Council require Road Safety Audits (RSA) to be carried out on schemes of various sizes and complexities. The RSA requirements are defined within NGS Circular 3 of 2022. LCCC are inviting applicants to tender rates for the provision of these services for projects throughout Limerick City and County generally on Regional and local roads. The purpose of this tender is to prequalify and rank a number of Road Safety Auditors, for the Roads Department and Municipal District Offices of LCCC to select from the qualified tender list in order as and when required.
- Limerick City and County Council_103432Limerick.
Foynes to Limerick Road (including Adare Bypass) Independent PSCS Services
Limerick City and County Council in partnership with Transport Infrastructure Ireland (TII) propose to carry out the procurement, construction and implementation phases of the Foynes to Limerick Road (including Adare Bypass). The Foynes to Limerick Road (including Adare Bypass) comprises the construction of approx. 15.6km dual carriageway and approx. 17.5km motorway (approx. 33km long) and all ancillary works. The Consultant shall be required to carry out and fulfil the duties of Independent Project Supervisor for the Construction Stage (PSCS) in respect of all enabling works and advance contracts being carried out in advance of the main construction contract for the Foynes to Limerick Road (Including Adare Bypass) road Project. The successful Tenderer will be appointed as Independent PSCS in respect of the planned enabling and advanced works.
- Fingal County Council_371Dublin
FCC/103/24 - R132 Connectivity Project for Fingal County Council
The proposed works are to be carried out along the existing R132 situated between Lissenhall Interchange and Pinnockhill junction, to the east of Swords Town Centre. The section of road the subject of the proposed development is approximately 2.6km long. The works will involve the conversion of three existing intersections along the R132 (Estuary, Seatown and Malahide Road Roundabouts) to signalised intersections with 'at-grade pedestrian and cyclist crossing points; Carriageway alterations including the establishment of designated bus lanes, cycleways and pedestrian walkways; Construction of new bus-stops; Installation of a sub-surface attenuation system; and landscaping and other anciliary works.
- Rogaland fylkeskommuneStavangerFrist: 09. Mai
Invitation to market dialogue for operational contracts county road for Rogaland County, Area Transport
Rogaland county invites potential main suppliers of operation and maintenance work on county roads to a market dialogue. The contracting authority currently has five operational contracts, three in Sør-Rogaland and 2 in Nord-Rogaland. Four of these contracts shall be renewed 1 September 2027, and the 3 contracts in Sør-Rogaland shall be merged to two contracts; 1101 Dalane and 1103 Stavanger. In Nord-Rogaland there are 1105 Indre Ryfylke who will be renewed, and 3 operational contracts will be announced simultaneously autumn 2026.
- Sligo County CouncilSligoFrist: 27. Mai
N4/N16 Sligo Urban Active Travel and Road Safety Improvement Scheme
Sligo County Council, through the Sligo Regional Design Office, intends to procure multidisciplinary consultancy services, together with specialist expertise as required, for the N4/N16 Sligo Urban Active Travel and Road Safety Improvement Projects. The Scheme has been divided into two separate projects: 1. Road Safety Improvement Scheme 2. N4/N16 Sligo Urban Active Travel Project. This is to allow the Road Safety Improvement scheme which has a High Collision Location element of the works to be progressed urgently. This location has experienced a significant number of collisions and therefore requires immediate intervention, rather than waiting for the full development timeline of the broader Active Travel Project. The N4/N16 Sligo Urban Active Travel project involves the development of Active Travel infrastructure along the N16 Primary Road corridor, extending from the AbbVie Roundabout to the N4/N16 junction.
- Statens vegvesenMoss
National road 52 Tuv-Venås and Storeskar - Galdane
National road 52 is the mountain pass between Østlandet and Western Norway with the highest share of heavy transport. The aim of all the measures on National Road 52 is to improve accessibility, traffic safety and operational conditions, especially in winter. Tuv-Venås: On the stretch between Tuv and Venås, the current road has a steep climb of 8.2-9.1 % in Støytebakken. This means that heavy vehicles get stuck in winter, which in turn causes blocking back, reduced accessibility and traffic hazardous situations. The current chain site is undersized and not built in accordance with the current requirements. There are no offers on the stretch for soft road users. Riksvegen shall therefore be improved to an H1 road, with a special focus on better vertical curvature, a parallel foot and cycle path shall be established and the chain place shall be moved and built according to requirements in the current hand books. The speed limit is set at 60 km/h up to Venås bridge. Walls and access screens shall be constructed. New sub-drains shall be established through national road 52, and old sub-drains shall be removed. Today Storeskar bridge has registered damage, and is after the new Skjøiten bridge was built, the weakest point on national road 52. The bridge ́s adjoining road currently has a crease S-curve that does not meet the current normal requirements. New Storeskar bridge is included in the contract work and adjoining road geometry shall be improved to H1 standard. The speed limit is set at 80 km/h. The Norwegian Public Roads Administration has, as a part of its engineering design, carried out a detailed engineering design services for the bridge and has carried out technical approval of this. Detailed engineering design services and technical certification will be made available for the contractor in chapter F and it can be used by the tenderer. If such use, the tenderer makes the material theirs and will be responsible for any further use of this. There are high rock cuttings in the project that shall be blasted, and securing rock shall be Performed. Blasting works have previously been carried out in the rock cuttings, and the remaining undetoned explosives must be expected. Gamle Storeskar bridge is demolished and removed after the new Storeskar bridge is trafficked.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 28. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Anskaffelser i Akershus, Buskerud og Østfold KO.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.