Wastewater Collection and Treatment Investment Project in the Municipality of Shtip
The contract shall cover the following works: > Design and construction of wastewater treatment plant for 50,000 PE. The WWTP to be designed and constructed should be with secondary treatment and phosphorous removal. Works will be implemented following FIDIC Conditions of Contract (“Yellow Book”, 1 999 edition). > Work...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The contract shall cover the following works: > Design and construction of wastewater treatment plant for 50,000 PE. The WWTP to be designed and constructed should be with secondary treatment and phosphorous removal. Works will be implemented following FIDIC Conditions of Contract (“Yellow Book”, 1 999 edition). > Works on the sewerage...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Ministry of Finance - Central Financing and Contracting Department (CFCD)
- Veröffentlicht: 21. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
The contract shall cover the following works: > Design and construction of wastewater treatment plant for 50,000 PE. The WWTP to be designed and constructed should be with secondary treatment and phosphorous removal. Works will be implemented following FIDIC Conditions of Contract (“Yellow Book”, 1 999 edition). > Works on the sewerage network which will include: - Rehabilitation/replacement/reconstruction of approximately 33 km of network; - Construction of 4 pumping stations; - Procurement of sewer water cleaning equipment. Works on the sewerage network will be implemented under FIDIC Conditions of Contract (“Red Book”, 1999 edition).
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Valdres Kommunale Renovasjon IKSFagernesFrist: 25. Mai
Transport, reception and treatment of waste for VKR
Contract for the following separate contracts: Contract 1: Receipt and treatment of residue waste, annually approx. 7,500 tonnes. Contract 2: Transport and treatment of wood, annually approx. 4,500 tons. Tenders can be submitted for contract 1 and/or contract 2.
- KD VODOVOD I KANALIZACIJA d. o. o.Rijeka
Improvement of water and wastewater infrastructure in the Gorski Kotar Region, Croatia
LOT 1 - Rehabilitation of water supply pipelines in part of the settlement of Lokve – DIP settlement and construction of public sewer system of the settlement of Lokve – PART 1. The project includes the construction of sanitary sewers in part of the Lokve agglomeration (DIP settlement) in the length of 246.50 m', rehabilitation of part of the water supply system of Lokve (DIP settlement) in the length of 383.77 m', inspection of state, development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 2 - Construction of the water supply system and public sewer system in the municipality of Ravna Gora (Cagar) and rehabilitation of a section of water pressure pipeline PS Šije – WT Kosa. The project includes the construction of the water supply pipeline in the length of 835.00 m' and construction of the public sewer system in the length of 722.18 m' in the settlement of Cagar, and rehabilitation of the water pressure pipeline PS Šije – WT Kosa in the length of 387.78 m', with the development of implementation designs, as-built survey, report on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 3 - Rehabilitation of transmission pipeline WT Sv. Ilija – WT Nadvučnik. The project includes the construction of a bypass, the replacement of 7,449 m, and the development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits.
- Søndre Helgeland Miljøverk IKS (SHMIL)MosjøenFrist: 14. Mai
Transport and treatment of wood SHMIL
Transport and treatment of mixed wood from SHMIL ́s waste facility in Mosjøen and Brønnø ysund.Ca. 4,500 tons per annum. A price shall also be given for the transport and treatment of milled wood (0-100 mm). In addition price can be given on a voluntary option for the transport and recycling of sorted wood. The total amount of waste is uncertain and the stated quantities are not binding for the contracting authority. The contract will be valid for 1 year, with an option for an extension for 1+1+1 year if both parties agree on this.
- Oslo kommune v/ Vann- og avløpsetatenOsloFrist: 20. Apr.
Framework agreement for the purchase of granular aluminium sulphate
The Agency for Water and Sewerage Works (VAV) needs to enter into a framework agreement for the purchase of granular aluminium sulphate for the production of drinking water. The product must always be listed in the contract period on the Norwegian Food Safety Authority ́s list of certified water treatment chemicals in accordance with the drinking water regulations § 14.
- Justis- og beredskapsdepartementetOSLO
Evaluation of quicker treatment of criminal cases with perpetrators under the age of 18 - "quick track"
The aim of the evaluation is to obtain updated knowledge on the work of "fast track" for faster treatment of criminal cases with perpetrators under the age of 18. This includes the results and consequences of the work so far, both for the entities involved in the "fast track" and for children and youths included in the work. A comprehensive description of the delivery is in Annex 1 of the contract. The final delivery deadline for the evaluation is 02.11.2026. The estimated value of the procurement is up to NOK 2,000,000 excluding VAT. See annex 1 of the contract for further details on the delivery.
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Mai
NL-Petten: Engineering-, design- and consultancy services, including provision of support and performance of studies during various phases of construction and/or refurbishment projects.
The JRC Petten is aiming to conclude a contract for engineering and consultancy services. It concerns the development of designs and studies for the procurement and future implementation of various construction and/or renovation projects of buildings and facilities of varying size and complexity. It also includes consultancy services on various matters related to different topics such as installation maintenance, environmental and energy aspects, licensing, project development, and so on. Furthermore, it entails supervision of the construction phase of technical works executed by contractors on the Petten site.
- City of Belgrade, Secretariat for Communal and Housing affairs / Belgrade Land Development Public Agency (Beoland)BelgradeFrist: 15. Juni
Supply and Installation of Mechanical and Electrical Equipment for Iznik Wastewater Treatment Plant (WWTP) Capacity Increase
This contract will include: 1 lot of Mechanical and Electrical Equipment Supply and Installation. The scope of work includes the supply and installation of high capacity wastewater treatment equipment such as 28 submerged membrane modules, a package type pretreatment unit (250 m³/h), a centrifugal decanter, a magnetic bearing turbo blower, and a polymer preparation unit (4,000 L/h, 3chamber, stainless steel), among others.
- Ministry of Finance, Government of the Republic of Serbia Department for Contracting and Financing of EU Funded Programmes (CFCU)BelgradeFrist: 13. Mai
Procurement of equipment for the Establishment of the Regional Waste Management System for the city of Novi Sad and municipalities of Bačka Palanka, Bački Petrovac, Beočin, Žabalj, Srbobran, Temerin and Vrbas
Purpose of this contract is procurement of waste-handling equipment and machines for landfill that will be constructed as a part of Regional Waste Management Center (RWMC) serving the City of Novi Sad and municipalities of Bačka Palanka, Bački Petrovac, Beočin, Žabalj, Srbobran, Temerin and Vrbas. Purpose of this contract is also procurement of the equipment that will focus on waste transport and collection in the city of Novi Sad and before mentioned municipalities.
- SamferdselsdepartementetOSLO
Review of postponement of double track against Hamar and learning across major investment projects
The Ministry of Transport refers to the delay connected to the project Sørli-Åkersvika and any consequences for the development of Hamar station. The Ministry will, as a follow-up of this, carry out an external review with the main aim of identifying learning points. The review consists of two parts, but is delivered together. The first part shall map and evaluate decision processes and information flow connected to the delay of the project Sørli-Åkersvika and any consequences for the development of Hamar station. The review shall: • Assess whether the decision and contract process, as well as information flow have been in accordance with the current guidelines, contracts, agreed processes and management system, both internally in Bane NOR, between Bane NOR and the Norwegian Railway Directorate and internally in the Norwegian Railway Directorate. • Assess whether there is a need to adjust the guidelines and the management system and/or implement measures to ensure better compliance with Bane NOR and the Norwegian Railway Directorate. • Identifying learning points The second part shall evaluate whether Bane NOR ́s internal management systems (including a project model) are sufficient to ensure control of costs, risks and progress in major development projects. The review shall be directed towards the following three cases – the development of the Dovre Line, the Trønder Line and the Vestfold Railway. The review shall also map and assess how the recommendations from relevant reviews in recent years, including the Follobane review from 2023 and the Auditor General's report from 2024 on investment projects, have been followed up, whether the measures implemented are sufficient and whether there is a need for other/new measures to remedy the challenges of delays and increasing costs in major investment projects. The first draft of the report shall be submitted by 14 August 2026, and the final report will be submitted by 4 September 2026. The upper financial limit is NOK 4 million excluding VAT.
- Marsa Local CouncilMARSA
Services of an Architect and Works and Projects Manager / Coordinator for the Marsa Local Council
The subject of this tender is the services of an architect and works and projects manager / coordinator for the Marsa Local Council. The place of acceptance of the services shall be at Marsa, the time-limits for the execution of the contract shall be one (1) year, extendable for another three (3) years, up to a maximum of four (4) years.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Ministry of Finance - Central Financing and Contracting Department (CFCD).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.