Works contractor and PSCS at 48 Nr. Proposed Dwellings (42 apartments and 6 houses) at Kilmallock Road, Charleville, Co. Cork
The Works comprise the construction of 48 No. new Social Housing Units in a mixture of apartments and house units employing conventional construction methods on a sloping site together with all associated Mechanical and Electrical Services Installations and extensive External Works.
Angebotsfrist:25. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The Works comprise the construction of 48 No. new Social Housing Units in a mixture of apartments and house units employing conventional construction methods on a sloping site together with all associated Mechanical and Electrical Services Installations and extensive External Works.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Cork County Council
- Veröffentlicht: 21. April 2026
- Frist: 25. Mai 2026
Ausschreibungsbeschreibung
The Works comprise the construction of 48 No. new Social Housing Units in a mixture of apartments and house units employing conventional construction methods on a sloping site together with all associated Mechanical and Electrical Services Installations and extensive External Works.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
8- Waterford City and County Council_103683WaterfordFrist: 20. Mai
WCCC26 198 Architect Led Design Team Services for the design and build development of 78 No. social and affordable housing units including all associated site works at Fairlane, Dungarvan, Co. Waterf
Design and Build Delivery of 78 no. Social and Affordable Housing Units with a mixture of 1-bed, 2-bed and 3-bed units including all associated site works at Fairlane, Dungarvan, Co. Waterford
- Glin Homes for the Elderly CLG.GlinFrist: 29. Mai
Proposed Assisted Living Dwelling Units, Glin, Co Limerick
The development will involve construction of construction of 10 single story housing units, laid out in two blocks of 5 units, to include a new vehicular access road, carparking, pedestrian entrance and all associated ancillary works
- Health Service Executive (HSE)Kildare
Alteration Works to the existing Laundry and Drier Rooms at Abbeyleix CNU, Abbeyleix Health Centre, Knocknamoe, Abbeyleix, Co. Laois.
Reconfiguration of existing Laundry and Drier rooms located on ground floor level including the replacement and relocation of existing washing and drying machines, replacement of existing internal and external doors and windows and redecoration of both rooms as well as works to the Comms room located on first floor level, together with all associated works.
- The Land Development AgencyDublinFrist: 11. Mai
Design and Construction of the Anglesea Terrace Project, Cork (Pro342)
The Land Development Agency (LDA), established in September 2018, is a Government land management initiative, with a key focus on State-owned land. The LDA opens up State-owned land to improve housing options for individuals and families. The LDA also drives the medium to long term compact development of our cities by providing a vision and delivery strategy for larger scale strategic land areas. The Anglesea Terrace project is a new, large, residential development with a total application site area of approx. 0.25 ha (net area), on brownfield lands in Cork City Centre, located at the South Link Road (N27) and Old Station Road junction. The Anglesea Terrace development forms part of current and future programmes of work to be undertaken by the LDA to develop affordable sale, cost rental and social housing / apartments. The overall development will comprise of 147 no. apartments and all associated development. Refer to the Pre-Qualification Questionnaire (PQQ) for further information.
- Ely Haven LimitedTemplemoreFrist: 23. Apr.
Proposed development of a glamping facility to inclue 6 number glamping pods, an administration unit and associated site works including parking at Barnane Rectory, Barnane, Templemore, Co. Tipperary
Invitation to tender for the proposed development of a glamping facility to incorporate 6 number glamping pods, an administration unit and associated site development including parking at Barnane Rectory, Barnane, Templemore, Co. Tipperary. For the purpose of tendering, it is paramount that the tendering Contractor is in a position to commence works on site immediately following appointment and moreover have such resources available to meet the pertinent handover dates. However, given the public nature of the funding, it is important to note that final funding approval will ultimately be a prerequisite to proceeding with the subject works.
- Tipperary County CouncilClonmel, NenaghFrist: 02. Apr.
Tipperary County Council _ Architect Led Technical Consultancy Team - Single Stage Process with Design and Build for a Social Housing Scheme at - DUBLIN ROAD, THURLES, CO. TIPPERARY, E41 Y5D4
Tipperary County Council are running this competition to appoint an Architect Led Technical Consultancy Team. Single Stage Process for Departmental funding is to be used, for a proposed project which will be Design and Build for Social Housing Scheme at - DUBLIN ROAD, THURLES, CO. TIPPERARY, E41 Y5D4 - for 37 No. social housing units (subject to change) depending on site conditions and proposed designs from the architect led design team of what is feasible for this site.
- Office of Public Works (OPW)TrimFrist: 12. Mai
6 Harcourt St - | Conradh na Gaeilge, Dublin 2, D02 VH98 Phase 3A: Basement Piling Works for New Build Extension to 6 Harcourt Street
The refurbishment and redevelopment of No. 6 Harcourt Street Dublin 2 to provide for improved facilities for Conradh na Gaeilge, the Irish language development organisation. The proposal involves the renovation of the existing original house to accommodate a museum and cultural centre, and the construction of new accommodation to the rear to house administration and support facilities. No. 6 Harcourt Street is listed on the Dublin City Council Record of Protected Structures. The refurbishment and redevelopment of No. 6 Harcourt Street Dublin 2 to provide for improved facilities for Conradh na Gaeilge, the Irish language development organisation. The proposal involves the renovation of the existing original house to accommodate a museum and cultural centre, and the construction of new accommodation to the rear to house administration and support facilities.No. 6 Harcourt Street is listed on the Dublin City Council Record of Protected Structures. Phase 3a: Ground Excavation, Secant Piling Works and Temporary Works* Phase 3a will constitute a piling works package for the basement construction. It includes: • Demolition of rear party wall to No. 7 Harcourt Street (above and below ground). • Backfilling of basement vault abutting the rear façade of the Protected Structure and propping of rear façade of the Protected Structure • Installation of basement piling works (Secant Wall) • Installation of shotcrete lining to inner face of piling wall • Ground excavation works to the underside of proposed basement slab • Temporary shoring props to restrain basement ope and all associated temporary site works
- Office of Public Works (OPW)TrimFrist: 12. Mai
The provision of Interpretation and Exhibition Design for a proposed new visitor facility building adjacent to the Casino at Marino, Cherrymount Crescent (off Malahide Road), Marino, Dublin.
Office of Public Works (OPW) wishes to appoint an Integrated Interpretation Team that shall be responsible for providing all the necessary consultancy services for Stage (I) Preliminary Design to Stage (V) Handover of Works. The following disciplines are relevant to this project: • Interpretive Design Services • Interpretive Research services • Project Management Services • Graphic Design Services • AV / Film Technical Design Services • Procurement services • Quantity Surveying/Cost Management Services • PSDP Services • Script Writing The Integrated Interpretative Team will be responsible for providing all interpretive and associated construction/fitout-related technical advice and design services to the OPW Client for the Project. The Consultant will be required to provide all necessary services including the Stage Services, described below and elsewhere in the contract. The Integrated Interpretation Team shall be required to consult and liaise with all affected stakeholders to facilitate timely design and construction/fitout of the works and to minimise impacts on those affected. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. As noted in 4.3.9.1, It is expected that within the team there will be a Specialist AV / Film Advisor available to provide advice to the team during all stages of the design and fit out process. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. The Team shall be led by an Interpretative designer with a track record of successfully carrying out similar works. Interpretive Research services need to include (a named) suitably qualified person able to collate/and or undertake subject matter research feeding into interpretative design, narrative development and Script Writing. The Team may be formed by a single consultant with in-house specialists or may be a group of consultants who have combined to form a team. In the latter case the Team Leader shall be an Interpretative designer who shall be clearly identified in their Tender Submission as the Lead Tenderer and shall be the entity that enters into a contract with OPW for the delivery of the Services. Other Team members shall be sub-consultants to the Lead Tenderer. Note - The cost of the works will be required to align with the available budgets. The consultant shall refine / revise designs as necessary during the lifetime of the project to achieve this, in consultation with OPW. Full list of requirements are contained within the tender documents.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Cork County Council.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.