Greenpark Community Dwelling, Sixmilebridge, Co. Clare – Refurbishment, Energy Upgrade and Associated Site Works
The works comprise the refurbishment, alteration and energy upgrade of an existing community dwelling located at Greenpark, Sixmilebridge, Co. Clare, including all associated site works and ancillary development. The project involves a comprehensive retrofit of the existing building to improve thermal performance, acce...
Angebotsfrist:12. Juni 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The works comprise the refurbishment, alteration and energy upgrade of an existing community dwelling located at Greenpark, Sixmilebridge, Co. Clare, including all associated site works and ancillary development. The project involves a comprehensive retrofit of the existing building to improve thermal performance, accessibility and fir...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Belmont Park Housing Association
- Veröffentlicht: 04. Mai 2026
- Frist: 12. Juni 2026
- Thema: Abdichtung & Dämmung
Ausschreibungsbeschreibung
The works comprise the refurbishment, alteration and energy upgrade of an existing community dwelling located at Greenpark, Sixmilebridge, Co. Clare, including all associated site works and ancillary development. The project involves a comprehensive retrofit of the existing building to improve thermal performance, accessibility and fire safety standards. Works include the removal of selected internal elements, reconfiguration of internal layouts, and installation of new partitions, doors and finishes throughout. Energy upgrade works include the installation of an external wall insulation (ETICS) system, upgraded attic insulation, new high-performance windows and doors, improved airtightness measures, installation of a new air-to-water heat pump system with associated pipework and controls, mechanical ventilation upgrades, and the provision of a roof-mounted solar photovoltaic (PV) system. Mechanical and electrical works include a full rewire, upgrades to heating and hot water systems, installation and modification of fire detection and alarm systems, emergency lighting, and associated building services. The works also include the conversion and upgrade of an existing detached garage structure to provide ancillary office accommodation (PIC Office), including insulation, new windows and doors, roofing works, and associated mechanical and electrical installations. External works comprise new and upgraded pathways, ramps and hardstanding areas, drainage improvements, installation of soakaways and sustainable drainage features, and all associated site development works. All works are to be carried out in accordance with the Building Surveyor’s drawings and specification, and in compliance with current Building Regulations and relevant standards.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Kingdom Homecare Services LtdTraleeFrist: 09. Apr.
Bluebird Care Day Centre – Fit-Out and Refurbishment Works
Internal fit-out and refurbishment of first floor of existing two-storey building for use as a day care and activity centre. Works include demolition of existing internal partitions and finishes; new drywall partition systems; fully accessible Wet Changing Room compliant with TGD Part M including full room XY/H-Frame ceiling track hoist; kitchen fit-out; sensory rooms with Autex Acoustics treatment; quiet rooms; office W.C.; protected corridor; electrical installation; mechanical ventilation with heat recovery; plumbing, drainage and water services; external wall insulation upgrade; attic insulation; fire safety works; Disability Access Certificate (DAC) compliance; and all associated finishes, fixtures and fittings.
- Cork County CouncilCorkFrist: 25. Mai
Works contractor and PSCS at 48 Nr. Proposed Dwellings (42 apartments and 6 houses) at Kilmallock Road, Charleville, Co. Cork
The Works comprise the construction of 48 No. new Social Housing Units in a mixture of apartments and house units employing conventional construction methods on a sloping site together with all associated Mechanical and Electrical Services Installations and extensive External Works.
- Health Service Executive (HSE)KildareFrist: 25. Mai
Fire Upgrade Works and Energy Upgrade Works, Fountain View, Abbeyleix, Co. Laois
Fire Upgrade Works and Energy Upgrade Works, together with all associated works at Fountain View Residential Care Facility, Abbeyleix, Co. Laois
- Údarás Na Gaeltachta_289Galway
Building Fabric upgrade works at Aonad Eargail, Páirc Ghnó Ghaoth Dobhair, Na Doirí Beaga, Leitir Ceannain, Co. Dún na nGall.
Construction of a new overlay to the existing roof, incorporating 100mm PIR insulation and PVC roofing membrane. Replace all rooflights. Replace all wall cladding, glazing and external doors.
- St Oliver Plunkett NS NewcastleAthenryFrist: 27. Mai
St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.
- Inland Fisheries IrelandDublinFrist: 11. Mai
Galway Weir Lodge Upgrade and Refurbishment
Thermal upgrade and alterations to Weir Lodge including demolitions, asbestos removal, external/internal refurbishment, ground floor upgrades, minor roof alterations, thermal enhancement, stairs reconfiguration, window/door replacement, redecoration, internal fixed furniture fitout, sanitary ware fitout, mechanical installation and associated builder's works. Temporary works required to ensure uninterrupted operation of surrounding IFI Offices, Fishery and Facilities.
- Holy Child National School (Naas)NaasFrist: 17. Apr.
School Roof Refurbishment and Associated Works
The proposed works comprise of the flat roof, part sloped roofs and ceilings complete refurbishment within the existing Holy child National School. Inclusive of all new rain water good, fascias, soffits, verges and barges, Fall protection and internal M and E removal and replacement to allow new ceiling installations at this site.
- Glin Homes for the Elderly CLG.GlinFrist: 29. Mai
Proposed Assisted Living Dwelling Units, Glin, Co Limerick
The development will involve construction of construction of 10 single story housing units, laid out in two blocks of 5 units, to include a new vehicular access road, carparking, pedestrian entrance and all associated ancillary works
- Scoil UrsulaCorkFrist: 22. Mai
Scoil Ursula Primary School, Blackrock Road, Blackrock, Cork - SEN extension and associated siteworks
The project consists of construction of a single storey extension containing 2 Nr. SNU classrooms, multi sensory room, office, store and ancillary accommodation to the Eastern side of the existing school building, connection with the existing building, minor alterations within the existing building and all associated site works and services at Scoil Ursula, Blackrock Road, Blackrock, Cork
- St. Mary's National School (Drung)DrungFrist: 26. Mai
HEATING SYSTEM UPGRADE at ST. MARY'S NATIONAL SCHOOL, DRUNG, CO. CAVAN
The project involves the following scope of works: • Disconnect and remove boiler, pipework, pumps, and controls from boilerhouse and install a new plantroom fitout. • Install new Building Energy Monitoring System (BEMS) to control the heating system and monitor fuel use; • Replace existing heating distribution pipework throughout the school. • Replace existing radiators. • Replace oil tank with new LPG tank on concrete plinth with security cage. • Installation of new gas line from tank to boilerhouse. • Associated electrical works including wiring of plant, valves and sensors from new MCC panel.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 12. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Belmont Park Housing Association.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.