National road 426 Eigerøy bridge
The main objective of the project is to replace the current Eigerøy bridge with a new bridge, which shall be constructed parallel to the south side of the existing bridge. When the new bridge is finished, the old bridge shall be demolished. In addition a foot and cycle path shall be established south along Hovlandsveie...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The main objective of the project is to replace the current Eigerøy bridge with a new bridge, which shall be constructed parallel to the south side of the existing bridge. When the new bridge is finished, the old bridge shall be demolished. In addition a foot and cycle path shall be established south along Hovlandsveien, on the current...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Statens vegvesen
- Veröffentlicht: 22. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
The main objective of the project is to replace the current Eigerøy bridge with a new bridge, which shall be constructed parallel to the south side of the existing bridge. When the new bridge is finished, the old bridge shall be demolished. In addition a foot and cycle path shall be established south along Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure a comprehensive improvement of the infrastructure.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Statens vegvesenMossFrist: 22. Mai
National road 426 Eigerøy bridge
The main aim of the project is to replace the current Eigerøy bridge with a new bridge which shall be constructed parallel to the south side of the existing one. When the new bridge is finished, shall the old one be demolished. In addition a foot and cycle path shall be established south along the Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure comprehensive improvement of the infrastructure. New Eigerøy Bridge * The new Eigerøy bridge shall be constructed on the south side of the existing bridge. When the new the bridge has been completed, the old bridge shall be demolished. The new bridge is planned as a type of "Concrete slab bridge with blasted columns" with a length of approx. 272 m. * The bridge should typically have a total width of 13.6 m. * The sailing rectangle shall be (HxB) 22.5 m in 23.5 m. Other constructions * New culvert Lauåsen internal dimension (BxH) 3.5 m x 3.1 m * Support construction along Hovlandsvegen * Retaining wall and support construction at Hovlandsvegen 7 and 9 * Retaining wall along Old Eigerøyveien. * Other minor walls and support structures uncovered by the engineering design. need for. A new foot and cycle path shall be constructed as the main solution for walking and cycling. Some parts of the stretch will have pavements. * A new three-armed roundabout shall be constructed at Eigerøy. * The public transport stops along the stretch shall be upgraded to universal design and be equipped with shelters for better comfort and accessibility. * A new national road 426 shall be constructed on the east side of the new bridge, approx. 200 m eastwards. * Approx. 230 m new exit and local road from Langholmveien shall be constructed. Along Hovlandsveien * Along Hovlandsveien, National Road 426, a new foot and cycle path shall be constructed on the east side from the junction with Nyåskaiveien to the new Eigerøy bridge. This road shall connect on foot and cycle paths on the new bridge. The foot and cycle path is approx. 750 m long. The width of the new foot and cycle path varies between 2.5 and 3.0 m plus the shoulder and railing room. * The farthest south continues the current foot and cycle path on the west side of Hovlandsveien up to the existing pedestrian crossing at the public transport stops. See the tender documentation for detailed information on the contract work.
- Rogaland fylkeskommuneStavangerFrist: 08. Mai
County road 44 Vassvik - Hellvik bridge - road improvements
Rogaland county needs to carry out county road 44 Vassvik - Hellvik bridge - road improvements. The project includes improvements to county roads (county road) 44 with a new longitudinal foot and cycle path over parts of the stretch. The road stretches from Sandvika to Hellvik bridge, total 2,550 metres. In connection with the establishment of a new county road 44, the project also includes the demolition of two existing bridges and the establishment of a new bridge in the same area adapted to a new situation.
- Statens vegvesenMoss
National road 52 Tuv-Venås and Storeskar - Galdane
National road 52 is the mountain pass between Østlandet and Western Norway with the highest share of heavy transport. The aim of all the measures on National Road 52 is to improve accessibility, traffic safety and operational conditions, especially in winter. Tuv-Venås: On the stretch between Tuv and Venås, the current road has a steep climb of 8.2-9.1 % in Støytebakken. This means that heavy vehicles get stuck in winter, which in turn causes blocking back, reduced accessibility and traffic hazardous situations. The current chain site is undersized and not built in accordance with the current requirements. There are no offers on the stretch for soft road users. Riksvegen shall therefore be improved to an H1 road, with a special focus on better vertical curvature, a parallel foot and cycle path shall be established and the chain place shall be moved and built according to requirements in the current hand books. The speed limit is set at 60 km/h up to Venås bridge. Walls and access screens shall be constructed. New sub-drains shall be established through national road 52, and old sub-drains shall be removed. Today Storeskar bridge has registered damage, and is after the new Skjøiten bridge was built, the weakest point on national road 52. The bridge ́s adjoining road currently has a crease S-curve that does not meet the current normal requirements. New Storeskar bridge is included in the contract work and adjoining road geometry shall be improved to H1 standard. The speed limit is set at 80 km/h. The Norwegian Public Roads Administration has, as a part of its engineering design, carried out a detailed engineering design services for the bridge and has carried out technical approval of this. Detailed engineering design services and technical certification will be made available for the contractor in chapter F and it can be used by the tenderer. If such use, the tenderer makes the material theirs and will be responsible for any further use of this. There are high rock cuttings in the project that shall be blasted, and securing rock shall be Performed. Blasting works have previously been carried out in the rock cuttings, and the remaining undetoned explosives must be expected. Gamle Storeskar bridge is demolished and removed after the new Storeskar bridge is trafficked.
- Vestland fylkeskommuneLEIKANGERFrist: 07. Apr.
County road 5591 Rørdalsfjord bridge - Turnkey contract
Vestland County shall enter into a contract with a turnkey contractor for the engineering design services for and construction of a new bridge over Rørdalsfjorden at Ytre Sula in Solund municipality, and improvements to the accompanying county road county road 5591 Nåravegen on both sides of the fjord.
- Office of Public Works (OPW)Trim
Island bridge Commemorative Bridge- Reserved Specialist
The tender is for the proposal for a new cycle and pedestrian bridge, of outstanding design quality, crossing the river Liffey. The new bridge will be located at The Irish National War Memorial Gardens (INWMG) lands to the north of the river Liffey at UCD boat club, Islandbridge, Dublin.
- Limerick City and County Council_103432Limerick.Frist: 01. Mai
Limerick City and County Council 2026 Non-National Road Bridge Refurbishment Works
Limerick City and County Council (LCCC) proposes to carry out repair works to a number of bridges in County Limerick as part of their 2026 Non National Road Bridge Refurbishment Works. The bridges are located throughout County Limerick. Full details are available in the Tender Documentation.
- LandsvirkjunReykjavík
BUF05 - Road construction
Landsvirkjun is planning a wind farm in the Búrfell area around Vaðalda in the South of Iceland. This contract is for road construction within the area for roads leading to each of the wind turbine tower, which will be up to 30. Please see further information in the tender documents.
- Statens vegvesenMoss
E134 the Oslo fjord connection - construction stage 2
The contract work includes engineering design services for and the construction of the Oslo fjord connection, construction stage 2, total approx. 14 km of road. The project is an expansion of the current road from 2 to 4 lanes. The works include i.a. new tunnels in the Oslofjord tunnel, Frogn tunnel and vassum tunnel, new tunnel portals, several large bridges and alterations to crossing areas. The contract shall be implemented with model based engineering design services.
- Kristiansund kommuneKRISTIANSUND NFrist: 14. Apr.
KK-DPS Consultancy services for reconstruction shelter Storhaugen
Kristiansund municipality shall implement alterations and expansion of the shelter function at Storhaugen Health Centre. The current shelter is located on the 3rd floor of the south wing. The areas are not sufficient to fulfil the current requirements, and registered deviations related to the shelter regulations and the content of the tender. In order to close the deviations, it has been decided that the shelter function shall be moved from the current location on the 3rd floor to the 1st and 2nd floors of the south wing. This involves reorganisation of existing areas and the establishment of new functional systems.
- Sligo County CouncilSligoFrist: 27. Mai
N4/N16 Sligo Urban Active Travel and Road Safety Improvement Scheme
Sligo County Council, through the Sligo Regional Design Office, intends to procure multidisciplinary consultancy services, together with specialist expertise as required, for the N4/N16 Sligo Urban Active Travel and Road Safety Improvement Projects. The Scheme has been divided into two separate projects: 1. Road Safety Improvement Scheme 2. N4/N16 Sligo Urban Active Travel Project. This is to allow the Road Safety Improvement scheme which has a High Collision Location element of the works to be progressed urgently. This location has experienced a significant number of collisions and therefore requires immediate intervention, rather than waiting for the full development timeline of the broader Active Travel Project. The N4/N16 Sligo Urban Active Travel project involves the development of Active Travel infrastructure along the N16 Primary Road corridor, extending from the AbbVie Roundabout to the N4/N16 junction.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Statens vegvesen.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.