Construction of a new playing field (145m x 90m), provision of all fencing, ballstops, dugouts, etc. and allother associated site works
Construction of a new playing field (145m x 90m), provision of all fencing, ballstops, dugouts, etc. and allother associated site works
Angebotsfrist:28. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Construction of a new playing field (145m x 90m), provision of all fencing, ballstops, dugouts, etc. and allother associated site works
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: CLG An Tearmann
- Veröffentlicht: 29. April 2026
- Frist: 28. Mai 2026
Ausschreibungsbeschreibung
Construction of a new playing field (145m x 90m), provision of all fencing, ballstops, dugouts, etc. and allother associated site works
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
8- St. Peter and Paul’s C.B.S. (Clonmel)ClonmelFrist: 01. Juni
Proposed All Weather Sports Pitch and Associated works
Proposed construction of an all weather sports pitch, provision of new fencing, soft netting, inclusion of specific equipment, and all associated/ancillary works
- Rylane Community Park AssociationcorkFrist: 15. Aug.
Construction of a New Build Community Centre in Rylane Cork
Developing a site for community building. The development will consist of the following; construction of a single storey community building to include hall, changing rooms, showers, toilets, storage, meeting room, etc., car parking, vehicular and pedestrian entrances from the public road, all with associated sewer, storm ESB Ducting and site works.
- Office of Public Works (OPW)TrimFrist: 04. Juni
National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Main Contractor and Project Supervisor Construction Stage (PSCS)
The Phase 3-A Social Housing Works on Railway Street as part of the overall NCRR development will consist of: The provision of a new 6 storey Social Housing apartment building (circa 1,740sqm) consisting of 18no. 2 bed Universal Design + apartment units with rooftop plantroom enclosure; the provision of ground level support accommodation; bicycle shelter; external bin enclosure and plant rooms; hard and soft landscaping to a new communal amenity space; and all associated site works.
- Waterford City and County Council_103683WaterfordFrist: 20. Mai
WCCC26 198 Architect Led Design Team Services for the design and build development of 78 No. social and affordable housing units including all associated site works at Fairlane, Dungarvan, Co. Waterf
Design and Build Delivery of 78 no. Social and Affordable Housing Units with a mixture of 1-bed, 2-bed and 3-bed units including all associated site works at Fairlane, Dungarvan, Co. Waterford
- Ely Haven LimitedTemplemoreFrist: 23. Apr.
Proposed development of a glamping facility to inclue 6 number glamping pods, an administration unit and associated site works including parking at Barnane Rectory, Barnane, Templemore, Co. Tipperary
Invitation to tender for the proposed development of a glamping facility to incorporate 6 number glamping pods, an administration unit and associated site development including parking at Barnane Rectory, Barnane, Templemore, Co. Tipperary. For the purpose of tendering, it is paramount that the tendering Contractor is in a position to commence works on site immediately following appointment and moreover have such resources available to meet the pertinent handover dates. However, given the public nature of the funding, it is important to note that final funding approval will ultimately be a prerequisite to proceeding with the subject works.
- Office of Public Works (OPW)TrimFrist: 12. Mai
The provision of Interpretation and Exhibition Design for a proposed new visitor facility building adjacent to the Casino at Marino, Cherrymount Crescent (off Malahide Road), Marino, Dublin.
Office of Public Works (OPW) wishes to appoint an Integrated Interpretation Team that shall be responsible for providing all the necessary consultancy services for Stage (I) Preliminary Design to Stage (V) Handover of Works. The following disciplines are relevant to this project: • Interpretive Design Services • Interpretive Research services • Project Management Services • Graphic Design Services • AV / Film Technical Design Services • Procurement services • Quantity Surveying/Cost Management Services • PSDP Services • Script Writing The Integrated Interpretative Team will be responsible for providing all interpretive and associated construction/fitout-related technical advice and design services to the OPW Client for the Project. The Consultant will be required to provide all necessary services including the Stage Services, described below and elsewhere in the contract. The Integrated Interpretation Team shall be required to consult and liaise with all affected stakeholders to facilitate timely design and construction/fitout of the works and to minimise impacts on those affected. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. As noted in 4.3.9.1, It is expected that within the team there will be a Specialist AV / Film Advisor available to provide advice to the team during all stages of the design and fit out process. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. The Team shall be led by an Interpretative designer with a track record of successfully carrying out similar works. Interpretive Research services need to include (a named) suitably qualified person able to collate/and or undertake subject matter research feeding into interpretative design, narrative development and Script Writing. The Team may be formed by a single consultant with in-house specialists or may be a group of consultants who have combined to form a team. In the latter case the Team Leader shall be an Interpretative designer who shall be clearly identified in their Tender Submission as the Lead Tenderer and shall be the entity that enters into a contract with OPW for the delivery of the Services. Other Team members shall be sub-consultants to the Lead Tenderer. Note - The cost of the works will be required to align with the available budgets. The consultant shall refine / revise designs as necessary during the lifetime of the project to achieve this, in consultation with OPW. Full list of requirements are contained within the tender documents.
- The Land Development AgencyDublinFrist: 02. Mai
Establishment of a Multi Party Framework Agreement for the Provision of Urban Design & Infrastructure Planning (UDIP)
The LDA has recently established a Land Activation Team (LAT) within the wider LDA Property Function. The role of the LAT is to support the unlocking and enablement of large, complex regeneration and/or urban expansion sites. The LDA will seek to conduct extensive due diligence, feasibility analysis, capacity testing, and preparation of appropriate plans (Framework Plans, Masterplans, detailed planning schemes etc.) on these sites together with the provision of infrastructure planning, phasing and delivery and economic modelling. Delivery of new high-quality communities and places to live, work and play with an emphasis on high quality urban design and placemaking will be a central consideration. Equally, ensuring financial sustainability, viability and deliverability will be critical considerations in all schemes. The first award of the new established Framework will be for the Lands owned by the LDA at Lissenhall, Swords, Co. Dublin. The LDA proposes to appoint a multidisciplinary, urban‑design‑led consultancy team to prepare a comprehensive baseline assessment, preliminary capacity/framework plan and a detailed Masterplan and Infrastructure Delivery Framework for approximately 96 hectares of land at Lissenhall, Swords, Co. Dublin. The overall aim will be to produce a deliverable, infrastructure‑led Masterplan and statutory‑grade Infrastructure Delivery Plan that supports large‑scale, mixed‑use and/or residential development, integrated infrastructure provision, sustainability outcomes, and long‑term stewardship with the identification of a potential Phase 1 development area. This shall be based on evidence, statutory and infrastructure constraints, and programme logic to be validated through the relevant statutory and LDA governance processes. It is currently anticipated that applicants would be required to form a team to include, the Core Disciplines will comprise of the following: • Urban Design and supporting architectural design services • Civil & Structural Engineering with an emphasis on infrastructure planning, phasing, utilities and delivery. • Planning Consultancy Services to include the following where possible: o Housing Needs Analysis o Socio-demographic analysis o Planning Strategy Advice o Environmental & Technical Assessments o Stakeholder Engagement Strategies o Phasing & Land Activation Strategies • Traffic and Transport & Mobility
- EirGrid plcDublinFrist: 20. Mai
ENQEIR980 – Maintenance and Support for Microsoft Dynamics 365
Required Actions (Deadline: 8st May 2026) 1. Review this Information Memorandum. 2. Join/Upgrade Achillles membership to Supply Line Silver+ level before deadline Friday 8st May 2026. Please contact Zoe Eccleson Zoe.Eccleson@achilles.com who will support your registration. Please be aware that this process can take time to register so please contact Achilles as soon as possible. 3. Register to one or more of the Achilles Supply-Line codes associated with the CPV codes below before deadline of 8thst May 2026. For any procurement queries please contact Jeanne de Lagarcie at jeanne.delagarcie@eirgrid.com. For Achilles queries contact the Achilles team on +44 (0)1224 337544 or via https://help.achilles.com/. Please reference the relevant ENQEIR number and the name of your company in all communications. Failure to complete Achilles registration in advance may result in exclusion from the process. Relevant Achilles Supply-Line codes include: 2.41.2.0 Software Maintenance and Support Services, 2.41.3.0 IT Consultancy EirGrid intends to establish a single-Lot Framework Agreement for Dynamics 365 Finance & Operations Framework. EirGrid intends to establish the Framework Agreement for the provision of maintenance, support and development of its instances of Microsoft Dynamics 365, and for future system upgrades, system projects, and change requests as required. This contract will include but not be limited to the provision of: • MS Dynamics 365 Support and Maintenance Services for current and future instances of the product • Support and Maintenance of embedded Power BI • Assist EirGrid in developing Roadmap for future Microsoft Dynamics 365 enhancement in line with best practice. • Future Microsoft Dynamics 365 projects and system upgrades (including One Version Upgrades) • Future system Change Requests and Development Support and Maintenance Services EirGrid require an inclusive support agreement for all instances of Microsoft Dynamics 365, that in addition to standard system/application support recognises the need for user application support, this will include the following related services: Incident Management and Request Fulfilment • 24/7 or Business hours incident response • Adherence to strict SLAs for incident response and resolution • Root Cause Analysis for major Incidents • Access to Customer Portal to log issues • Remote and, when requested, on-site support • Support Hours: 8am to 6pm IST Monday to Friday • Next business-day emergency call-out on-site response service • Stretch facility for 24X7 support for P1/P2 incidents • Perform trend analysis on recurring issues • Perform preventative maintenance actions • Perform ongoing curation of PowerBi and D365 reports • Perform configuration changes (non-code) • Curation of D365 and PowerBi reports • Provide Hypercare post major releases and One Version upgrades Proactive Maintenance Services • Deployment and testing of Microsoft One Version Updates • Perform regression testing • Perform extension code/compatibility checks • Perform sandbox refreshes & align environments code Performance Monitoring/Optimisation/Health Checks/Knowledge Management • Monitor Batch jobs and optimise runtime and output • Monitor integrations and optimise runtime and output • Monitor License consumption and work with customer to optimise investment • Monitor environment capacity and storage • Create document library with all relevant technical and business processes documented • Maintain solution design documentation • Maintain test scripts and configuration logs • Work with EirGrid Support staff and transfer the required technical knowledge for them to provide 1st line and 2nd line IT support. Reporting, Analytics and Data Visualisation Support • Maintain existing reports (SSRS, Power BI, Dynamics embedded reports). • Build new reports and dashboards as required. • Support data modelling and query optimisation. • Ensure reports maintain performance, security roles, row-level security, and data governance. • Propose reporting improvements proactively. Support of Security & Compliance • Assist EirGrid to adhere to relevant security standards (NIS, CIS etc.) • Perform Role-Based Security reviews • Assist with creation of relevant security roles within D365 application • Support both regulatory and internal audit enquiries • Ensure relevant logging is in place for audit trail Business Continuity and Disaster Recovery • Support EirGrid with DR and site failover testing • Ensure backups are in place and perform regular restoration of data and D365 instance testing Vendor Management & Governance • Perform monthly Service Reviews • Report monthly on KPIs/SLAs • Identify Continuous Service Improvement opportunities • Perform regular strategic roadmap exercises User Training & Adoption • Provide end-user training for new modules/releases • Provide knowledge transfer to internal EirGrid teams • Produce user guides, short videos and quick-reference sheets • Provide end-user hypercare post major change Development & Enhancements Provision of additional consultancy and integration services to include; Minor Enhancements • UI Modifications • Modify or create new workflows • Modify or create new fields, forms or basic logic Major Enhancements • Delivery of new modules or capabilities • Delivery of complex integration changes • Custom development using Microsoft approved tools • Data migrations DevOps/Release Management • Azure DevOps pipelines and branching model • Structured release management • Code review and quality gates
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 28. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist CLG An Tearmann.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.