Colaiste na Sceilge, Caherciveen, Co. Kerry - Flat Roof Replacement and Associated Works
Proposed flat roof replacement including refurbishment, remedial works
Angebotsfrist:27. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Proposed flat roof replacement including refurbishment, remedial works
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Kerry Education and Training Board
- Veröffentlicht: 07. Mai 2026
- Frist: 27. Mai 2026
- Thema: Dacharbeiten
- Bauobjekt: Schule
Bauobjekt-Klassifikation
- SchuleHauptobjekt
Ausschreibungsbeschreibung
Proposed flat roof replacement including refurbishment, remedial works
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Holy Child National School (Naas)NaasFrist: 17. Apr.
School Roof Refurbishment and Associated Works
The proposed works comprise of the flat roof, part sloped roofs and ceilings complete refurbishment within the existing Holy child National School. Inclusive of all new rain water good, fascias, soffits, verges and barges, Fall protection and internal M and E removal and replacement to allow new ceiling installations at this site.
- Senatsverwaltung für Arbeit, Soziales, Gleichstellung, Integration, Vielfalt und AntidiskriminierungFrist: 30. Apr.
School Roof Refurbishment
The proposed works comprise of the flat roof, part sloped roofs and ceilings complete refurbishment within the existing Holy child National School
- Mercy College SligoSligoFrist: 11. Mai
Replacement of Roof and Associated Works at Block ‘B’, Mercy College
The development will consist of the removal and replacement of existing roof over Block ‘B’ Building and all associated site works.
- Environmental Protection AgencyWexfordFrist: 07. Mai
Roofing works at EPA Johnstown Castle, Co. Wexford
Upgrade of a flat roof system and associated works in Environmental Protection Agency headquarters in Wexford.
- Scoil Bheinin Naofa CailiniDuleekFrist: 11. Juni
Proposed Extensions, Refurbishments and associated Site Works at Duleek Boys and Girls National School, Balsaran, Duleek, Co. Meath
Proposed Extensions, Refurbishments and associated Site Works at Duleek Boys and Girls National School, Balsaran, Duleek, Co. Meath
- Inland Fisheries IrelandDublinFrist: 11. Mai
Galway Weir Lodge Upgrade and Refurbishment
Thermal upgrade and alterations to Weir Lodge including demolitions, asbestos removal, external/internal refurbishment, ground floor upgrades, minor roof alterations, thermal enhancement, stairs reconfiguration, window/door replacement, redecoration, internal fixed furniture fitout, sanitary ware fitout, mechanical installation and associated builder's works. Temporary works required to ensure uninterrupted operation of surrounding IFI Offices, Fishery and Facilities.
- Belmont Park Housing AssociationWaterfordFrist: 12. Juni
Greenpark Community Dwelling, Sixmilebridge, Co. Clare – Refurbishment, Energy Upgrade and Associated Site Works
The works comprise the refurbishment, alteration and energy upgrade of an existing community dwelling located at Greenpark, Sixmilebridge, Co. Clare, including all associated site works and ancillary development. The project involves a comprehensive retrofit of the existing building to improve thermal performance, accessibility and fire safety standards. Works include the removal of selected internal elements, reconfiguration of internal layouts, and installation of new partitions, doors and finishes throughout. Energy upgrade works include the installation of an external wall insulation (ETICS) system, upgraded attic insulation, new high-performance windows and doors, improved airtightness measures, installation of a new air-to-water heat pump system with associated pipework and controls, mechanical ventilation upgrades, and the provision of a roof-mounted solar photovoltaic (PV) system. Mechanical and electrical works include a full rewire, upgrades to heating and hot water systems, installation and modification of fire detection and alarm systems, emergency lighting, and associated building services. The works also include the conversion and upgrade of an existing detached garage structure to provide ancillary office accommodation (PIC Office), including insulation, new windows and doors, roofing works, and associated mechanical and electrical installations. External works comprise new and upgraded pathways, ramps and hardstanding areas, drainage improvements, installation of soakaways and sustainable drainage features, and all associated site development works. All works are to be carried out in accordance with the Building Surveyor’s drawings and specification, and in compliance with current Building Regulations and relevant standards.
- Cork County CouncilCork
N4-2-326 PROPOSED DEVELOPMENT OF 8 NR. HOUSING UNITS AND ASSOCIATED EXTERNAL WORKS, CHURCH ROAD, DURRUS, CO. CORK
N4-2-326 PROPOSED DEVELOPMENT OF 8 NR. HOUSING UNITS AND ASSOCIATED EXTERNAL WORKS, CHURCH ROAD, DURRUS, CO. CORK
- Carlow County CouncilCarlowFrist: 29. Juni
REFURBISHMENT WORKS TO BUILDING AND ALL ASSOCIATED SITE WORKS AT ST ENDA`S VOLUNTEER HUB, SLEATY STREET, GRAIGUECULLEN, CARLOW TOWN R93NH96
REFURBISHMENT WORKS TO BUILDING AND ALL ASSOCIATED SITE WORKS AT ST ENDA`S VOLUNTEER HUB, SLEATY STREET, GRAIGUECULLEN, CARLOW TOWN R93NH96
- St Oliver Plunkett NS NewcastleAthenryFrist: 27. Mai
St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 27. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Kerry Education and Training Board.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.