11-2026-02 National and European roads North Rogaland and Vestland-South
The contract work includes the milling of asphalt, the establishment of asphalt, as well as the subsequent establishment of FMO (Reinforced road marking) and NPL (Downed plan line) on Riks og Europaveier in North Rogaland and western Norway South. The contract area includes - E39 Arsvågen ferry quay - Sandvikvåg ferry ...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The contract work includes the milling of asphalt, the establishment of asphalt, as well as the subsequent establishment of FMO (Reinforced road marking) and NPL (Downed plan line) on Riks og Europaveier in North Rogaland and western Norway South. The contract area includes - E39 Arsvågen ferry quay - Sandvikvåg ferry quay - E134 Hauge...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Statens vegvesen
- Veröffentlicht: 07. Mai 2026
- Frist: Nicht angegeben
- Thema: Straßenunterhaltung
- Bauobjekt: Straße / Fahrbahn
Bauobjekt-Klassifikation
- Straße / FahrbahnHauptobjekt
Ausschreibungsbeschreibung
The contract work includes the milling of asphalt, the establishment of asphalt, as well as the subsequent establishment of FMO (Reinforced road marking) and NPL (Downed plan line) on Riks og Europaveier in North Rogaland and western Norway South. The contract area includes - E39 Arsvågen ferry quay - Sandvikvåg ferry quay - E134 Haugesund Airport - Røldal (Liamyrane) - E134 Husøyveien industrial area - National road 13, Carpenter ferry quay – Røldal junction E134 (Håra) The contract will be valid for 7 months from April to October. Quantities and list of stretches are in the attached documents. "Overview of asphalt contracts" and "Quantity summary and list of stretches". The contractor is responsible for familiarising himself with the sections in the contract before the start-up.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Statens vegvesenMoss
Asphalt contract 46-2026-01 European and national roads in Sogn og Fjordane
Approx. 28,500 tonnes of asphalt on European and national roads in Sogn og Fjordane. The contract includes works on national roads in accordance with the attached reports 'Overview of asphalt contracts' and 'Quantity summary and list of sections'. The contractor is responsible for familiarising himself with the sections in the contract before the start-up.
- Statens vegvesenMoss
Asphalt contract 46-2026-02 European and national roads in Hordaland
The contract is for milling and asphalting work in bergen, Ullensvang, Eidfjord, Voss and Elves municipalities. The contract also includes milling work for reinforced road marking (FVO) at the contact point in question. Some contract points also include the establishment of rice-detecting joints. The contract consists of 17 points with a total tonnage of approx. 20,000 tonnes of asphalt and a duration of seven months (April – October).
- Statens vegvesenMoss
Asphalting work north, West Finnmark
The contract includes asphalt works on the national road network in Finnmark. The contract includes works on national roads in accordance with the attached reports 'Overview of asphalt contracts' and 'Quantity summary and list of sections'. The contractor is responsible for familiarising himself with the sections in the contract before the start-up. The contract contains contract points marked with options, see D1.4 "list of stretches and table of amounts".
- Statens vegvesenMoss
Asphalting work north, Neiden-Kirkenes
The contract includes asphalt works on the national road network in Finnmark. The contract includes works on national roads in accordance with the attached reports 'Overview of asphalt contracts' and 'Quantity summary and list of sections'. The contractor is responsible for familiarising himself with the sections in the contract before the start-up. The contract contains contract points marked with an option, see D1.4 "list of stretches and table of amounts".
- Statens vegvesenMoss
Asphalting work north, Hålogaland 2
The contract includes asphalt works in Hålogaland The contract includes works on national roads in accordance with the attached reports 'Overview of asphalt contracts' and 'Quantity summary and list of sections'. The contractor is responsible for familiarising himself with the sections in the contract before the start-up. The contract contains contract points marked with an option, see D1.4 "list of stretches and table of amounts".
- Vestland fylkeskommuneLEIKANGER
Framework agreement road maintenance 2026 - 2028 - Stryn, Gloppen, Stad, Bremanger and Kinn north.
Vestland County - Infrastructure and Road - Maintenance north will be included Framework agreement with tenderers for maintenance work on county roads in Stryn, Gloppen, Stad, Bremanger and Kinn municipalities north. The aim is to enter into a contract with 2 tenderers. The following list shows examples of measures that the framework agreement is expected to include: - Ditch/sub-drain - Natural stone walls - Broadening expansion - Replacement of matter Edge reinforcer -Railing. - Rock protection
- Statens vegvesenMossFrist: 10. Juni
National road 70 Trollsvingen/Røsslyngveien and public transport lane Goma-Atlanten
The contract is a part of Bypakke Kristiansund, which was approved in the Norwegian Parliament 3 June 2025. Bypakke Kristiansund is a co-operation between Kristiansund municipality, Møre og Romsdal county and the Norwegian Public Roads Administration in order to develop an efficient, safe and environmentally friendly transport system in Kristiansund. The contract "National Road 70 Trollsvingen – Røsslyngveien and public transport lane Goma-Atlanten" shall contribute to the intention of the city package; connection between urban development and the development of transport systems and laying the basis for more of the growth in passenger transport being taken by public transport, bicycle and walking. The contract work includes, among other things, the construction of a new roundabout, subways, public transport lane, side road and cycle path with a pavement as well as two car parks.
- Statens vegvesenMoss
National road 52 Tuv-Venås and Storeskar - Galdane
National road 52 is the mountain pass between Østlandet and Western Norway with the highest share of heavy transport. The aim of all the measures on National Road 52 is to improve accessibility, traffic safety and operational conditions, especially in winter. Tuv-Venås: On the stretch between Tuv and Venås, the current road has a steep climb of 8.2-9.1 % in Støytebakken. This means that heavy vehicles get stuck in winter, which in turn causes blocking back, reduced accessibility and traffic hazardous situations. The current chain site is undersized and not built in accordance with the current requirements. There are no offers on the stretch for soft road users. Riksvegen shall therefore be improved to an H1 road, with a special focus on better vertical curvature, a parallel foot and cycle path shall be established and the chain place shall be moved and built according to requirements in the current hand books. The speed limit is set at 60 km/h up to Venås bridge. Walls and access screens shall be constructed. New sub-drains shall be established through national road 52, and old sub-drains shall be removed. Today Storeskar bridge has registered damage, and is after the new Skjøiten bridge was built, the weakest point on national road 52. The bridge ́s adjoining road currently has a crease S-curve that does not meet the current normal requirements. New Storeskar bridge is included in the contract work and adjoining road geometry shall be improved to H1 standard. The speed limit is set at 80 km/h. The Norwegian Public Roads Administration has, as a part of its engineering design, carried out a detailed engineering design services for the bridge and has carried out technical approval of this. Detailed engineering design services and technical certification will be made available for the contractor in chapter F and it can be used by the tenderer. If such use, the tenderer makes the material theirs and will be responsible for any further use of this. There are high rock cuttings in the project that shall be blasted, and securing rock shall be Performed. Blasting works have previously been carried out in the rock cuttings, and the remaining undetoned explosives must be expected. Gamle Storeskar bridge is demolished and removed after the new Storeskar bridge is trafficked.
- Statens vegvesenMossFrist: 22. Mai
National road 426 Eigerøy bridge
The main aim of the project is to replace the current Eigerøy bridge with a new bridge which shall be constructed parallel to the south side of the existing one. When the new bridge is finished, shall the old one be demolished. In addition a foot and cycle path shall be established south along the Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure comprehensive improvement of the infrastructure. New Eigerøy Bridge * The new Eigerøy bridge shall be constructed on the south side of the existing bridge. When the new the bridge has been completed, the old bridge shall be demolished. The new bridge is planned as a type of "Concrete slab bridge with blasted columns" with a length of approx. 272 m. * The bridge should typically have a total width of 13.6 m. * The sailing rectangle shall be (HxB) 22.5 m in 23.5 m. Other constructions * New culvert Lauåsen internal dimension (BxH) 3.5 m x 3.1 m * Support construction along Hovlandsvegen * Retaining wall and support construction at Hovlandsvegen 7 and 9 * Retaining wall along Old Eigerøyveien. * Other minor walls and support structures uncovered by the engineering design. need for. A new foot and cycle path shall be constructed as the main solution for walking and cycling. Some parts of the stretch will have pavements. * A new three-armed roundabout shall be constructed at Eigerøy. * The public transport stops along the stretch shall be upgraded to universal design and be equipped with shelters for better comfort and accessibility. * A new national road 426 shall be constructed on the east side of the new bridge, approx. 200 m eastwards. * Approx. 230 m new exit and local road from Langholmveien shall be constructed. Along Hovlandsveien * Along Hovlandsveien, National Road 426, a new foot and cycle path shall be constructed on the east side from the junction with Nyåskaiveien to the new Eigerøy bridge. This road shall connect on foot and cycle paths on the new bridge. The foot and cycle path is approx. 750 m long. The width of the new foot and cycle path varies between 2.5 and 3.0 m plus the shoulder and railing room. * The farthest south continues the current foot and cycle path on the west side of Hovlandsveien up to the existing pedestrian crossing at the public transport stops. See the tender documentation for detailed information on the contract work.
- Cork County CouncilCorkFrist: 08. Mai
Engineering Inspections of Regional and Local Road bridges in the East and North Regions within the Cork County Council Administrative Area 2026
Cork County Council wishes to appoint a Consultant to undertake Structural Inspection of Regional and Local Road bridges in the East and North Regions within the Cork County Council Administrative Area. Previous PI’s were previously undertaken for most of the structures, however all are in excess of five years since last inspected. The data captured from the survey will be uploaded onto the DoT Pavement Management System, which includes a module for Bridge Asset Management. Regional and Local Bridges – 633
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Statens vegvesen.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.