The NORA Project - Network Operations and Real-time Analysis – a Pipeline Digital Twin
Full replacement of Gassco´s Pipeline Modelling System and the Control Room User Interface.
Angebotsfrist:13. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Full replacement of Gassco´s Pipeline Modelling System and the Control Room User Interface.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Gassco AS
- Veröffentlicht: 12. April 2026
- Frist: 13. Mai 2026
Ausschreibungsbeschreibung
Full replacement of Gassco´s Pipeline Modelling System and the Control Room User Interface.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Ausschreibungen
10- KD VODOVOD I KANALIZACIJA d. o. o.Rijeka
Improvement of water and wastewater infrastructure in the Gorski Kotar Region, Croatia
LOT 1 - Rehabilitation of water supply pipelines in part of the settlement of Lokve – DIP settlement and construction of public sewer system of the settlement of Lokve – PART 1. The project includes the construction of sanitary sewers in part of the Lokve agglomeration (DIP settlement) in the length of 246.50 m', rehabilitation of part of the water supply system of Lokve (DIP settlement) in the length of 383.77 m', inspection of state, development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 2 - Construction of the water supply system and public sewer system in the municipality of Ravna Gora (Cagar) and rehabilitation of a section of water pressure pipeline PS Šije – WT Kosa. The project includes the construction of the water supply pipeline in the length of 835.00 m' and construction of the public sewer system in the length of 722.18 m' in the settlement of Cagar, and rehabilitation of the water pressure pipeline PS Šije – WT Kosa in the length of 387.78 m', with the development of implementation designs, as-built survey, report on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 3 - Rehabilitation of transmission pipeline WT Sv. Ilija – WT Nadvučnik. The project includes the construction of a bypass, the replacement of 7,449 m, and the development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits.
- Department of InsolvencyΛευκωσίαFrist: 05. Mai
Provision, implementation, maintenance and operation of an Integrated System for the Department of Insolvency (DoI) and the provision of Infrastructure as a Service (IaaS)-TA 03/2024
Provision, implementation, maintenance and operation of an Integrated System for the Department of Insolvency (DoI) and the provision of Infrastructure as a Service (IaaS)
- Helse Sør-Øst RHFHAMARFrist: 30. Apr.
Request for information (RFI) Digital twin - from engineering design services to operation and re-engineering design - the Hospital projects in Oslo.
HSØ PO soll als Bauherr neue Krankenhäuser mit Systemunterstützung für Gebäudebetrieb, Logistikkonzepte und technologische Systeme übergeben. Es werden Hypothesen getestet: Digitaler Zwilling zur Reduzierung von Betriebsabweichungen, gemeinsames Managementsystem für effizienten Betrieb, verbesserte Auslastung von Standorten zur Kapazitätserhöhung und Automatisierung für nahtlosen Übergang von Projekt zu Betrieb. Unterstützung für Control Tower-Funktionen außerhalb der Logistik wird untersucht.
- A/S ØresundKøbenhavn VFrist: 06. Mai
Tender for a Construction Agreement regarding Passing Tracks Kalvebod (Sub-project 2) Track and Catenary
On 4 April 2024, the Danish Parliament adopted the Act on the Upgrade of the Øresund Rail-way, which provides that two passing tracks shall be constructed at Kalvebod. A/S Øresund has been tasked by the Ministry of Transport to carry out the project 'Passing Track Kalvebod’. Several preliminary studies have been conducted to date, and material relating thereto is available at: https://sundogbaelt.dk/forbindelser/overhalingsspor/. The project thus comprises the establishment of two new tracks parallel to the two existing tracks. The project also includes a reconstruction of the Hammelstrupvej Bridge to accommodate four tracks instead of the current two tracks, and the replacement of two footbridges over the railway. The two new tracks shall have new catenary systems installed consisting of cantilever masts covering both tracks. The current neutral section shall also be relocated and pumping station 2 shall undergo certain modifications to make room for the new tracks. Sheet piling shall be installed along the entire stretch to retain the embankment and provide space for the two new tracks. The Passing Tracks Kalvebod project is being implemented in two sub-projects: Sub-project 1 “Structures and Civil Works” (“SP1”) and Sub-project 2 ”Track and Catenary” (“SP2”). SP1 comprises earthworks, drainage, structures and high-voltage installations (civil and construction works). SP2 comprises track and catenary (railway infrastructure). The execution of SP1 has been tendered as a separate design and build contract. The Contracting Entity has entered into a contract with the design and build contractor, and the works under that con-tract are ongoing. This tender concerns the contract regarding SP2, which comprises track and catenary (rail-way infrastructure). The activities in SP2 build upon the works carried out by the contractor for SP1. The project's safety objective is to maintain the existing safety level. A/S Øresund is the project owner and entity in charge of maintenance, whilst Banedanmark is the infrastructure manager. The tender procedure will be conducted as the competitive procedure with negotiation pursuant to Directive 2014/25/EU (the Utilities Directive).
- Haugesund KommuneHAUGESUNDFrist: 13. Mai
Framework agreement for the procurement and maintenance of welfare technology (a new notice).
The contracting authority shall procure technological welfare systems, primarily for six of the municipality ́s nursing home. It may, however, also be relevant to include other municipal institutions in the procurement. The procurement will include a welfare technological system, consisting of a platform, equipment and accompanying services.
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Mai
NL-Petten: The supply and installation of air handling units, replacing the existing ones in buildings 308 and 309.
The European Commission's Joint Research Centre (JRC) in Petten intends to replace the existing Air Handling Units (AHUs) and associated HVAC infrastructure located in buildings 308 and 309. The current ventilation systems are obsolete and have reached the end of their operational lifespan. Furthermore, preliminary technical assessments have indicated that the existing air renewal capacity is insufficient to maintain optimal indoor air quality for the occupants. To ensure a healthy, safe, and productive working environment, this procurement aims to upgrade the facilities. The primary objective is to improve indoor air quality, while simultaneously improving the overall energy efficiency of the buildings. The scope of this contract encompasses the supply, installation, and comprehensive commissioning of the new air handling systems and related infrastructure to provide a fully functional delivery. This includes the safe removal and disposal of the existing AHUs, roof support frames, humidification systems, and redundant cabling or piping, ensuring continuous operation of the buildings during the transition. The technical project involves replacing the units with new, highly energy-efficient equipment featuring heat recovery systems. Additionally, the contract covers the complete adaptation of the hydraulic system to operate under a new, lower-temperature regime, the installation of humidification systems, installing structural supports on the roofs, and the execution of all necessary electrical works. Finally, it requires the full integration of the new instrumentation and controls with the existing Siemens Building Management System (BMS), alongside essential auxiliary tasks such as ductwork cleaning.
- Institute of Public Administration_299DublinFrist: 05. Mai
Single-Party Framework Agreement for the provision, implementation, maintenance and support of a Learning Experience Platform (LXP) and related services for the Institute of Public Administration.
This Competition is for the establishment of a Single Party Framework for the provision, implementation, maintenance and support of a Learning Experience Platform (LXP) and related services using the competitive procedure with negotiation. The Learning Experience Platform (LXP) will form a key part of the IPA’s digital infrastructure, broadening and scaling digital learning across the Public Service and supporting modern, flexible approaches to capability development. Implementation of the LXP will be carried out in phased stages, prioritising a smooth migration of existing users from the current Learning Management System (LMS) before the platform is rolled out more widely across the Public Service. Please refer to the documents attached to this notice for full details of this Competition.
- Sectoral Procurement DirectorateFlorianaFrist: 30. Apr.
SPD3/2025/095 - TENDER FOR THE HIRING, INSTALLATION, TESTING, OPERATION AND DISMANTLING OF A PUBLIC ADDRESS (PA) SYSTEM FOR GOZO REGIONAL CARNIVAL 2026
The subject of this tender is the hiring, installation, testing, operation and dismantling of a Public Address (PA) system for Carnival Activities 2026 in Victoria Gozo.
- Statens vegvesenMoss
Establishment, operation and maintenance of a 24 hour resting place for heavy transport along the E18 stretch Asker-Sande.
The contracting authority invites tenderers to a competition for the establishment, operation and maintenance of 24 hour resting place(s) along the E18 stretch Asker-Sande. The driving distance from the E18 to the entrance for the actual 24 hour resting place shall be a maximum of 2 km. The contracting authority needs approx. 100 placement places on the stretch. It may be necessary to enter into a contract with several tenderers and/or divide the procurement into different sub-contracts. Each individual 24 hour resting place shall as a minimum have parking places for 15 wagon trains and shall include a service facility with toilets, showers, living rooms and charging stations. Otherwise, the 24 hour resting place shall fulfil the shall-requirements listed in point 3.2. The Contracting Authority prefers large 24 hour resting places and 24 hour resting places that are located on the stretch between Asker-Drammen. The 24 hour resting place shall be ready for opening by 01.09.2027 at the latest and the contract will be valid for ten years from the opening hours. The contracting authority has the option to extend the contract for 1+1 year, so that the total possible lease period is 12 years. The contracting authority will set up a scheme with payment for annual rent, which shall include establishment, as well as operation and maintenance of the 24 hour resting place.
- East Europe FoundationKyivFrist: 29. Apr.
Development of a Computer Program for Collecting, Accumulating, Processing, and Displaying Information on the Status of Implementation of State Policy in Real Time and during Runtime (hereinafter referred to as “Country Dashboard Computer Program”)
Development of the Country Dashboard Computer Program, which is intended for analyzing, visualizing, and exchanging information in terms of state policies, public services necessary for planning and implementing measures aimed at digital development, digital transformation, and digitalization at the state, regional, and local levels, making effective management decisions, and increasing public trust in government.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 13. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Gassco AS.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.