Scaffolding Works Vår Frue Church, Trondheim, Norway
This tender concerns solely the supply and erection of scaffolding. The works to be conducted within the scaffold are described to provide the necessary basis for the correct design and construction of the scaffolding.
Angebotsfrist:18. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
This tender concerns solely the supply and erection of scaffolding. The works to be conducted within the scaffold are described to provide the necessary basis for the correct design and construction of the scaffolding.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Kirkelig Fellesråd i Trondheim
- Veröffentlicht: 23. April 2026
- Frist: 18. Mai 2026
Ausschreibungsbeschreibung
This tender concerns solely the supply and erection of scaffolding. The works to be conducted within the scaffold are described to provide the necessary basis for the correct design and construction of the scaffolding.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Office of Public Works (OPW)TrimFrist: 12. Mai
The provision of Interpretation and Exhibition Design for a proposed new visitor facility building adjacent to the Casino at Marino, Cherrymount Crescent (off Malahide Road), Marino, Dublin.
Office of Public Works (OPW) wishes to appoint an Integrated Interpretation Team that shall be responsible for providing all the necessary consultancy services for Stage (I) Preliminary Design to Stage (V) Handover of Works. The following disciplines are relevant to this project: • Interpretive Design Services • Interpretive Research services • Project Management Services • Graphic Design Services • AV / Film Technical Design Services • Procurement services • Quantity Surveying/Cost Management Services • PSDP Services • Script Writing The Integrated Interpretative Team will be responsible for providing all interpretive and associated construction/fitout-related technical advice and design services to the OPW Client for the Project. The Consultant will be required to provide all necessary services including the Stage Services, described below and elsewhere in the contract. The Integrated Interpretation Team shall be required to consult and liaise with all affected stakeholders to facilitate timely design and construction/fitout of the works and to minimise impacts on those affected. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. As noted in 4.3.9.1, It is expected that within the team there will be a Specialist AV / Film Advisor available to provide advice to the team during all stages of the design and fit out process. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. The Team shall be led by an Interpretative designer with a track record of successfully carrying out similar works. Interpretive Research services need to include (a named) suitably qualified person able to collate/and or undertake subject matter research feeding into interpretative design, narrative development and Script Writing. The Team may be formed by a single consultant with in-house specialists or may be a group of consultants who have combined to form a team. In the latter case the Team Leader shall be an Interpretative designer who shall be clearly identified in their Tender Submission as the Lead Tenderer and shall be the entity that enters into a contract with OPW for the delivery of the Services. Other Team members shall be sub-consultants to the Lead Tenderer. Note - The cost of the works will be required to align with the available budgets. The consultant shall refine / revise designs as necessary during the lifetime of the project to achieve this, in consultation with OPW. Full list of requirements are contained within the tender documents.
- Oberstown Children Detention CampusOberstown, Lusk, Co. DublinFrist: 18. Mai
Oberstown Small Capital Works Framework
This is a two stage tender competition which intends to establish a multi provider Framework Agreement between Oberstown Children Detention Campus and the successful Candidates for procuring Minor Capital Works. The first stage is a Suitability Assessment Questionnaire (SAQ) to shortlist ten (10) Candidates who will be invited to tender (provided ten Applicants submit compliant PQQ Responses that meet the minimum requirements). If there is more than one Applicant ranked at tenth place, all the tenth placed Applicants will be invited to tender. The second stage will be a tender competition to appoint a maximum of six (6) Tenderers to the Framework (provided six Tenders are compliant and meet the minimum requirements). If there is more than one Tenderer ranked at sixth place, all the sixth placed Tenderers will be appointed to the framework. The scope of the Capital Works Framework will cover a wide variety of minor projects relating to all Mechanical, Electrical, Building Fabrics, Infrastructure, Fire Safety and other assets on the campus. A non-exhaustive list of possible works: • Minor building extensions • Demolition works • Refurbishment / Renovations / Upgrades of existing buildings (exterior and interior works) • Office fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Control Room fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Upgrade / replacement of critical Mechanical and Electrical systems that serve our office buildings and our critical assets such as Data Centres, Control Room and Disaster Recovery Sites • Building fabric upgrade and replacement (facades and roofs) • Life Safety Systems i.e., emergency lightening and fire safety • Electrical Systems i.e Specialist Security System • Energy Systems installations and upgrades (LED upgrades, solar panel and heat pump installations) • Site infrastructure works such as retaining walls, underground utilities, roads, pavements, compounds and security fencing • Hard and soft Landscaping • The role of Project Supervisor Construction Stage and Contractor, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope • In some cases, role of Designer, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope. For example, where: (a)Specialist permanent works design may be required in the case of electrical, mechanical, structural or architectural; and (b) Where temporary works design may be required such as shuttering, traffic management, temporary electrical systems, propping, supporting, specialist scaffolding etc. The term of the framework will be 3 years, with options to renew with 1 + 1 years, if deemed appropriate.
- Beaumont Hospital_403DublinFrist: 17. Apr.
THE PROVISION OF MECHANICAL CONTRACTORS’ SERVICES FOR MAINTENANCE AND SMALL PROJECT WORKS
Beaumont Hospital intends to establish a framework agreement for the provision of mechanical contractors’ services for maintenance and small project works which will include a range of mechanical works, to be conducted on an ‘as-needed’ basis.
- Beaumont Hospital_403DublinFrist: 14. Mai
Call for Expressions of Interest - Contract for the Provision of Car Parking Facilities
The Contracting Authority intends to appoint a suitably-qualified and experienced economic operator to provide it with access to offsite car-parking facilities. The successful economic operator will be remunerated for the provision of the facilities in question by way of recurring payments under a service contract. The Contracting Authority requires access to approximately 500 car-parking spaces within a radius of five kilometres of its main campus. It is a highly desirable requirement that the successful tenderer has the capacity to make an additional 500 car-parking spaces available during the currency of the contract. The spaces may be located on one site, or across multiple sites. In the event that the spaces are located across multiple sites, the Contracting Authority has a distinct preference for sites that are distributed and located in a manner that will enable the efficient transfer of staff between the sites and the Contracting Authority’s campus. The successful tenderer will assume responsibility for any design and construction activities necessary to develop the facilities prior to use by the Contracting Authority’s staff. In this regard, the successful tenderer shall engage any necessary design and construction professionals, shall procure and manage all necessary design and construction work and shall assume responsibility for discharging all statutory obligations associated with any initial development of the facilities. In accordance with Article 10(a) of Directive 2014/24/EU, as the subject-matter of this competition ultimately concerns the acquisition of land for subsequent utilisation by the Contracting Authority, this competition does not fall under the scope of the public procurement regulations. Nonetheless, on a voluntary basis, and in order to ensure transparency and contractual certainty, the Contracting Authority is advertising this opportunity via the Irish Government’s Procurement Opportunities Portal (www.etenders.gov.ie). Additionally, the Contracting Authority is employing an award procedure analogous to the competitive procedure with negotiation (as described by Article 29 of Directive 2014/24/EU) in order to award this contract. Economic operators are advised, however, that as this competition is not subject to the public procurement regulations, the Contracting Authority shall be entitled to avail of a degree of procedural flexibility when conducting this competition.
- STATSBYGGOSLOFrist: 11. Mai
2025/4803 Parallel framework agreement for construction management area Inland
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
- STATSBYGGOSLOFrist: 11. Mai
2025/4805 Parallel framework agreements for construction management area Vestfold, Telemark and the lower part of Buskerud.
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
- STATSBYGGOSLOFrist: 11. Mai
2025/4804 Parallel framework agreement for construction management area Agder
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
- STATSBYGGOSLOFrist: 11. Mai
2025/5804 Parallel framework agreement for construction management area Trøndelag
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
- STATSBYGGOSLOFrist: 11. Mai
2025/4803 Parallel framework agreement for construction management area Inland
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
- STATSBYGGOSLOFrist: 11. Mai
2025/4805 Parallel framework agreements for construction management area Vestfold, Telemark and the lower part of Buskerud.
Statsbygg requests tender offers on parallel framework agreements for construction manager, builder ombudsman and SHA coordinator for the execution phase (KU) Three parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 18. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Kirkelig Fellesråd i Trondheim.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.