Periodic Subsea Inspections - Offshore Wind Farms in the North Sea
Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections sh...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: EnBW Energie Baden-Württemberg AG
- Veröffentlicht: 26. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
1 Datei erfasst- Bekanntmachung
Ähnliche Bekanntmachungen
10- EnBW Energie Baden-Württemberg AG
Subsea Inspection
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
- Elektrownia Wiatrowa Baltica – 2 SP. Z o.o.WarsawFrist: 21. Mai
Baltica 2 Offshore Wind Farm Construction phase Supply Runs Vessel
The contract regards supply runs vessel service regarding Baltica 02 Offshore Wind Farm Project and its crew shall be capable of completing the following activities relevant for the operation, including but not limited to: - cargo transfer between port, windfarms and offshore vessels - 24/7 guard vessel duties
- Wind Energy IrelandNaasFrist: 13. Apr.
Offshore Wind Energy (OWE)
The aim of this project is to develop and deliver an Offshore Wind Energy (OWE) careers platform as a foundational element of the broader National Offshore Wind Skills Training Hub. This initiative is a direct response to key sectoral reports, including Building our Potential: Ireland’s Offshore Wind Skills and Talent Needs (GreenTech Skillnet, 2024) and the Offshore Wind Skills Action Plan 2024 (DFHERIS).
- DRAMMEN KOMMUNEDRAMMEN
Framework agreement for checking playground equipment
The agreement includes inspections of playground equipment in schools, nurseries, community facilities, playgrounds and ball places. The inspections shall be carried out through annual main inspections and periodic inspections, as well as the delivery of reports. A framework agreement will be signed with one tenderer. The contract period is 2 years. The contract can be extended for 1+1 year.
- Tuath Housing Association LtdDublinFrist: 05. Mai
Multi-Party Framework Agreement for the provision of Periodic Electrical Inspections (PIRs) and Domestic Life Safety System (DLSS) Inspections and associated repairs
Tuath Housing Association invites tenders from suitably qualified and experienced electrical contractors for inclusion on a multi-supplier framework agreement for the provision of Periodic Electrical Inspections, Domestic Life Safety System Inspections, and associated upgrade and/or repair works across designated residential properties within its housing stock. The framework agreement will comprise two initial lots. The first two lots will be awarded to the two tenderers submitting the top two Most Economically Advantageous Tenders (MEAT), as evaluated in accordance with the criteria set out in the tender documentation. Any third and subsequent call-off contracts under the framework will be awarded by way of mini-competition among all appointed framework members, in accordance with the terms and conditions of the framework agreement. Tenderers are requested to consult the accompanying tender documentation for full details of the requirements, scope of services, and evaluation methodology.
- Oslobygg KFOsloFrist: 18. März
Procurement of a turnkey contract Hellerud VGS - renovation
PURPOSE AND SCOPE The procurement is for the renovation of Building G at Hellerud Sixth Form College. The works include the complete upgrading of all surfaces in Level 2, all windows and doors shall be upgraded, the facade shall be reinstated to the original expression. See the requirement specifications for further documentation.
- Ministerie van Economische ZakenDen HaagFrist: 22. Mai
Seabed Morpholgical and Scour Assessment Study for Doordewind WFZ
The Netherlands Enterprise Agency (RVO) is preparing a Tender for the execution of Seabed Morpholgical and Scour Assessment Study for Doordewind Wind Farm Zone. The objective is to conduct a study, by utilising available data from surveys and other sources of information, to improve the understanding of the seabed morphology and morphodynamics of the Doordewind Wind Farm Zone. The study will consist of analyses of the autonomous seabed dynamics and also the potential for scouring that is to be expected as a result of the installation, and operation and maintenance, of offshore wind farm infrastructure at the sites. -
- Cork County CouncilCorkFrist: 08. Mai
Engineering Inspections of Regional and Local Road bridges in the East and North Regions within the Cork County Council Administrative Area 2026
Cork County Council wishes to appoint a Consultant to undertake Structural Inspection of Regional and Local Road bridges in the East and North Regions within the Cork County Council Administrative Area. Previous PI’s were previously undertaken for most of the structures, however all are in excess of five years since last inspected. The data captured from the survey will be uploaded onto the DoT Pavement Management System, which includes a module for Bridge Asset Management. Regional and Local Bridges – 633
- FREDRIKSTAD VANN AVLØP OG RENOVASJONSFORETAK FREVAR KFFREDRIKSTADFrist: 28. Mai
the hire of site machines/various services/procurement of matter.
The hire of site machines as needed and various services/procurement of matter in accordance with the description in the price form. The prices shall be stated in the price form. All the items in the price form must be filled in. The prices shall include all costs.
- NTNUTrondheimFrist: 29. Mai
Framework agreement for inspections and maintenance of gas alarms.
NTNU shall enter into a framework agreement for the inspection and maintenance of a gas alarm system for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. See Annex 1c Site Overview for a more detailed description of the different installations, including location and type. The framework agreement includes the following works: Annual inspections The annual inspection includes two meetings, in one turn, a check of the gas warning system + one calibration is carried out in the second turn-out, only one calibration will be carried out. Maintenance Maintenance means repairs, replacements and improvements of deviations (errors and shortcomings) on the installations in order for them to function as intended. See the requirement specifications for a comprehensive description of the delivery. The planned start-up for the new contract is in the medio August, so that the autumn inspections shall be carried out under this agreement.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist EnBW Energie Baden-Württemberg AG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.