Subsea Inspection
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore sub...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). A...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: EnBW Energie Baden-Württemberg AG
- Veröffentlicht: 27. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs. Lot 2: Periodic Subsea Inspections - Offshore Wind Farms in the North Sea Lot 2 covers the periodic subsea inspections for the offshore wind farms Hohe See (HS), Albatros (ALB), and He Dreiht (HD). The scope includes visual and functional inspections of underwater support structures of WTGs and OSSs. All inspections shall be performed in accordance with the applicable standards of the BSH and the respective wind farm-specific inspection plans. In HS and ALB, 21 to 22 WTGs shall be inspected annually (25% scope). The OSS in each wind farm is subject to a four-year inspection cycle. In HD, which is currently under construction, 16 WTGs shall be inspected annually (25% scope). The inspection scope is based on applicable standards and is expected to be updated as the project progresses. The inspections may involve either full visual and functional checks or reduced GVI. Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as ROVs. All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition to the base scope, bidders shall provide daily rates for optional services such as re-inspections, spot checks, or minor recovery works using ROVs.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- DRAMMEN KOMMUNEDRAMMEN
Framework agreement for checking playground equipment
The agreement includes inspections of playground equipment in schools, nurseries, community facilities, playgrounds and ball places. The inspections shall be carried out through annual main inspections and periodic inspections, as well as the delivery of reports. A framework agreement will be signed with one tenderer. The contract period is 2 years. The contract can be extended for 1+1 year.
- Ministerie van Economische ZakenDen HaagFrist: 22. Mai
Seabed Morpholgical and Scour Assessment Study for Doordewind WFZ
The Netherlands Enterprise Agency (RVO) is preparing a Tender for the execution of Seabed Morpholgical and Scour Assessment Study for Doordewind Wind Farm Zone. The objective is to conduct a study, by utilising available data from surveys and other sources of information, to improve the understanding of the seabed morphology and morphodynamics of the Doordewind Wind Farm Zone. The study will consist of analyses of the autonomous seabed dynamics and also the potential for scouring that is to be expected as a result of the installation, and operation and maintenance, of offshore wind farm infrastructure at the sites. -
- Iarnród Eireann-Irish RailDublinFrist: 07. Mai
9661 Qualification System for Bridge and Riverbed Inspections
IÉ invites applications to participate in the pre-qualification process to appoint suitably qualified companies to a qualification system for Bridge and Riverbed Inspection Services that may arise on an ad-hoc basis. Those companies successfully appointed to the Qualification System will receive all future tender enquiries. Iarnród Éireann has over 450 bridges (structures greater than 2m) over water. All these bridges and riverbeds require periodic inspections. Some inspections are carried out yearly, other are every 3 years and more are on a 6 yearly cycle. Iarnród Éireann is looking to appoint specialist expertise to undertake inspection of railway bridges that traverse water courses as well as carry out bridge and river surveys. The applicants are to provide expertise in the following areas: • Provide Health and Safety and Risk Assessment plans for the specific work • Provide qualified divers/surveyors for a bridge and riverbed inspections/surveys • Record the topography using surveying techniques • Using the previous base line surveys (supplied by IÉ) identify changes in the structure and/or the river channel. • Provide factual report on findings. • Provide for Engineers review (review undertaken by a Chartered Civil Engineer) of the factual report before the reports are issued to Irish Rail. The Qualification System is also to include for inspection of any structure following a major flood event. In the period after a flood event, structures throughout the IÉ network may need to be inspected to determine the extent, if any, of damage caused by the event.
- FREDRIKSTAD VANN AVLØP OG RENOVASJONSFORETAK FREVAR KFFREDRIKSTADFrist: 28. Mai
the hire of site machines/various services/procurement of matter.
The hire of site machines as needed and various services/procurement of matter in accordance with the description in the price form. The prices shall be stated in the price form. All the items in the price form must be filled in. The prices shall include all costs.
- RTE Réseau de Transport d'ElectricitéParis la Défense CedexFrist: 23. Mai
Curative maintenance of submarine cable links – Marine operations
RTE, the French electricity transmission system operator, is responsible for developing, building and operating high-voltage submarine cable links for interconnection with neighboring countries, or for connecting offshore wind farms to the terrestrial transmission grid. RTE currently operates a wide range of submarine cable links on the Manche Channel, Atlantic and Mediterranean facades. In the future, the number of submarine cable links shall further increase with the development of HVDC long distance submarine cable links to offshore wind farms. These submarine cable links can be floating or laid on the sea floor. In this context, RTE is preparing for curative maintenance of several submarine cable links of its current and future networks on both Channel/Atlantic and Mediterranean facades. Curative maintenance of RTE networks is to be planned on HVAC (including floating technology) and HVDC bundle submarine cable links. In case of HVDC, maintenance operation shall cover handling of bundled cables (Two power cables and one fiber optic cable). This curative maintenance shall encompass the means and personnel necessary to perform the Marine Operations scope which comprises: 1) Fault location along full cable length, i.e. from landfall to OSS hang-off; 2) Spread deployment to ensure cable repair, i.e. a) Vessel and equipment mobilization; b) Cable system spare load out at storage facility located in French harbors, RTE being responsible for cable system availability up to the quay edge; c) Deburial of faulty section; d) Cable cutting and preparation onboard for repair; e) Pull-in at OSS or landfall if required; f) Joint deployment; g) Cable system repaired section reprotection. The jointing operation is excluded from this scope of work. RTE would like to investigate ways to perform the above-mentioned Marine Operations scope and particularly on ways to limit the return-to-service time after a default and maintain a cost-effective approach. In order to achieve these two main objectives; this periodic indicative notice is designed to permit RTE to exchange both with marine operators and intermediaries (brokers). Hence, this periodic indicative notice aims to encourage the market to have its various actors emerge and help RTE identify them. It shall also allow the market to clarify its capacity of service with respect to RTE periodic indicative notice and propose adapted and robust solutions.
- Wind Energy IrelandNaasFrist: 13. Apr.
Offshore Wind Energy (OWE)
The aim of this project is to develop and deliver an Offshore Wind Energy (OWE) careers platform as a foundational element of the broader National Offshore Wind Skills Training Hub. This initiative is a direct response to key sectoral reports, including Building our Potential: Ireland’s Offshore Wind Skills and Talent Needs (GreenTech Skillnet, 2024) and the Offshore Wind Skills Action Plan 2024 (DFHERIS).
- Fluxys Belgium n.v.EtterbeekFrist: 17. Mai
Supply of ultrasonic flowmeters
The purpose of the qualification is the supply of Ultrasonic Flowmeters for use in High Pressure (MOP = 84 bar) natural gas pipeline transportation systems. The scope includes UFM(P) from DN100 to DN500, designed in accordance with ISO17089 and FLUXYS specifications 4.90000/09019, 4.90000/00071 and 4.90000/09979. All flowmeter packages (UFMP) shall be delivered with EN 10204 type 3.1 material certificates. Bidders shall also have to bid, as an option, EN 10204 type 3.2 certification, with the cost indicated separately in the bid.
- Veitur ohf.Reykjavik
Service and maintenance for Veitur´s utilities grid
The Purchaser intends to enter into a framework agreement, with a maximum of three Contractor(s), for a Services frame agreement for its grid service and maintenance based in Iceland. The scope shall include works in all of the Purchaser utilities e.g. Electricity (400V up to 33kV grid), Hot Water, Cold Water, and Sewage. The scope shall include in whole or in part: • Maintenance of existing grid infrastructure • Fault Repair of existing grid infrastructure • Renewal of existing grid infrastructure • Installation of new utility systems • New Building Connections to existing grid and grid changes necessary to secure new building connections • New installation and maintenance of sub-stations • New installation and maintenance of street cabinets • End to End Responsibilities shall include, but not limited to: • Preparation (e.g. permits, licenses, planning) work prior to execution of work • Project management and supervision • Qualified field resources to perform work • Qualified resources to perform own inspections during the work to be performed • Other supporting functions with respect to the work to be performed • Security measures • Warehousing, Material and Equipment as a part of performing the Services. (i.e. including purchasing, storage and end-to-end management of all material required to perform work, unless otherwise specified by the Purchaser) • Supporting IT Systems required for the performance of Services
- Elektrownia Wiatrowa Baltica – 2 SP. Z o.o.WarsawFrist: 21. Mai
Baltica 2 Offshore Wind Farm Construction phase Supply Runs Vessel
The contract regards supply runs vessel service regarding Baltica 02 Offshore Wind Farm Project and its crew shall be capable of completing the following activities relevant for the operation, including but not limited to: - cargo transfer between port, windfarms and offshore vessels - 24/7 guard vessel duties
- Health Service Executive (HSE)KildareFrist: 30. Apr.
Fire Upgrade Works at Green Acres Residential Care Facility, Cloncoose, Co. Longford, N39 V2K2.
The scope of works at Green Acres is to provide fire upgrade works throughout the property. The proposed works will be subject to fire regularisation by Fire Consultant ORS, and the successful Contractor must provide all the documentation set out in the “Third Party Documentation” PDF that outlines the certification required upon completion of the works.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist EnBW Energie Baden-Württemberg AG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.