DUV Stepper
To ensure the continuation of small and medium sized companies chip production and development in Danmark DTU Nanolab want to purchase a new (non-refurbished) DUV stepper using a 248 nm wavelength laser as illumination source (KrF laser unit from CYMER). It must furthermore be possible to handle several different wafer...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
To ensure the continuation of small and medium sized companies chip production and development in Danmark DTU Nanolab want to purchase a new (non-refurbished) DUV stepper using a 248 nm wavelength laser as illumination source (KrF laser unit from CYMER). It must furthermore be possible to handle several different wafer types and sizes:...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Danmarks Tekniske Universitet - DTU
- Veröffentlicht: 09. März 2026
- Frist: Nicht angegeben
- Thema: Laborinstrumente
Ausschreibungsbeschreibung
To ensure the continuation of small and medium sized companies chip production and development in Danmark DTU Nanolab want to purchase a new (non-refurbished) DUV stepper using a 248 nm wavelength laser as illumination source (KrF laser unit from CYMER). It must furthermore be possible to handle several different wafer types and sizes: Wafer materials: Silicon, LNOI, Borofloat, quartz, III-V Wafer sizes in diameter: 100mm, 150mm and 200mm, furthermore it must be equipped with a multi wafer handl
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
5- Danmarks Tekniske Universitet - DTUKgs. LyngbyFrist: 05. März
DUV Stepper
DTU Nanolab beschafft einen neuen DUV-Stepper (248 nm, KrF-Laser von CYMER) für die Chip-Produktion. Anforderungen: Handling von Wafern (Si, LNOI, Borofloat, Quarz, III-V) in 100/150/200 mm, Dicke 350-1000 µm, Bow bis +/- 200 µm, Notch/Flats. Inkl. Multi-Wafer-Kit für schnellen Wechsel, Through-Silicon-Alignment, Off-Axis/Dipol-Beleuchtung. Kompatibilität mit FPA-3000EX4 (Reticles/Job-Files) erforderlich. Max. Stellfläche: 2000x3000x2700 mm (BxTxH).
- TEKNOLOGIAN TUTKIMUSKESKUS VTT OYVTTFrist: 25. Mai
DUV Stepper 200mm
THE OBJECT OF THE TENDER PROCESS The object of the procurement is DUV Stepper 200 mm. The technical specification of the object of the tender and its minimum requirements is described in more detail in this Annex 1 of the invitation to tender. The tendered Tool must comply with all technical properties and functionalities, performance specifications and acceptance criteria as set out in Annex 1 and Annex 2 (“Facilities, materials and connector types”). A tender which does not meet one or more of the requirements specified in the Annex 1 and Annex 2, may be rejected for failing to comply with the call for tenders. The comparison criterion for the tenders is economic advantageous (see section "Grounds for decision") with 80 % price weighting and 20 % quality weighting. A reference price has to be given for the equipment that meets all the requirements set in the invitation to tender, especially its Annex 1. Partial tenders will not be accepted. NON-MANDATORY OPTIONAL FEATURES Please see Annex 1 section 2.7 of the invitation to tender.
- Fraunhofer-Gesellschaft - Einkauf B12
300mm fully automated high resolution in-line CD and overlay (IZM-133.1) - PR1191754-3460-P
1 piece: 300mm fully automated high resolution in-line CD and overlay (IZM-133.1) The following equipment specification defines the requirements for a fully automated metrology tool to measure overlay and critical dimension (CD) structures on 300 mm and 200 mm wafers, produced using laser direct imaging (LDI) and i-line lithography. This investment expands the metrology capability for automated measurement of smaller feature sizes. The tool is essential for non-destructive characterization of highly integrated, chiplet-based 2.5D/3D and quasi-monolithic package architectures with sub-micrometer feature sizes. The equipment is compatible with 3D wafer stacks exhibiting high warp/bow. Wafer substrates are silicon and/or glass, with thicknesses up to 2.5 mm. Before processing, wafers are delivered to the tool in front-opening unified pods (FOUPs), which the operator manually places on the respective load ports. The new tool must be able to perform the following sequence of steps fully automatically: - Load designated wafers from the FOUP(s) - Execute metrology tasks - Return wafers to their original positions in the FOUP(s) Recipe programming must support a sufficiently wide range of options and parameters to meet research and development (R&D) needs. It is required that the equipment continuously performs the intended functions without interruptions or failures, in accordance with all requirements specified in this document. Furthermore, the equipment must be supplied with all items described below that are necessary for it to deliver the intended functions and capabilities in compliance with all requirements set out in this document.
- Gas Networks IrelandCorkFrist: 09. Apr.
25/064 - Qualification System for for the provision of Polyethylene (PE) Pipe, Fittings and Valves
The objective of this QSQ is to qualify Applicants onto the Qualifications System for the manufacturing and supply of Polyethylene (PE) Pipe, Fittings and Valves for Gas Networks Ireland. The proposed supply requirements are to be divided into four (4) separate lots as detailed below: • Lot 1 (PE Pipe 90mm - 400mm) – Manufacture and supply of PE pipe for gas. • Lot 2 (PE Pipe 20mm - 63mm) – Manufacture and supply of PE pipe for gas. • Lot 3 (PE Fittings) Manufacture and/or supply of PE Fittings for gas. These include but are not limited to PE; caps, couplings, elbows, equal tees, flange adaptors, reducers, tee branch saddles, tees, tapping tees, G clamp adaptors, multi tap tees, branch saddles, bends, unequal tees and end caps. • Lot 4 (PE ball valves) – Manufacture and/or supply of PE Valves for gas. These include but not limited to valves ranging in size from small diameter 20mm to larger diameters up to 315 mm. Please note: Lots 1 and 2 relate to manufacture and supply requirements. Lots 3 and 4 relate to manufacture and/or supply requirements. The requirements for the manufacture and/or supply of pipes, fittings and valves under this Qualification System will include arrangements for delivery to various stipulated depot destinations on the island of Ireland and the ability to operate a national distribution network. Applicants should note that from time to time over the term of the Qualification System, the Contracting Entity, at its sole discretion but without altering the overall nature of the Qualification System, may modify the Qualification System to reflect changes in its requirements. Such modifications may include changes to the pipe diameter and pressure rating which may result in an increase to the pipe size, wall thickness and pipe properties or specification and the provision of services or additional supplies associated with such changes. The Contracting Entity will also seek similar changes to pipe fittings and valves. The conditions under which such an option may be exercised by the Contracting Entity will be outlined in the relevant call off competition document. The Contracting Entity also reserves the right to add additional lots to the Qualification System. Applicants may apply for qualification in one or more lots. At the discretion of the Contracting Entity a full site visit and audit of the prospective Qualified applicants supply chain manufacturing facility(s) will be carried out to validate and support their pre-qualification submission. In the event of a site visit and audit being carried out to pre-qualify the Supplier must successfully pass this site inspection audit. It is envisaged that the scope of products and services of the initial Call for Competition to be drawn-down under the Qualification System will be, but not limited to; PE pipes, fittings and valves and will cover the following: 1. Standards: • Gas - as per I.S. EN 1555 or equivalent. 2. Indicative Diameter Range: • PE pipe, fittings and valves ranging in size from small diameter 20mm to large diameter 400 mm pipe and fittings. 3. Indicative Pipe Specification/Types: • Solid wall pipe; • Coextruded pipe; • Peelable pipe; and 4. Indicative Pressure Range and Pipe Materials : Pipe Material/Description Pressure Range (Barg) PE 100 (SDR 11) 7 PE 80 (SDR 11) 4 PE 100 (SDR 17) 4 PE 80 (SDR 17) 2 5. Colour • PE80: solid wall PE pipe in yellow colour • PE80: c-extruded wall PE pipe with outer layer in yellow colour • PE100: solid wall PE pipe in orange colour (sizes 180mm and above) • PE100: PE 100 PE pipe with peelable outer layer in yellow colour (with stripes) • Pipes for proof-of-concept hydrogen projects shall be yellow with blue axial stripes.
- Westinghouse Electric Poland Sp.z.o.oKrakówFrist: 30. Apr.
Fabrication of Reactor Vessel Flow Skirt (RVFS) (Commodity Code MI01) for Poland AP1000® Project
1. Experienced manufacturers / Fabricators capable of fabricating and furnishing the AP1000® RVFS (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar components of around 3.4m outer diameter and 0.4m height; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets, or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include the information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for unit one (1) of the three (3) unit project. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam butt welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the prequalified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD . Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded. 13. The procedure for companies to gain access to proprietary information, if required, will be subject to compliance with the executed PIA /NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFP document. 14. If a large number of companies express interest and submit a completed AP1000 Supplier Questionnaire, the Contracting Authority reserves the right to conduct a preliminary down-selection of companies that demonstrate the highest qualification, capacity, and capability to perform the required scope of work. 15. The Contracting Authority also reserves the right to exclude any of the following from this Competitive Bidding process: A. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or B. economic operators who rely in the Competitive bidding process on capacities of any entities from countries not covered by the GPA with the EU. All such decisions by the Contracting Authority are final and shall not be subject to complaint or dispute. 16. The Customer shall be responsible for monitoring of the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Danmarks Tekniske Universitet - DTU.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.