Conservation refurbishment of Traditional Wooden Sash Windows Ballina Mayo
Conservation refurbishment of Traditional Wooden Sash Windows Ballina Mayo
Angebotsfrist:25. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Conservation refurbishment of Traditional Wooden Sash Windows Ballina Mayo
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Ballina Convent Regeneration CLG
- Veröffentlicht: 05. Mai 2026
- Frist: 25. Mai 2026
- Thema: Fenster & Türen
Ausschreibungsbeschreibung
Conservation refurbishment of Traditional Wooden Sash Windows Ballina Mayo
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
5- Ballina Convent Regeneration CLGBallinaFrist: 12. Mai
Minor Conservation Works to Protected Convent
Supply of services; conservation and preservation works to a protected structure; the Sisters of Mercy Convent in Ballina, County Mayo. The proposed works comprise the repair and reinstatement of key external elements of the building, aimed at preventing further deterioration and improving weathering performance. Stained Glass Repairs - Repair of existing stained-glass windows, including the replacement of approximately 43 damaged pieces to match existing. Works will be undertaken in situ where possible, with one feature panel removed for specialist workshop repair and reinstated on completion. Timber Door Restoration (External) - Careful stripping, preparation and refinishing of 5 no. external double timber doors. Works include minor localised repairs and the application of a suitable protective stain and varnish system. Timber Sash Windows (New) - Manufacture and installation of 4 no. traditional 1-over-1 timber sash windows, including box frames, pulley, cord and counterweight systems, fitted into existing opes with minimal intervention. These are to replace the broken aluminium windows on the west elevation. Rainwater Goods - Installation of cast iron ogee gutters (client supplied) and associated downpipes, including all fixings, alignment and testing to ensure proper drainage.
- Office of Public Works (OPW)TrimFrist: 27. Mai
Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin 1
Conservation Architect consultancy services for The Refurbishment, Fitout and Historic Building Retrofit of Áras Mhic Dhiarmada/Busáras, Store St, Beresford Place, Dublin 1
- Carlow County CouncilCarlowFrist: 15. Mai
Quantity Surveying and Project Management Consultancy Services for The Refurbishment and Adaptive Reuse of the former Bank of Ireland Premises and Associated Site Works at Court Place, Carlow
Carlow County Council (the Contracting Authority) is procuring Quantity Surveying and Project Management Consultancy Services to support the delivery of the refurbishment and adaptive reuse of the former Bank of Ireland premises and associated site works at Court Place, Carlow. The Project is a heritage-led regeneration initiative involving the conservation, refurbishment and reuse of protected structures, the upgrade and deep retrofit of later extensions, and associated public realm and site development works as a single integrated scheme.
- Offaly County Council_448TullamoreFrist: 03. Juni
Multi-Party Framework Agreement for Architect-Led Integrated Design Team Services for Architectural Design, Refurbishment and Conservation projects with an initial contract for Daingean Courthouse.
Offaly County Council is seeking to establishMulti-Party Framework Agreement for Architect-Led Integrated Design Team Services for Architectural Design, Refurbishment and Conservation services with an establishing project of Daingean Courthouse. The project brief contains additional details relating to the projects that may be initiated by Donegal County Council, Laois County Council, Leitrim County Council and Sligo County Council under this framework on the same terms as this ITT and its associated documents.
- Dublin City CouncilDublinFrist: 05. Juni
DCC - Expression of Interest for Multi-Party Framework Agreement for Works Contractors on foot of an initial call-off contract for Pearse House
The Contracting Authority proposes to engage in a competitive process to establish a multi party framework agreement for Works Contractors to carry out investigations, repairs, retrofit and renewal works to Dublin City Councils properties, and adaptive reuse of suitable buildings as housing. DCC have a project pipeline for refurbishment of c. 750 homes in a range of building types including multi-unit buildings i.e. 4 and 5 storey flat blocks, protected structures and own door properties. It is also envisaged that stand alone precinct improvements works will be carried out to a number of flat complexes, and for adaptive re-use of existing buildings to provide quality homes. Standalone enabling and building investigation works maybe also required to be carried out on projects. Projects will be tendered and Contractor will be appointed as per CWMF guidelines. Construction contracts maybe delivered in-phases as set out in specific tender documents. Project requirements will be specific to each project with primary requirements including: - Carry out all duties outlined within the Building Control (Amendment) Regulations S.I.9 of 2014. The Contractor will comply with the Building Control Regulations 1997 - 2014 and with the Code of Practice for Inspecting and Certifying Buildings and Works, issued by the Department of Environment, Community and Local Government in 2014. For clarity the Builder is described as the Contractor as it is within the RIAI building contracts. - Comply with Safety, Health and Welfare at Work Act 2005 and Safety, Health and Welfare at Work (Construction) Regulations 2013 - Clearing and stripping out of existing services, fixtures and fittings - Removing Hazardous Materials identified in Works requirements - Demolitions and Alterations demolition of annex and outbuildings, modifications to dwelling layouts as identified in Works requirements forming or widening of existing opes - Substructures and Superstructure - underpinning, foundations and rising walls for any new above ground construction, extensions, interventions etc. - Conservation Repairs (where applicable) external wall repairs – existing brick, lime render repairs to external walls internally and externally, repairs and reglazing to existing sliding sash windows where possible, new windows to match existing where required. All historic features to be retained and made good or replaced like for like according to best conservation practices - Roofs – to include flat roof repairs, new roof over new constructions, re-slating of pitched roofs and general repairs. - Upgrade and repairs to external and internal fabric to achieve improved thermal, fire and acoustic standards. - Installation of new services – electrical, mechanical and plumbing, ancillary plant storage facilities - Installation of new fixtures and fittings - Construction of new works. - Site development works e.g. landscaping, installation of new services and drainage upgrades. - Public Realm upgrades, precinct improvements e.g. new bin stores, bike sheds, SuDs, landscaping. - Essential repair and stabilisation work required to limit further deterioration of the building. The period of the framework agreement will be four (4) years with a maximum value of €165,000,000 ex VAT. It is emphasised, however, that this figure is provided strictly for indicative purposes only as there is no guaranteed expenditure under the framework agreement. For the avoidance of doubt, the period for delivery of any contracts awarded under the framework may extend beyond the date of expiry of the framework agreement. The establishment of the framework agreement is subject to the provisions of Directive 2014/24/EC and is being awarded using the Competitive Procedure with Negotiation. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8015731. Please note that this project is subject to funding.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Ballina Convent Regeneration CLG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.