CABLE PLOUGHING - STRENGLÖGN - Kelduhverfi - Sandur - Norðurland
The project consists of installing approximately 3 km of high-voltage cable to replace the existing line. The construction period is from May 11 to June 16, 2026.
Angebotsfrist:08. April 2026
Typ:Ausschreibung