TO2-01: Þorlákshafnarlína 2, 132 kV underground cable Earthworks and installation of underground cable
The project involves excavating for and installing a 132 kV underground cable, Þorlákshafnar Line 2 (TO2), from a new terminal tower to be constructed on Sogslína 2 near Hveragerði to the substation at Þorlákshöfn (TOR). The cable route is approximately 21.2 km in length. A trench will be excavated for the cable, and t...