The procurement is for construction works for laying water pipelines in Mjøsa, for Gjøvik municipality. The contract also includes excavation on land, drilling on land against the sea, receiving and laying of PE pipes and pipe parts, delivery and assembly of load scales, refilling work, adjustments etc. PE pipelines ar...
Angebotsfrist:31. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The procurement is for construction works for laying water pipelines in Mjøsa, for Gjøvik municipality. The contract also includes excavation on land, drilling on land against the sea, receiving and laying of PE pipes and pipe parts, delivery and assembly of load scales, refilling work, adjustments etc. PE pipelines are to be delivered...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Gjøvikregionen - Anskaffelser
- Veröffentlicht: 03. Mai 2026
- Frist: 31. Mai 2026
- Thema: Leitungsbau
Ausschreibungsbeschreibung
The procurement is for construction works for laying water pipelines in Mjøsa, for Gjøvik municipality. The contract also includes excavation on land, drilling on land against the sea, receiving and laying of PE pipes and pipe parts, delivery and assembly of load scales, refilling work, adjustments etc. PE pipelines are to be delivered to the rigging site by the contracting authority by the pipe supplier. The rigging site will be selected by the tenderer. The delivery date must be adapted to the tenderer ́s progress, in the relevant time period. A binding delivery plan will be prepared in consultation with the pipe supplier and tenderer. Pipes are to be delivered and stored for 18 or 20 metres. The executing contractor on site shall be responsible for the development of rigging places and supply roads in a condition that enables deliveries of pipes up to the relevant delivery length. The receiving inspection and unloading of pipes from the vehicle will be carried out by the executing contractor in this contract. The work includes hammer drilling of 4 pipes under the E6 at Biri, as well as drilling uncompacted material from these pipes, through sheet piling for raw water pump station and into Mjøsa. The extraction of pipes to a raw water pump station and to a building pit by the E6.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Hå kommuneVARHAUGFrist: 12. Mai
Framework agreement for the procurement of Water and Sewage parts, PVC pipes, cast iron pipes, water pipeline fixtures and parts etc.
Hå municipality, hereafter called the contracting authority, invites tenderers to a competition for the delivery of PVC pipes, water pipeline fixtures and parts for sites and projects carried out on their own.
- Hå kommuneVARHAUGFrist: 24. Apr.
Framework agreement for the procurement of Water and Sewage parts, PVC pipes, cast iron pipes, water pipeline fixtures and parts etc.
Hå municipality, hereafter called the contracting authority, invites tenderers to a competition for the delivery of PVC pipes, water pipeline fixtures and parts for sites and projects carried out on their own.
- MiljødirektoratetTrondheim
Division of water sources in accordance with the Water Regulations
Completion of the division into water bodies in coastal water in accordance with new typology, and review and correction of errors in the division into fresh water sources. The Norwegian Environment Agency intends to expand the contract with Marbio AS 10 July 2024 for an updated division of water sources in coastal water in the Water Network. The division shall be based on new typology for coastal water and the existing division into the Water Network. The contract was signed after the project was announced in 2024 and Marbio AS was the only tenderer. A new tender contest will not be held because updating of the water resources division in coastal water has been far more time consuming than initially anticipated, and as the supplier has developed a method of execution of high professional quality and that provides an equivalent framework for division across water regions. It is crucial to have the same professional basis for division across regions, continuity of the work shall therefore form the basis for the assignment. The work has been almost completed, with only a few remaining water regions. A review and correction of errors must also be carried out in the division into fresh water instances. This work has started on the supplier for the northern part of the country and the supplier has seen that there are also several errors and shortcomings in the rest of the country that must be corrected. For the Norwegian Environment Agency it is important that the work in both fresh water and coastal areas is carried out in accordance with the same template and on the same terms throughout the entire country. This is best ensured by the tenderer continuing and finalising the started work.
- Helse Sør-Øst RHFHAMAR
Contract Contract 3012 Plumbing, Sanitation and Water Treatment, Somatics - New Aker
The aim of the procurement is to engage a tenderer who will be responsible for the services that shall be delivered in contract 3012 Plumbing sanitary and water treatment Somatics.
- Gloppen kommuneSandaneFrist: 05. Juni
Plumbing articles with materials.
Gloppen municipality shall enter into a framework agreement for the delivery of pipe species with accompanying materials. The contracting authority will enter into a contract with up to two tenderers. If a contract is signed with two tenderers, the assignment will be awarded in accordance with the following prioritising: The tenderer ranked as number one, shall be contacted first if delivery is required. If the tenderer cannot submit a deadline set by the contracting authority, assignments can be added to tenderers ranked second. Avtala comprises plumbing speciestar and materials for maintenance, improvements and minor construction work on all types of municipal buildings and sites. Avtala comprises executing pipe species residue. Service agreements are not included, but can be included when/if the noværande contracts are terminated or expired.
- Statsforvalterens fellestjenesterARENDALFrist: 13. Apr.
Investigation of a water environment in Åkersvika Nature Reserve
When E6 (highway) was buildt through Åkersvika nature reserve in 2014, many physical, chemical and biological examinations were carried out to document the pre-condition. The compensation plan states that the County Governor is responsible for carrying out subsequent investigations in order to document any changes. In 2026, there will be a recurrence of what was done in the water environment in order to detect any changes in the water ecosystem.
- Gjøvikregionen - AnskaffelserGJØVIKFrist: 13. Mai
BA-26-017-GK TEMPORARY SCHOOL PREMISES
The contracting authority shall procure the hire or purchase of module based temporary school premises for Hunndalen secondary school. The system shall be established for a use period of 24 months, with the planned start-up june 2027, and with options for early establishment and extension of the hire period on a monthly basis. The procurement includes a complete module school with the necessary teaching areas, group rooms, special rooms, adapted departments, administration areas, work places, libraries and storage areas, in accordance with the attached room and function requirements. Physical education is to be taken up outside the modular school. The delivery shall meet the current requirements in TEK17, regulations on environmental orientated healthcare, the workplace regulations and other relevant technical and authority requirements. If the establishment involves construction work, the builder regulations apply. The contractor shall deliver the complete establishment, technical completion and operational test at the latest four weeks before the start-up, as well as document energy performance, re-use systems and operational efficiency.
- AS Den Nationale SceneBergenFrist: 27. Apr.
Framework agreement for theatre engineering equipment for DNS ́s Modernisation project.
The contracting authority ́s objective with this procurement is to enter into a framework agreement with one tenderer for the delivery of various stage technical equipment. Equipment included in the agreement can be suspension pipes for technical equipment, pipe-grid, assembly rails, truss, cable drum system, cable guide system, module based stage system and textiles and carpet rails. DNS will mainly install the equipment itself, but some assembly work will be included in the contract.
- Cowi ASOslo
Framework agreement and maintenance contract operational control water and sewage, Sirdal municipality
Sirdal municipality intends to enter into a framework agreement and maintenance agreement with one and the same tenderer for operational control water and sewage. The contracts include: • upgrading existing operational control for water and sewage (first call-off on the framework agreement) • framework agreement for automation systems for water and sewage systems • service and maintenance agreement for the delivered operational control and automation systems. The agreements will be valid for 4 years, with an option for an extension for 2+2 years. Maximum 8 years. The framework agreement has an estimated value of NOK 11.5 million. The maximum value of the framework agreement is NOK 13.0 million.
- Sel kommuneENGERDALFrist: 01. Juni
SE-26-01 Engineering design services surface water for flood protection
Stor-Elvdal municipality intends to enter into a contract for detailed engineering design services for surface water measures in the centre of Otta. As NVE ́s main contract for flood protection has anticipated start-up 2028/29, the engineering design services shall facilitate for the municipal surface water pipelines to be completed and put into operation before the flood protection system is in place, where such a solution is appropriate. The strategy means that the pipeline network is to be built with temporary outlets to the river, but is prepared for future connection in NVE ́s pump stations. It must be seen with close interaction with NVE and their consultants in order to have engineered systems that are feasible in relation to future flood protection. Tenderers shall use their expertise and competence to contribute to fulfilling the aim of the contract.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 31. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Gjøvikregionen - Anskaffelser.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.