9205 Operational contract veg Telemark vest 2026-2031
The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads, national foot and cycle paths, county roads and county foot/cycle paths with accompanying side facilities, side areas, equipment and installations, in Bykle, Kviteseid, Nissedal...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads, national foot and cycle paths, county roads and county foot/cycle paths with accompanying side facilities, side areas, equipment and installations, in Bykle, Kviteseid, Nissedal, Tokke, Ullensva...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Statens vegvesen
- Veröffentlicht: 20. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads, national foot and cycle paths, county roads and county foot/cycle paths with accompanying side facilities, side areas, equipment and installations, in Bykle, Kviteseid, Nissedal, Tokke, Ullensvang, Fyresdal, Nome, Drangedal and Vinje municipalities in accordance with the road list given in the chapter. D2-V1 and D2-S20.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
7- Statens vegvesenMossFrist: 26. März
Operation and maintenance contract - Electrical installations for roads and paths in Møre og Romsdal 2026-2031
The assignment includes operational and maintenance assignments related to electrical installations, with functional responsibility for some of the assignments on national roads and county foot/cycle paths as well as some county roads, with the accompanying side facilities, side areas, equipment and installations in Møre og Romsdal county in accordance with for list of objects given in chapter 1. D2-V and D2-S20. The geographical area included in the contract is shown in chapter D2-S01.
- Akershus fylkeskommuneOslo
Operational contract road 3205 Romerike mid 2026-2031
The assignment includes operational and maintenance assignments, with function responsibility for some of the assignments, on county roads and county foot/cycle paths with the accompanying side facilities, side areas, equipment and installations in Gjerdrum, Lillestrøm, Lørenskog, Nannestad, Nes, Nittedal, Rælingen and Ullensaker municipalities.
- FINNMARK FYLKESKOMMUNEVADSØFrist: 17. März
DK 5605 Havøysund 2026-2031
The assignment includes operational and maintenance assignments, with function responsibility for the assignments, on county roads with the accompanying side facilities, side areas, equipment and installations in Porsanger and Måsøy municipalities.
- Trondheim kommuneTRONDHEIMFrist: 20. Apr.
Winter operations contracts VEG
Trondheim municipality c/o Trondheim city operations, hereafter called the contracting authority, invites tenderers to an open tender contest for contracts for winter operation on municipal roads and roads in Trondheim municipality. The procurement is for contracts for winter maintenance on municipal roads, pavements, foot and cycle paths, parking areas and other areas in accordance with the municipality ́s zone map. The contracting authority has divided the procurement into 11 sub-contracts (zo
- Statens vegvesenMossFrist: 22. Mai
National road 426 Eigerøy bridge
The main aim of the project is to replace the current Eigerøy bridge with a new bridge which shall be constructed parallel to the south side of the existing one. When the new bridge is finished, shall the old one be demolished. In addition a foot and cycle path shall be established south along the Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure comprehensive improvement of the infrastructure. New Eigerøy Bridge * The new Eigerøy bridge shall be constructed on the south side of the existing bridge. When the new the bridge has been completed, the old bridge shall be demolished. The new bridge is planned as a type of "Concrete slab bridge with blasted columns" with a length of approx. 272 m. * The bridge should typically have a total width of 13.6 m. * The sailing rectangle shall be (HxB) 22.5 m in 23.5 m. Other constructions * New culvert Lauåsen internal dimension (BxH) 3.5 m x 3.1 m * Support construction along Hovlandsvegen * Retaining wall and support construction at Hovlandsvegen 7 and 9 * Retaining wall along Old Eigerøyveien. * Other minor walls and support structures uncovered by the engineering design. need for. A new foot and cycle path shall be constructed as the main solution for walking and cycling. Some parts of the stretch will have pavements. * A new three-armed roundabout shall be constructed at Eigerøy. * The public transport stops along the stretch shall be upgraded to universal design and be equipped with shelters for better comfort and accessibility. * A new national road 426 shall be constructed on the east side of the new bridge, approx. 200 m eastwards. * Approx. 230 m new exit and local road from Langholmveien shall be constructed. Along Hovlandsveien * Along Hovlandsveien, National Road 426, a new foot and cycle path shall be constructed on the east side from the junction with Nyåskaiveien to the new Eigerøy bridge. This road shall connect on foot and cycle paths on the new bridge. The foot and cycle path is approx. 750 m long. The width of the new foot and cycle path varies between 2.5 and 3.0 m plus the shoulder and railing room. * The farthest south continues the current foot and cycle path on the west side of Hovlandsveien up to the existing pedestrian crossing at the public transport stops. See the tender documentation for detailed information on the contract work.
- Vest-TelemarkrådetKVITESEID
Welfare technology in Vest-Telemark (Seljord, Kviteseid, Tokke, Fyresdal, Nissedal and Vinje), framework agreement
The competition is for a framework agreement for the delivery of welfare technology. Patient signalling systems can also be procured on the contract. There is a need for equipment to be purchased or hired. Participants in the procurement: Seljord, Kviteseid, Nissedal, Tokke, Vinje and Fyresdal municipalities. The procurement ́s value is estimated to: NOK 2,500,000 excluding VAT per annum. The maximum value for the entire contract period, including any options and expected price rise: NOK 15,000,000 excluding VAT. The need is uncertain. The volume can vary both up and down and the contract period will depend on, among other things, the contracting authority ́s needs, activities, budgetary situations and other framework factors. Apprentices: The contracting authority has assessed the procurement against the apprenticeship regulations, cf. the Procurement Act § 7 and concluded that apprentices are not required in this procurement as the procurement is an procurement, cf. the apprentice regulation § 4. See the procurement documents for further information.
- Statens vegvesenMoss
National road 52 Tuv-Venås and Storeskar - Galdane
National road 52 is the mountain pass between Østlandet and Western Norway with the highest share of heavy transport. The aim of all the measures on National Road 52 is to improve accessibility, traffic safety and operational conditions, especially in winter. Tuv-Venås: On the stretch between Tuv and Venås, the current road has a steep climb of 8.2-9.1 % in Støytebakken. This means that heavy vehicles get stuck in winter, which in turn causes blocking back, reduced accessibility and traffic hazardous situations. The current chain site is undersized and not built in accordance with the current requirements. There are no offers on the stretch for soft road users. Riksvegen shall therefore be improved to an H1 road, with a special focus on better vertical curvature, a parallel foot and cycle path shall be established and the chain place shall be moved and built according to requirements in the current hand books. The speed limit is set at 60 km/h up to Venås bridge. Walls and access screens shall be constructed. New sub-drains shall be established through national road 52, and old sub-drains shall be removed. Today Storeskar bridge has registered damage, and is after the new Skjøiten bridge was built, the weakest point on national road 52. The bridge ́s adjoining road currently has a crease S-curve that does not meet the current normal requirements. New Storeskar bridge is included in the contract work and adjoining road geometry shall be improved to H1 standard. The speed limit is set at 80 km/h. The Norwegian Public Roads Administration has, as a part of its engineering design, carried out a detailed engineering design services for the bridge and has carried out technical approval of this. Detailed engineering design services and technical certification will be made available for the contractor in chapter F and it can be used by the tenderer. If such use, the tenderer makes the material theirs and will be responsible for any further use of this. There are high rock cuttings in the project that shall be blasted, and securing rock shall be Performed. Blasting works have previously been carried out in the rock cuttings, and the remaining undetoned explosives must be expected. Gamle Storeskar bridge is demolished and removed after the new Storeskar bridge is trafficked.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Statens vegvesen.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.