ZAL (Hamburg): Test bench consisting of a climate and altitude chamber to operate hydrogen powered fuel cell systems at the Hanseatic Hydrogen Center for Aviation and Maritime (H2AM)
The following requirements apply to the test bench needed to operate hydrogen-powered fuel cell systems at ZAL: -The size of the expected test objects will be minimum 4 m x 1 m x 1.5 m (L x W x H). The test bench shall therefore consist of a climate and altitude chamber, the necessary aggregates to operate the fuel cel...
Angebotsfrist:29. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The following requirements apply to the test bench needed to operate hydrogen-powered fuel cell systems at ZAL: -The size of the expected test objects will be minimum 4 m x 1 m x 1.5 m (L x W x H). The test bench shall therefore consist of a climate and altitude chamber, the necessary aggregates to operate the fuel cell system and a re...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: ZAL Zentrum für Angewandte Luftfahrtforschung GmbH
- Veröffentlicht: 23. April 2026
- Frist: 29. Mai 2026
Ausschreibungsbeschreibung
The following requirements apply to the test bench needed to operate hydrogen-powered fuel cell systems at ZAL: -The size of the expected test objects will be minimum 4 m x 1 m x 1.5 m (L x W x H). The test bench shall therefore consist of a climate and altitude chamber, the necessary aggregates to operate the fuel cell system and a ready-to-use operators user interface. -The climate and altitude chamber shall be able to simulate temperature, pressure and humidity according to International Standard Atmosphere (ISA) with a rate of change equivalent to 2.800 ft/min. -Aggregates to operate the fuel cell system shall include but are not limited to a balance of plant power supply, an electric load, a hydrogen supply system, a cooling system and an air system for the supply of the fuel cell systems cathode path. -All operational parts shall be controlled via a ready-to-use semi-automated central control system which allows the customer to run scripted test procedures as well as to use single operating points. -All legal and regulatory requirements for an operation in Europe, Germany and the city of Hamburg must be applied. -ZAL already operates supply infrastructures for hydrogen, process air, power supply etc., which will be extended to supply the test bench. The extension of the supply infrastructure is not part of this tender. Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
2- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
10004174 - Engineering support for the development of up to three PtL pilot plants in up to three countries
The International Power-to-X Hub supports the transition to climate-neutral industries and economies by advancing sustainable Power-to-X solutions in sectors where direct electrification is not yet feasible, especially aviation, maritime transport and energy-intensive industries. The project is implemented by Deutsche Gesellschaft fuer Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for the Environment, Climate Action, Nature Conservation and Nuclear Safety (BMUKN). It is financed through the International Climate Initiative as part of Germany"s hydrogen and Power-to-X policy framework. Power-to-X enables the production of fuels and chemical feedstocks from renewable electricity and sustainable carbon or nitrogen sources and therefore helps replace fossil-based inputs while supporting climate protection, industrial transformation and sustainable economic development. The subject of this tender is providing technical support for the development of up to three Power-to-Liquid pilot plants in up to three countries. The assignment provides up to three industrial partner companies with customised engineering documents and advisory services to advance PtL pilot plant projects to FEED/EPC tendering stage. The requested services cover the full project development pathway from concept definition and selection through comparative techno-economic feasibility assessment and conceptual engineering to advice on procurement and tender strategy and, where required, support for the preparation of functional FEED/EPC tender documents. The contract is structured into four work packages in two implementation steps. In Work Packages A and B, the contractor shall review existing concepts and documentation, consult each partner, refine or propose PtL plant concepts, advise on feedstock and utility sourcing, process technologies, offtake markets, regulation and certification, conduct kick-off meetings and site visits, and prepare Concept and Site Analysis Reports with comparative assessments and recommendations. The contractor shall also deliver partner trainings and prepare comparative techno-economic feasibility studies for up to two plant concepts per partner, including a book of assumptions, process simulation, technical descriptions, preliminary process flow diagrams, equipment sizing, interface definitions, certification compliance assessment, CAPEX and OPEX estimates, economic modelling, risk analysis and concept recommendations. Preliminary results shall be discussed with each partner in an interactive workshop to validate assumptions, review trade-offs and support concept selection. Subject to confirmation by the partner and GIZ, Work Package C covers FEL-2 conceptual engineering for the selected concept and a refined Class 4 AACE cost estimate. This includes advisory support on site development, permitting and certification, preparation of an integrated project execution plan, partner trainings on PtL process simulation and plant engineering, and an FEL-2 engineering package comprising Basis of Design specifications, process descriptions, drawings, equipment lists, preliminary equipment specifications, interface and battery limit definitions, input and output specifications, and QA/QC and HSE requirements. The engineering work shall be carried out in close coordination with the partner and GIZ and shall include advice on technology and licensor options as well as updated CAPEX estimates, economic models and key project indicators. Where sustainable CO2 supply is not readily available, the services may also include, for one project, the screening of potential sustainable carbon sources and the design of a CCU system including FEL-1 engineering package and CAPEX assessment. In a subsequent stage, the contractor shall advise on FEED/EPC procurement and tender strategy and, where required, prepare the functional tender specifications, including design basis, technical and performance specifications, scope of supply and services, site and utility information, HSE and QA/QC requirements and project schedule elements in line with the partner"s procurement framework and international standards. The contractor shall also provide advice on commercial and legal terms during tender preparation. For one partner, the services may further include support during the FEED/EPC tendering process, including bidder communication, clarification support, qualification and bid evaluation assistance, preparation of evaluation notes and support during negotiations. Throughout implementation, the contractor shall also provide cross-cutting knowledge exchange, monitoring, reporting, backstopping and coordination services.
- Gas Networks IrelandCorkFrist: 09. Apr.
25/064 - Qualification System for for the provision of Polyethylene (PE) Pipe, Fittings and Valves
The objective of this QSQ is to qualify Applicants onto the Qualifications System for the manufacturing and supply of Polyethylene (PE) Pipe, Fittings and Valves for Gas Networks Ireland. The proposed supply requirements are to be divided into four (4) separate lots as detailed below: • Lot 1 (PE Pipe 90mm - 400mm) – Manufacture and supply of PE pipe for gas. • Lot 2 (PE Pipe 20mm - 63mm) – Manufacture and supply of PE pipe for gas. • Lot 3 (PE Fittings) Manufacture and/or supply of PE Fittings for gas. These include but are not limited to PE; caps, couplings, elbows, equal tees, flange adaptors, reducers, tee branch saddles, tees, tapping tees, G clamp adaptors, multi tap tees, branch saddles, bends, unequal tees and end caps. • Lot 4 (PE ball valves) – Manufacture and/or supply of PE Valves for gas. These include but not limited to valves ranging in size from small diameter 20mm to larger diameters up to 315 mm. Please note: Lots 1 and 2 relate to manufacture and supply requirements. Lots 3 and 4 relate to manufacture and/or supply requirements. The requirements for the manufacture and/or supply of pipes, fittings and valves under this Qualification System will include arrangements for delivery to various stipulated depot destinations on the island of Ireland and the ability to operate a national distribution network. Applicants should note that from time to time over the term of the Qualification System, the Contracting Entity, at its sole discretion but without altering the overall nature of the Qualification System, may modify the Qualification System to reflect changes in its requirements. Such modifications may include changes to the pipe diameter and pressure rating which may result in an increase to the pipe size, wall thickness and pipe properties or specification and the provision of services or additional supplies associated with such changes. The Contracting Entity will also seek similar changes to pipe fittings and valves. The conditions under which such an option may be exercised by the Contracting Entity will be outlined in the relevant call off competition document. The Contracting Entity also reserves the right to add additional lots to the Qualification System. Applicants may apply for qualification in one or more lots. At the discretion of the Contracting Entity a full site visit and audit of the prospective Qualified applicants supply chain manufacturing facility(s) will be carried out to validate and support their pre-qualification submission. In the event of a site visit and audit being carried out to pre-qualify the Supplier must successfully pass this site inspection audit. It is envisaged that the scope of products and services of the initial Call for Competition to be drawn-down under the Qualification System will be, but not limited to; PE pipes, fittings and valves and will cover the following: 1. Standards: • Gas - as per I.S. EN 1555 or equivalent. 2. Indicative Diameter Range: • PE pipe, fittings and valves ranging in size from small diameter 20mm to large diameter 400 mm pipe and fittings. 3. Indicative Pipe Specification/Types: • Solid wall pipe; • Coextruded pipe; • Peelable pipe; and 4. Indicative Pressure Range and Pipe Materials : Pipe Material/Description Pressure Range (Barg) PE 100 (SDR 11) 7 PE 80 (SDR 11) 4 PE 100 (SDR 17) 4 PE 80 (SDR 17) 2 5. Colour • PE80: solid wall PE pipe in yellow colour • PE80: c-extruded wall PE pipe with outer layer in yellow colour • PE100: solid wall PE pipe in orange colour (sizes 180mm and above) • PE100: PE 100 PE pipe with peelable outer layer in yellow colour (with stripes) • Pipes for proof-of-concept hydrogen projects shall be yellow with blue axial stripes.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 29. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist ZAL Zentrum für Angewandte Luftfahrtforschung GmbH.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.