Tunnel maintenance south-west; The Bergen Railway and the Sørland Railway with side railways
The work is mainly tunnel maintenance and tunnel safety, with work including stabilisation measures and water and frost protection for the railway tunnel, including in-depth areas.
Angebotsfrist:30. April 2026
Typ:Ausschreibung