TII485 Luas Cork Topographical Survey
This Ground 1/200 Topographic Survey & Precise Survey Control Establishment is required for the LRT Project “Luas Cork” and its Emerging Preferred Route(s) for an indicative 18km. Following the establishment, completion and agreement of the precise survey control network for the whole project, subsequent individual top...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
This Ground 1/200 Topographic Survey & Precise Survey Control Establishment is required for the LRT Project “Luas Cork” and its Emerging Preferred Route(s) for an indicative 18km. Following the establishment, completion and agreement of the precise survey control network for the whole project, subsequent individual topographical zones ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Transport Infrastructure Ireland (TII)
- Veröffentlicht: 29. April 2026
- Frist: Nicht angegeben
Ausschreibungsbeschreibung
This Ground 1/200 Topographic Survey & Precise Survey Control Establishment is required for the LRT Project “Luas Cork” and its Emerging Preferred Route(s) for an indicative 18km. Following the establishment, completion and agreement of the precise survey control network for the whole project, subsequent individual topographical zones have been identified for surveying. These may be required in an order for phased delivery as stipulated by the Luas Cork Design Team. This was issued under the NTA’s Framework Agreement for the provision of Topographical Surveying Services for Transport Projects funded by the National Transport Authority.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Limerick City and County Council_103432Limerick.Frist: 04. Juni
Limerick City and County Council Topographical Survey Works
Limerick City and County Council (LCCC) requires the completion of a number of topographical surveys annually, primarily to support road realignment and junction improvement works. To expedite the procurement process LCCC are inviting applicants to tender rates for the provision of these survey requirements. The surveys will typically be required for projects including road pavement and realignment works, junction improvements, installation of vehicle restraint systems (VRS), implementation of traffic calming measures, and structural topographical surveys. The sites will be located throughout Limerick City and County, on National, Regional and local roads.
- Cork Education and Training BoardCorkFrist: 03. Apr.
Single Party Framework Agreement relating to The Supply, Delivery and Commissioning of Life Sciences Equipment for the Cork Education and Training Board
The Cork Education and Training Board proposes to engage in a competitive process for the establishment of a single party framework agreement for The Supply, Delivery and Commissioning of Life Sciences Equipment. Delivery is initially to the CCFET Life Sciences Centre, Carrigaline, Cork as required. The specifications identified within the tender are for one (1) Filter Integrity Test Instrument, one (1) Ready to Process Wave Bioreactor and two (2) Tangential Flow Filtration (TFF) System, intende
- Port of Cork CompanyRingaskiddy County CorkFrist: 29. Mai
Single Party Framework Agreement for the Provision of Legal Services in Relation to Ringaskiddy Projects
The Port of Cork Company (PoCC) wishes to establish a Single Party Framework Agreement for the Provision of Legal Services in relation to Ringaskiddy Projects. PoCC will require third party funding and a construction works contractor(s), it is anticipated that the services required will include (but are not limited to) the following: Banking and Finance, Commercial Contracts, Competition and Joint Ventures, Construction Law, Capital Markets and Public Procurement The successful tenderer will work closely with the Port of Cork’s financial advisor and Law Agent in relation to the legal issues arising out of an assessment of preferred financial and funding options. In addition, the preferred supplier will advise on all aspects of the proposed construction works procurement framework(s) that will be used. Other advices may be required depending on consenting decisions of An Coimisiún Pleanála, Cork County Council, the Maritime Area Regulatory Authority and the Environmental Protection Agency. This RFT applies to the provision of legal services in relation to Ringaskiddy projects only.
- IDA IrelandDublin
Project Management Led (PM) Multi Disciplinary Team for MMP Raheen
IDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures required in Raheen Industrial Estate and its wider infrastructure network to tackle existing and future constraints in transport capacity to plan for future levels of development to facilitate projected growth in population and employment and to cater for and encourage sustainable mobility. Following on from this study, IDA Strategic Property Team is now seeking to appoint a Project Management Led Integrated Team to undertake and provide a site wide Mobility Management Plan. The Project Management led Design Team will manage and provide all relevant consultancy services with respect to the study, analysis of findings and future recommendations in relation to the Mobility Management Plan. In line with IDAs current strategy Adapt Intelligently A Strategy for Sustainable Growth and Innovation 2025-29, delivery of this project aims to assist in reducing IDA Ireland client carbon emissions. The study shall be informed by the emerging Transport Strategy for the Park which outlines multi modal short, medium and longterm solutions to enable sustainable growth. The appointed Consultant should consist of suitably qualified and experienced resources which can cover strategic planning, stakeholder engagement, behavioural change, and technical delivery. Key personnel should include, Project Director Manager, Transport Planner, Mobility Management Specialist, Stakeholder Engagement Lead, Data Analyst GIS Specialist and any specialist advisors required for the successful delivery of the project.
- KRISTIANSAND KOMMUNESØGNEFrist: 29. Mai
Framework agreement - Booked assignments Bus services (sub-contracts)
Sub-contract 1 includes the contracting authorities Kristiansand municipality, Kristiansand Havn IKS and Kilden Teater and Konserthus IKS. The contracting authorities need to enter into a framework agreement for booked assignments for bus transport. The services concern transport assignments by bus and/or minibus, which are not covered by other public transport agreements. Statistics from the current agreement show that most of the assignment from Kristiansand municipality will be transport of school classes to and from swimming pools. These assignments are within the municipal borders for the relevant contracting authority. Occasional assignments can also be included, e.g. tour assignments, transport of school classes to and from camp stays, transport of different delegations to short and longer assignments, as well as other transport assignments that naturally come under the performance description. Kristiansand Havn IKS needs bus transport by cruise call at other terminals than The Port of Kristiansand, as well as other tailor made assignments for their employees and guests. Other more sporadic assignments may also occur. Kilden Teater og Konserthus [Kilden Teater og Konserthus] needs transport of approx. 80 musicians with instruments for tours 3-4 times a year, mainly domestic, but also occasional abroad. In addition there can be transport of school classes to concerts and rehearsals at Kilden, as well as bussing musicians to schools in connection with DKS projects and outreach activities. Mini buses for smaller ensembles for chamber concerts and projects in the Agder region may also be relevant. Measures: ML1.4.1 Contribute to the fact that a new agreement for public transport shall be ensured as much as possible emission-free vehicles. This sub-contract will be covered by Kristiansand municipality's environmental ambition and emphasised as a part of the award criteria. See the annexes for further information on the needs. See annex 05 - Requirement Specifications for further information on the service requirements.
- Cork City CouncilCorkFrist: 29. Mai
Competitive dialogue for Cork Events Centre
The CEC is envisaged as a high-quality, multifunctional civic venue that is actively used, valued by local communities, and supportive of local employment. It is intended to make a sustained and positive contribution to the cultural, social, and economic life of Cork City and the wider southern region, enhancing the experience of residents and visitors alike. The development of a venue of this scale has been an objective of the Contracting Authority since the 1990s and reflects long-standing strategic planning policy at national and regional levels. The CEC will be marketed at regional, national, and international levels and should demonstrate a standard of quality comparable with leading event and convention facilities elsewhere. The design and specification should be capable of attracting high-profile events, conferences, and performers, ensuring the centre’s competitiveness within the wider market. Flexibility will be a core design principle, with facilities required to be robust, durable, and suitable for intensive public use. Whole-life performance and operational efficiency will be central considerations, including energy use, maintenance, cleaning, and servicing.
- Dublin City CouncilDublin
DCC Single Party Framework Agreement for the Control of Weeds on Roads in Dublin City Council 2026-2029
Dublin City Council proposes to award a Single Party Framework Agreement for four years, for the provision of weed control service. The successful tenderer must treat visible growth as specified within the Framework. Dublin City Council are seeking tenders for alternative methods for the control of weeds other than the use of glyphosate on hard surfaces. ie footways (where Glyphosate is referred to in these tender documents this implies glyphosate in use as a herbicides or pesticides) Dublin City Council wishes to establish a Single-Party Framework agreement for the provision of a service for the control of weeds on footways, medians and other areas taken in charge by Dublin City Council for four years. An initial contract will be awarded for one year, subject to demand and availability and this may be extended at the sole discretion of Dublin City Council for a period of 3 years. . Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID xxxxxxx – Input when notice created.
- Sarpsborg kommuneSarpsborg
(26/8) Taxi services, framework agreement
The competition is for a framework agreement for the delivery of taxi services for passenger transport that are not carried out by itself. The contracting authority also has an option for transporting infections. The framework agreement does not apply for school transport managed by the county, patient journeys managed by the health authorities, buses over 16 seats and facilitated transport under the auspices of the county. The procurement ́s value is estimated to: NOK 6,500,000 excluding VAT per annum. The maximum value for the entire contract period, including any options and expected price rise: NOK 50,000,000 excluding VAT. The need is uncertain. The volume can vary both up and down and the contract period will depend on, among other things, the contracting authority ́s needs, activities, budgetary situations and other framework factors. See the procurement documents for further information. Apprentices: The contracting authority has assessed the procurement against the apprentice regulations, cf. the Procurement Act § 7 and concluded that apprentices are not required in this procurement, as there is not much need for apprenticeships for the courses that are relevant for this procurement, cf. the apprentice regulations § 6 (2), and the contract ́s main element does not include work where it is relevant to use labour with trade or craft certificates. Cf. the apprentice regulations § 6 (3).
- IDA IrelandDublin
Project Management Led Multi-Disciplinary Team for Construction Consultancy Services
The IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby M20 Motorway and has two main access routes which include the predominant access from the Ballycummin Road off the M20 while the R526 road provides secondary access to its northwestern entrance. In recent years with the continued growth and development of the IDA Raheen Business Park, issues with traffic and congestion have become more pronounced and it is a significant concern for many of the tenants in the park. The daily staff volumes and freight movements are significant, leading to pressures on transport infrastructure and parking facilities as continually highlighted by current tenants. The Raheen area faces challenges related to car dependency, limited public transport options, and growing traffic congestion and those effects are felt within the IDA Park. In May 2024, a Transport Strategy for the park was commenced. The aim of the Transport Strategy was to provide IDA with a robust, evidence-based framework for advancing sustainable transport solutions that support both IDA objectives and the growth ambitions of tenant companies. From consultation with tenants, the Local Authority and stakeholders, combined with the findings of the ABTA, and to allow for continued expansion of the Park a Mobility Management Plan Framework is now being established and its implementation will be coordinated on the Park over the next 5 years. In addition to the MPPF, the Transport Strategy (informed by the ABTA) provided several preferred options which included a long list of infrastructural interventions which could be broken down into 3 categories. 1. Active Travel Options 2. Public Transport Options 3. Access and Capacity Option This Call for Tenders concerns 4 separate key priority items from the Access and Capacity Options recommendations to be delivered; they include the following: 1. Part Time Signalisation of Roches Avenue Roundabout in the PM Peak 2. Bypass Lane on Southern Arm of Roches Avenue Roundabout 3. Provision of Pedestrian Crossing and Lighting at Roches Avenue Roundabout 4. Provision of 2 x Pedestrian Crossing and Junction Upgrade at National Learning Centre. IDA Strategic Property Department is now seeking to appoint a Project Management Led Integrated Multi-Disciplinary Team to deliver all of the above and services outlined in this document. The Project Management led Multi-Disciplinary Team will manage and provide all relevant consultancy services with respect to the design and delivery of the project at IDA Raheen Business Park, Co. Limerick. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil Engineer, QS, Transport Engineer, M and E Engineer, Health and Safety Consultant, Assigned Certifier, PSDP and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include (1) Preliminary Stage (2) Detailed Design and Planning Stage (3) Tender, Evaluation and Award (4) Construction and (5) Handover.
- Donegal Local Development Company LtdBorderFrist: 30. März
Climate Change Capacity Building - Scoping Study
DLDC is seeking tenders from competent consultancy providers to carry out a scoping study with key stakeholders in Co.Donegal. The study will be restricted to community organisations located in the DLDC catchment area, which excludes Inishowen, Gaeltacht and Islands. The main purpose of the study is to identify the need for capacity building in local communities in the areas of environmental sustainability, climate action and climate change mitigation and adaptation. Key deliverables will include a detailed assessment of the current training provision available to community organisations in Donegal and to identify gaps in terms of climate related training provision. The consultant will be expected to carry out a combination of secondary desk-based research as well primary research including: • Online or telephone survey of a broad representation of community organisations to establish their current training needs and areas of training and capacity building interests. • Establishment of whether this training and capacity building is available locally, where provided and by whom etc. • In-person focus groups or interviews with a sampling of community organisations to identify needs focusing on building capacity for sustainability and climate action. The sampling should consist of a minimum of 20 community groups and should include but not be limited to Tidy Towns, Angling Associations, Men’s Sheds, Community Gardens, Environmental Groups and Social Enterprises. • The in-person focus groups and interviews should facilitate detailed recommendations to DLDC on training topics / modules that will be engaging and incorporate practical elements, preferred location, preferred duration and identification of any resources required to facilitate the key stakeholders drive positive change in the areas of climate, circular economy, sustainability, social inclusion and just transition and climate action at a local level are required. • Thought as to how community groups will be ab
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Transport Infrastructure Ireland (TII).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.