Sean O Heslins gaa club
The project proposes constructing a new 3G pitch and all ancillary services at Sean O Heslin's existing gaa club facility.
Angebotsfrist:14. April 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The project proposes constructing a new 3G pitch and all ancillary services at Sean O Heslin's existing gaa club facility.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: F Davitt Plan and Design Engs_2160
- Veröffentlicht: 10. März 2026
- Frist: 14. April 2026
- Thema: Sportanlagenbau
Ausschreibungsbeschreibung
The project proposes constructing a new 3G pitch and all ancillary services at Sean O Heslin's existing gaa club facility.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Ausschreibungen
10- Oldcastle Gaelic Football ClubOldcastleFrist: 16. Feb.
New Wire Mesh Fencing at Oldcastle GFC
Oldcastle Gaelic Football Club invites tenders for the removal of existing chain-link fencing and posts and the supply and installation of new wire mesh fencing, including all associated ancillary site works, at Millbrook Football Pitch, Crossdrum, Upper Oldcastle, Co. Meath
- Dun Laoghaire-Rathdown County CouncilDún LaoghaireFrist: 17. Feb.
DLR Co Co - Construction of Sports Campus at Ballyogan, Co. Dublin
The project comprises the construction of a new Sports Campus to include, but not limited to, a new 25 m swimming pool, learners pool, sports hall, gymnasium, all associated ancillary accommodation, carparking, playground, Skate Park, works to existing pitches and all other necessary siteworks and services. The building Floor Area is circa 5,100 m2.
- Ministry for Culture Lands and Local GovernmentVallettaFrist: 07. Apr.
Integrated Design Team service for the development of a new grass-based pitch for CLG Béal an Mhuirthead, Co. Mhaigh Eo
Integrated Design Team service for the design, contractor procurement, construction management and supervision, and certification for the development of a new grass based pitch at the club’s existing facility at Béal an Mhuirthead, Co. Mhaigh Eo. Eircode F26 A409o
- Department of ContractsFlorianaFrist: 24. Apr.
CT2032/2026 TENDER FOR THE PROJECT MANAGEMENT AND ANCILLARY SERVICES FOR THE REGENERATION OF AN EXISTING CAR PARK AND CREATION OF A NEW PUBLIC GARDEN IN BORMLA
TENDER FOR THE PROJECT MANAGEMENT AND ANCILLARY SERVICES FOR THE REGENERATION OF AN EXISTING CAR PARK AND CREATION OF A NEW PUBLIC GARDEN IN BORMLA
- Health Service Executive (HSE)KildareFrist: 30. Apr.
Reconfiguration of Hydrotherapy Pool at Midland Regional Hospital, Tullamore, Co. Offaly
The development consists of the Reconfiguration of the existing Hydrotherapy pool area in Midlands Regional Hospital Tullamore to create new consultation rooms and ancillary spaces. The existing hydrotherapy pool is to be filled in with the removal of all ancillary pool equipment and plumbing fixtures and for the fitout of the area to create 6 No. new consultation rooms and ancillary spaces at Midland Regional Hospital, Tullamore.
- Office of Public Works (OPW)TrimFrist: 30. Apr.
Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly
The project involves a new development at the Clonmacnoise Monastic Site to improve visitor facilities . The works include alterations to the existing buildings and the construction of a new extension. Also included are substantial landscape works, such as alterations to the coach parking area, the provision of a new entrance courtyard and other ancillary works.
- Health Service Executive (HSE)KildareFrist: 20. März
HSE EST MW - Pump Upgrade At Nenagh General Hospital
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivalent) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved.
- Health Service Executive (HSE)KildareFrist: 24. März
HSE EST MW -St Josephs Ennis Pump Upgrade
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivilant) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved
- Health Service Executive (HSE)KildareFrist: 20. März
HSE EST MW - Pump Upgrade At Nenagh General Hospital
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivalent) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved.
- Store Norske Spitsbergen Kulkompani ASLONGYEARBYENFrist: 30. März
Prequalification of generator suppliers
The prequalification for the generators is part of a larger state investment project for upgrading the energy system in Longyearbyen. In addition to generators wich will be incorporated in the new diesel based combined heat and power plant, the project includes a new tank facility, a new service building with offices, storage, workshop, and infrastructure for the entire energy system.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 14. April 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist F Davitt Plan and Design Engs_2160.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.