Purchase of powerbank
Mobile power bank for electric vehicles, machinery, and equipment at construction sites. Replaces current mobile fuel tank used for combustion engines. One unit to be procured now, with option for one additional identical unit. Supplier must provide price for option in tender.
Angebotsfrist:23. März 2026(abgelaufen)
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Mobile power bank for electric vehicles, machinery, and equipment at construction sites. Replaces current mobile fuel tank used for combustion engines. One unit to be procured now, with option for one additional identical unit. Supplier must provide price for option in tender.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Oslo kommune v/ Vann- og avløpsetaten
- Veröffentlicht: 18. Februar 2026
- Frist: 23. März 2026
Ausschreibungsbeschreibung
Mobile power bank for electric vehicles, machinery, and equipment at construction sites. Replaces current mobile fuel tank used for combustion engines. One unit to be procured now, with option for one additional identical unit. Supplier must provide price for option in tender.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Ausschreibungen
2- Westinghouse Electric Poland Sp.z.o.oKrakówFrist: 30. Apr.
Fabrication of Reactor Vessel Flow Skirt (RVFS) (Commodity Code MI01) for Poland AP1000® Project
1. Experienced manufacturers / Fabricators capable of fabricating and furnishing the AP1000® RVFS (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar components of around 3.4m outer diameter and 0.4m height; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a Westinghouse or NIAC audited nuclear quality program complying with 10CFR50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets, or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include the information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for unit one (1) of the three (3) unit project. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), shop lifting and handling plan (including lifting lug design, drawings, calculations, and testing), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site lifting, handling, and movement plans, including any special instructions or requirements for unloading, hauling, and storage. • Preparation of the necessary documentation to support site assembly. • Details of the joint configuration between the field welded steel components • Process qualification procedure and demonstration plans for critical processes including stud welding, automatic welding, long-seam butt welding, dimensional control, weld repairs, etc. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • Temporary attachments as required per the fabrication process selected. • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the prequalified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD . Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded. 13. The procedure for companies to gain access to proprietary information, if required, will be subject to compliance with the executed PIA /NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFP document. 14. If a large number of companies express interest and submit a completed AP1000 Supplier Questionnaire, the Contracting Authority reserves the right to conduct a preliminary down-selection of companies that demonstrate the highest qualification, capacity, and capability to perform the required scope of work. 15. The Contracting Authority also reserves the right to exclude any of the following from this Competitive Bidding process: A. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or B. economic operators who rely in the Competitive bidding process on capacities of any entities from countries not covered by the GPA with the EU. All such decisions by the Contracting Authority are final and shall not be subject to complaint or dispute. 16. The Customer shall be responsible for monitoring of the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
10004174 - Engineering support for the development of up to three PtL pilot plants in up to three countries
The International Power-to-X Hub supports the transition to climate-neutral industries and economies by advancing sustainable Power-to-X solutions in sectors where direct electrification is not yet feasible, especially aviation, maritime transport and energy-intensive industries. The project is implemented by Deutsche Gesellschaft fuer Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for the Environment, Climate Action, Nature Conservation and Nuclear Safety (BMUKN). It is financed through the International Climate Initiative as part of Germany"s hydrogen and Power-to-X policy framework. Power-to-X enables the production of fuels and chemical feedstocks from renewable electricity and sustainable carbon or nitrogen sources and therefore helps replace fossil-based inputs while supporting climate protection, industrial transformation and sustainable economic development. The subject of this tender is providing technical support for the development of up to three Power-to-Liquid pilot plants in up to three countries. The assignment provides up to three industrial partner companies with customised engineering documents and advisory services to advance PtL pilot plant projects to FEED/EPC tendering stage. The requested services cover the full project development pathway from concept definition and selection through comparative techno-economic feasibility assessment and conceptual engineering to advice on procurement and tender strategy and, where required, support for the preparation of functional FEED/EPC tender documents. The contract is structured into four work packages in two implementation steps. In Work Packages A and B, the contractor shall review existing concepts and documentation, consult each partner, refine or propose PtL plant concepts, advise on feedstock and utility sourcing, process technologies, offtake markets, regulation and certification, conduct kick-off meetings and site visits, and prepare Concept and Site Analysis Reports with comparative assessments and recommendations. The contractor shall also deliver partner trainings and prepare comparative techno-economic feasibility studies for up to two plant concepts per partner, including a book of assumptions, process simulation, technical descriptions, preliminary process flow diagrams, equipment sizing, interface definitions, certification compliance assessment, CAPEX and OPEX estimates, economic modelling, risk analysis and concept recommendations. Preliminary results shall be discussed with each partner in an interactive workshop to validate assumptions, review trade-offs and support concept selection. Subject to confirmation by the partner and GIZ, Work Package C covers FEL-2 conceptual engineering for the selected concept and a refined Class 4 AACE cost estimate. This includes advisory support on site development, permitting and certification, preparation of an integrated project execution plan, partner trainings on PtL process simulation and plant engineering, and an FEL-2 engineering package comprising Basis of Design specifications, process descriptions, drawings, equipment lists, preliminary equipment specifications, interface and battery limit definitions, input and output specifications, and QA/QC and HSE requirements. The engineering work shall be carried out in close coordination with the partner and GIZ and shall include advice on technology and licensor options as well as updated CAPEX estimates, economic models and key project indicators. Where sustainable CO2 supply is not readily available, the services may also include, for one project, the screening of potential sustainable carbon sources and the design of a CCU system including FEL-1 engineering package and CAPEX assessment. In a subsequent stage, the contractor shall advise on FEED/EPC procurement and tender strategy and, where required, prepare the functional tender specifications, including design basis, technical and performance specifications, scope of supply and services, site and utility information, HSE and QA/QC requirements and project schedule elements in line with the partner"s procurement framework and international standards. The contractor shall also provide advice on commercial and legal terms during tender preparation. For one partner, the services may further include support during the FEED/EPC tendering process, including bidder communication, clarification support, qualification and bid evaluation assistance, preparation of evaluation notes and support during negotiations. Throughout implementation, the contractor shall also provide cross-cutting knowledge exchange, monitoring, reporting, backstopping and coordination services.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 23. März 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Oslo kommune v/ Vann- og avløpsetaten.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.