NL-Petten: Integrated Petten entrance (IPE), exterior security measures
JRC Petten is currently realizing a construction project for the complete renovation of the entrance to the site called IPE (integrated Petten entrance). The project consists of two sub-projects, the <building project> which is currently under construction , and the <exterior security measures> project which is the sub...
Angebotsfrist:13. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
JRC Petten is currently realizing a construction project for the complete renovation of the entrance to the site called IPE (integrated Petten entrance). The project consists of two sub-projects, the <building project> which is currently under construction , and the <exterior security measures> project which is the subject of this requ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Veröffentlicht: 22. April 2026
- Frist: 13. Mai 2026
Ausschreibungsbeschreibung
JRC Petten is currently realizing a construction project for the complete renovation of the entrance to the site called IPE (integrated Petten entrance). The project consists of two sub-projects, the <building project> which is currently under construction , and the <exterior security measures> project which is the subject of this request (named : IPE exterior security measures) The <IPE exterior security measures> project includes : • Installation of 2x4 automatic retractable bollards to protect the facilities from high-speed hostile vehicles • Installation of eight light-duty barriers to control vehicle access and security checks; • Installation of 4 speed gates (night gates) to prevent unauthorized individuals or protesters from entering the site. • Installation of the fixed fences around the new security and entrance building and between the security gates • Installation of license plate camera, speeding camera, traffic signing speed/parking/traffic rules), detection loops, anti-collision flowerpots and two flag poles • Integration of the exterior security measures to the controls of the security control room and the guard house
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 04. Mai
NL-Petten: Integrated Petten entrance (IPE), exterior security measures
Das JRC Petten realisiert das Projekt 'IPE exterior security measures'. Umfang: Installation von 2x4 automatischen Pollern, acht Schranken, vier Speed-Gates (Nachtzugänge) und festen Zäunen um das neue Sicherheitsgebäude. Zudem umfasst der Auftrag die Montage von Kennzeichen- und Geschwindigkeitskameras, Verkehrsschildern, Induktionsschleifen, Anfahrschutz-Pflanzkübeln und zwei Fahnenmasten sowie die Integration der Sicherheitstechnik in die Kontrollzentrale und das Wachgebäude.
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Mai
NL-Petten: Engineering-, design- and consultancy services, including provision of support and performance of studies during various phases of construction and/or refurbishment projects.
The JRC Petten is aiming to conclude a contract for engineering and consultancy services. It concerns the development of designs and studies for the procurement and future implementation of various construction and/or renovation projects of buildings and facilities of varying size and complexity. It also includes consultancy services on various matters related to different topics such as installation maintenance, environmental and energy aspects, licensing, project development, and so on. Furthermore, it entails supervision of the construction phase of technical works executed by contractors on the Petten site.
- Drammen Eiendom KFDrammenFrist: 03. März
Contract future energy measures
Drammen Eiendom KF shall carry out an energy analysis and prepare a portfolio overall prioritising of energy measures for the buildings, which amounts to approx. 650,000 m². The aim is to identify which measures will give the greatest reduction in energy use per invested penny, and to ensure a general decision basis for prioritising future investments.
- Office of Public Works (OPW)Trim
Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly
The project involves a new development at the Clonmacnoise Monastic Site to improve visitor facilities . The works include alterations to the existing buildings and the construction of a new extension. Also included are substantial landscape works, such as alterations to the coach parking area, the provision of a new entrance courtyard and other ancillary works.
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Mai
NL-Petten: The supply and installation of air handling units, replacing the existing ones in buildings 308 and 309.
The European Commission's Joint Research Centre (JRC) in Petten intends to replace the existing Air Handling Units (AHUs) and associated HVAC infrastructure located in buildings 308 and 309. The current ventilation systems are obsolete and have reached the end of their operational lifespan. Furthermore, preliminary technical assessments have indicated that the existing air renewal capacity is insufficient to maintain optimal indoor air quality for the occupants. To ensure a healthy, safe, and productive working environment, this procurement aims to upgrade the facilities. The primary objective is to improve indoor air quality, while simultaneously improving the overall energy efficiency of the buildings. The scope of this contract encompasses the supply, installation, and comprehensive commissioning of the new air handling systems and related infrastructure to provide a fully functional delivery. This includes the safe removal and disposal of the existing AHUs, roof support frames, humidification systems, and redundant cabling or piping, ensuring continuous operation of the buildings during the transition. The technical project involves replacing the units with new, highly energy-efficient equipment featuring heat recovery systems. Additionally, the contract covers the complete adaptation of the hydraulic system to operate under a new, lower-temperature regime, the installation of humidification systems, installing structural supports on the roofs, and the execution of all necessary electrical works. Finally, it requires the full integration of the new instrumentation and controls with the existing Siemens Building Management System (BMS), alongside essential auxiliary tasks such as ductwork cleaning.
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 13. Mai
Provision of Occupational Health, Safety and Enviornmental expertise to JRC Petten
The Joint Research Centre (JRC) Petten plans to award a Framework Service Contract for the provision of Occupational Health and Safety (OHS) and Environmental Management expertise. The experts will support both the Quality, Safety, Environment, and Security (QSES) sector, in charge of compliance, and the scientific units conducting laboratory research at the institute. The contracted services will help the JRC Petten site to maintain its: - Environmental Management System (EMS) certification under the Eco-Management and Audit Scheme (EMAS), which includes ISO 14001, and - Safety Management System (SMS) certification under ISO 45001:2018. Additionally, the expert will help ensuring that the site’s operations remain compliant with all applicable laws and regulations.
- Københavns Lufthavne A/SKastrup
10-Jahres-Vertrag für den Betrieb der Werbeflächen am Flughafen Kopenhagen
This tender offers an 10 year contract on rights and obligations to operate the advertising sales in Copenhagen Airport. The contract covers a vast number of medias which is highly visible througout the whole airport. Copenhagen Airport is currently expanding its terminal buildings due to growth in traffic. This expansion will offer new and exciting opportunities for the advertising operator.
- Københavns Lufthavne A/SKastrupFrist: 21. Apr.
10-Jahres-Vertrag zur Vermarktung von Werbeflächen am Flughafen Kopenhagen
This tender offers an 10 year contract on rights and obligations to operate the advertising sales in Copenhagen Airport. The contract covers a vast number of medias which is highly visible througout the whole airport. Copenhagen Airport is currently expanding its terminal buildings due to growth in traffic. This expansion will offer new and exciting opportunities for the advertising operator.
- Københavns Lufthavne A/SKastrupFrist: 21. Apr.
10-Jahres-Vertrag zur Vermarktung von Werbeflächen am Flughafen Kopenhagen
This tender offers an 10 year contract on rights and obligations to operate the advertising sales in Copenhagen Airport. The contract covers a vast number of medias which is highly visible througout the whole airport. Copenhagen Airport is currently expanding its terminal buildings due to growth in traffic. This expansion will offer new and exciting opportunities for the advertising operator.
- Oberstown Children Detention CampusOberstown, Lusk, Co. DublinFrist: 18. Mai
Oberstown Small Capital Works Framework
This is a two stage tender competition which intends to establish a multi provider Framework Agreement between Oberstown Children Detention Campus and the successful Candidates for procuring Minor Capital Works. The first stage is a Suitability Assessment Questionnaire (SAQ) to shortlist ten (10) Candidates who will be invited to tender (provided ten Applicants submit compliant PQQ Responses that meet the minimum requirements). If there is more than one Applicant ranked at tenth place, all the tenth placed Applicants will be invited to tender. The second stage will be a tender competition to appoint a maximum of six (6) Tenderers to the Framework (provided six Tenders are compliant and meet the minimum requirements). If there is more than one Tenderer ranked at sixth place, all the sixth placed Tenderers will be appointed to the framework. The scope of the Capital Works Framework will cover a wide variety of minor projects relating to all Mechanical, Electrical, Building Fabrics, Infrastructure, Fire Safety and other assets on the campus. A non-exhaustive list of possible works: • Minor building extensions • Demolition works • Refurbishment / Renovations / Upgrades of existing buildings (exterior and interior works) • Office fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Control Room fit out projects including but not limited to Architectural works, Mechanical services, Electrical services and Communication backbone infrastructure establishment • Upgrade / replacement of critical Mechanical and Electrical systems that serve our office buildings and our critical assets such as Data Centres, Control Room and Disaster Recovery Sites • Building fabric upgrade and replacement (facades and roofs) • Life Safety Systems i.e., emergency lightening and fire safety • Electrical Systems i.e Specialist Security System • Energy Systems installations and upgrades (LED upgrades, solar panel and heat pump installations) • Site infrastructure works such as retaining walls, underground utilities, roads, pavements, compounds and security fencing • Hard and soft Landscaping • The role of Project Supervisor Construction Stage and Contractor, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope • In some cases, role of Designer, as described in the Safety, Health and Welfare at Work (Construction) Regulations 2013, will form part of this scope. For example, where: (a)Specialist permanent works design may be required in the case of electrical, mechanical, structural or architectural; and (b) Where temporary works design may be required such as shuttering, traffic management, temporary electrical systems, propping, supporting, specialist scaffolding etc. The term of the framework will be 3 years, with options to renew with 1 + 1 years, if deemed appropriate.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 13. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.