Negotiated Procedure for the supply, buildup, installation, and testing of the main electrical control system for the Incinerator plant at the Thermal Treatment Facility, Marsa.
Negotiated Procedure for the supply, buildup, installation, and testing of the main electrical control system for the Incinerator plant at the Thermal Treatment Facility, Marsa.
Angebotsfrist:05. März 2026(abgelaufen)
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Negotiated Procedure for the supply, buildup, installation, and testing of the main electrical control system for the Incinerator plant at the Thermal Treatment Facility, Marsa.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: WasteServ Malta Ltd
- Veröffentlicht: 10. Dezember 2025
- Frist: 05. März 2026
Ausschreibungsbeschreibung
Negotiated Procedure for the supply, buildup, installation, and testing of the main electrical control system for the Incinerator plant at the Thermal Treatment Facility, Marsa.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf