Manufacturing of the Drift Duct for ITER Neutral Beam Injectors
Engineering, manufacturing design, manufacturing qualifications, material procurement, manufacturing, factory acceptance tests and delivery at site of the 2 (two) Drift Ducts for neutral beam injectors 1 and 2.
Angebotsfrist:05. März 2026(abgelaufen)
Typ:Ausschreibung