Kilkenny Abbey Quarter - Building 7
The project consists of the development of a 5 storey office block, comprising of approximately 4,728 sq.m of commercial office space with 396 sq.m retail at ground floor. The project (namely Plot 3, Building 7) is part of the Stage 4 of the Kilkenny Abbey Quarter Masterplan. The scheme shall benefit from significant i...
Angebotsfrist:08. Mai 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The project consists of the development of a 5 storey office block, comprising of approximately 4,728 sq.m of commercial office space with 396 sq.m retail at ground floor. The project (namely Plot 3, Building 7) is part of the Stage 4 of the Kilkenny Abbey Quarter Masterplan. The scheme shall benefit from significant infrastructure wor...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Kilkenny County Council_1185
- Veröffentlicht: 08. April 2026
- Frist: 08. Mai 2026
Ausschreibungsbeschreibung
The project consists of the development of a 5 storey office block, comprising of approximately 4,728 sq.m of commercial office space with 396 sq.m retail at ground floor. The project (namely Plot 3, Building 7) is part of the Stage 4 of the Kilkenny Abbey Quarter Masterplan. The scheme shall benefit from significant infrastructure works, new streets to the east and south and the proposed Brewhouse Building and Courtyard to the north and west, being carried out under a separate infrastructure project outside the site boundary under a different contract. The Project is on a constrained brownfield site with adjacent occupied buildings and is within the curtilage of a National Monument with associated archaeology.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Ausschreibungen
10- Office of Public Works (OPW)TrimFrist: 12. März
Geomatic Survey Services; Measured Topographic and Building Surveys for the National Museum of Ireland Archaeology
The Commissioner of Public Works wish to invite tenders for the supply of Geomatic Survey Services; Measured Topographic and Building Surveys of the National Museum of Ireland Archaeology, Kildare Street, Dublin 2, Ireland. A geomatic survey of the building, both internal and external, will form the basis for the development of drawings connected with proposed conservation and new works to the building.
- Office of Public Works (OPW)TrimFrist: 20. März
Military Road Historic Buildings Complex - Emergency Works
Emergency Works to consolidate remedial stabilisation and decontamination of four historic buildings near Military Road, Dublin 8: Medical Officer’s House, Infirmary Buildings, Coach House, and Laundry Building. All buildings are of significant heritage value, with the Medical Officer’s House and Infirmary designated as Recorded Monuments and Protected Structures. Works must follow best conservation practices in consultation with the Conservation Architect and Dublin City Council Planning Section. The high-security site adjacent to new Garda Offices requires restricted access. Phase 1 included emergency structural stabilisation, temporary propping, debris clearance, joinery salvage, and temporary weathering. The Laundry Building was re-roofed and completed to elevations facing Walter Scott House.
- Store Norske Spitsbergen Kulkompani ASLONGYEARBYENFrist: 30. März
Prequalification of generator suppliers
The prequalification for the generators is part of a larger state investment project for upgrading the energy system in Longyearbyen. In addition to generators wich will be incorporated in the new diesel based combined heat and power plant, the project includes a new tank facility, a new service building with offices, storage, workshop, and infrastructure for the entire energy system.
- Union postale universelleBernFrist: 28. Mai
Consultancy services: strategic transformation of the UPU headquarters building
This call for tenders concerns the provision of consultancy services to guide the UPU through a structured decision-making and design process to evaluate two distinctive options with regard to the UPU headquarters building in Berne, namely a) major renovation and modernization of the existing building and b) demolition and construction of a new building on the site. This process will be executed in two phases (phase 1 – strategic definition and preliminary studies and phase 2 – concept design and option validation), in accordance with the standards of the Swiss Society of Engineers and Architects (SIA).The exhaustive scope of the deliverables, as well as delivery and limiting conditions are specified in detail in Annexes 2 (Specifications for the multidisciplinary design team – phases 1 and 2) and 3 (BIM information requirements).
- Office of Public Works (OPW)TrimFrist: 30. Apr.
Clonmacnoise Visitor Centre Redevelopment, Clonmacnoise, Co Offaly
The project involves a new development at the Clonmacnoise Monastic Site to improve visitor facilities . The works include alterations to the existing buildings and the construction of a new extension. Also included are substantial landscape works, such as alterations to the coach parking area, the provision of a new entrance courtyard and other ancillary works.
- Limerick City and County Council_103432Limerick.Frist: 20. Apr.
Colbert Quarter, Limerick - Multi-Disciplinary (Project Management, Cost Management and Design Team) Design Team Services – Specified Infrastructure Works Packages
Limerick City and County Council's , Colbert Quarter Infrastructure Delivery Office are seeking submissions for the provision of Multi-Disciplinary (Project Management, Cost Management and Design Team) Services for the delivery of the Colbert Quarter , Specified Infrastructure Works Packages. The Colbert Quarter Project aims to deliver a landmark, large-scale mixed-use project in Limerick City Centre. Project Description The Specified Infrastructure Works (SIW) packages will support and facilita
- Trøndelag fylkeskommuneSTEINKJERFrist: 15. Mai
Framework agreement, building materials
Trøndelag county shall enter into a parallel framework agreement for the delivery of building materials as the existing contract expires. The framework agreement shall be for 2 years with an option for 1+1 year. The procurement is being carried out to ensure continuity and predictable access to construction materials for the county ́s ongoing operations, building disciplines, maintenance and renovation of buildings and sites. The contract includes the procurement of wood, building materials, painting products, wall and floor coverings. The county has a continual need for efficient ordering and delivery processes to several locations and storage points. The framework agreement shall therefore facilitate a practical and secure supply line with an appropriate assortment, stable delivery quality and the necessary documentation. At the same time it is important that the tenderer can support the county ́s requirements for quality, environment and traceability in the deliveries.
- Valentia Island Development Company CLGValentia IslandFrist: 09. Apr.
The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry
Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.
- ForsvarsbyggOSLOFrist: 30. Apr.
Competition - Contract C03660 General Contract (part 1 of the 2 stage process) - 100811 - P2078 RVS North
The objective of the procurement is to enter into a contract with a contractor for the construction of a regional maintenance centre (RVS). The maintenance centre shall support the execution and operation of radar installations and it is a central part of the total project P2078 ́s physical infrastructure.
- Helse Sør-Øst RHFHAMARFrist: 30. Apr.
Contract Contract 2041 Building VDS and TS - New Aker
The main elements of the assignment are the erection of a technical central and goods and distribution centre for Nye Aker Hospital. The building volume of approx. 7,000 m2 is mainly constructed in concrete cast on site with brick façade, with the accompanying outdoor areas in the form of an upper and lower warehouse for transporting goods and textiles and waste in and out of the new hospital.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 08. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Kilkenny County Council_1185.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.