Donegal FET Centre Drumcliff, Donegal Town, Co. Donegal, F94D28H – Upgrade and Refurbishment Works
Donegal FET Centre Drumcliff, Donegal Town, Co. Donegal, F94D28H, Upgrade and Refurbishment Works to an existing buildings to include New Windows and Doors, pumped beaded insulation and new M and E services inclusive of all associated works.
Angebotsfrist:04. Juni 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Donegal FET Centre Drumcliff, Donegal Town, Co. Donegal, F94D28H, Upgrade and Refurbishment Works to an existing buildings to include New Windows and Doors, pumped beaded insulation and new M and E services inclusive of all associated works.
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Donegal Education and Training Board_368
- Veröffentlicht: 14. Mai 2026
- Frist: 04. Juni 2026
- Bauobjekt: Schule
Bauobjekt-Klassifikation
- SchuleHauptobjekt
Ausschreibungsbeschreibung
Donegal FET Centre Drumcliff, Donegal Town, Co. Donegal, F94D28H, Upgrade and Refurbishment Works to an existing buildings to include New Windows and Doors, pumped beaded insulation and new M and E services inclusive of all associated works.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Public Enterprise “Roads of Serbia”BelgradeFrist: 29. Mai
Upgrade to existing science classrooms and attic insulation to Loreto College Cavan
The Works involve upgrade works to existing science classrooms and store to include new furniture, doors, demolition of existing walls, new floors and finishes, wall finishes, M+E upgrade and all associated works. All works are to be carried out in accordance with the Technical Guidance Documents and best practice guidelines.
- St Brigids Community Centre CommitteeBallintraFrist: 26. März
Facility Upgrade Works – St Brigid’s Community Centre
Works include WC upgrades, accessibility improvements, storage works, and resurfacing works at St Brigid’s Community Centre, Ballintra, Co. Donegal.
- St. Colman's National School (Mullingar)MullingarFrist: 26. Mai
St Colman's National School Climate Action Summer Works Replacement of Windows and Doors including Electric Vehicle Charging Station and Bike Rack and associated site works
Climate Action Summer Works: Replacement of external windows and doors, including electric vehicle (EV) charging station and bike rack with all associated site works at St. Colman’s National School, Bellview, Mullingar, Co. Westmeath.
- Office of Public Works (OPW)Trim
Sligo Garda Station Internal Alterations
Internal modifications to the existing station over ground first and second floors to comprise of modifying existing rooms and offices including destruction and construction of inner walls new inner windows doors floor finishes and ceiling repairs. New M and E Services to all 3 floor areas.
- Castlecomer Community SchoolCASTLECOMERFrist: 02. Juni
Upgrade of Science Laboratories and Preparation Room at Castlecomer Community School, Donaguile, Castlecomer, Co. Kilkenny
Upgrade of 3 no. science laboratories and preparation room located at first floor level and including essential associated works to ground floor classrooms and corridor underneath. The works include demolitions and removals of existing services, fittings and equipment, provision of new fit out, new mechanical, electrical and gas services, provision of new equipment and furniture. Fire safety upgrade, new firedoors and screens, building finishes to floors, walls and ceilings. The works include forming floor opes and extending services through ground floor ceilings, firestopping, ceiling and services replacement at ceiling level in ground floor classrooms under.
- University College Dublin ( UCD )DublinFrist: 25. Mai
Neubau UCD FBD Agricultural Science Centre, Celbridge, Co. Kildare
Construction of new UCD FBD Agricultural Science Centre in Celbridge, Co. Kildare. The c. 2,000m² building will provide high-quality research, laboratory, and office facilities to the highest modern standards. Contract includes extensive site services: new attenuation pond, foul treatment system, and hard/soft landscaping.
- IDA IrelandDublinFrist: 04. Juni
Water Infrastructure Upgrade Works - IDA Business and Technology Park, Colooney, Co. Sligo
Installation of new water infrastructure to upgrade the fire fighting watermain, including hydrants, sluice valves, water meters, etc., and making good of any surfaces damaged or excavated during the works.
- Scoil UrsulaCorkFrist: 22. Mai
Scoil Ursula Primary School, Blackrock Road, Blackrock, Cork - SEN extension and associated siteworks
The project consists of construction of a single storey extension containing 2 SNU classrooms, multi sensory room, office, store and ancillary accommodation to the Eastern side of the existing school building, connection with the existing building, minor alterations within the existing building and all associated site works and services at Scoil Ursula, Blackrock Road, Blackrock, Cork.
- The Abbey SchoolTipperary TownFrist: 09. Apr.
The Abbey School Tipperary - Elektrische Notaufwertung 2026
Upgrade of the electrical installations throughout the school including an upgrade to the ESB Networks supply, provision of new Distribution Boards and cable containment systems, general service and equipment power, general lighting system, ICT Structured Wiring Systems, rewiring of the existing CCTV and Public Address systems, new power supplies, reconnection, testing and recommission of the existing Life Safety Systems and all associated builders and civil works
- Galbally National SchoolGalballyFrist: 27. Mai
2620 Heating Upgrade and Gas Conversion Galbally National School Limerick
Full upgrade of the Heating Services and conversion to LPG including full strip out of existing oil boiler and redundant heating services, provision of new condensing gas fired boilers in cascade, flue kits, header pipework, pumps, valves, actuators, presurisation unit, gas safety system, new 2 pipe heating distribution system, nZEB radiators, heating controls and all associated electrical and builder's works.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 04. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Donegal Education and Training Board_368.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.