CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testin...
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the w...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Bord na Móna PLC
- Veröffentlicht: 14. Mai 2026
- Frist: Nicht angegeben
- Thema: Elektroinstallation
- Bauobjekt: Windenergieanlage
Bauobjekt-Klassifikation
- WindenergieanlageHauptobjekt
Ausschreibungsbeschreibung
In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
310004174 - Engineering support for the development of up to three PtL pilot plants in up to three countries
The International Power-to-X Hub supports the transition to climate-neutral industries and economies by advancing sustainable Power-to-X solutions in sectors where direct electrification is not yet feasible, especially aviation, maritime transport and energy-intensive industries. The project is implemented by Deutsche Gesellschaft fuer Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for the Environment, Climate Action, Nature Conservation and Nuclear Safety (BMUKN). It is financed through the International Climate Initiative as part of Germany"s hydrogen and Power-to-X policy framework. Power-to-X enables the production of fuels and chemical feedstocks from renewable electricity and sustainable carbon or nitrogen sources and therefore helps replace fossil-based inputs while supporting climate protection, industrial transformation and sustainable economic development. The subject of this tender is providing technical support for the development of up to three Power-to-Liquid pilot plants in up to three countries. The assignment provides up to three industrial partner companies with customised engineering documents and advisory services to advance PtL pilot plant projects to FEED/EPC tendering stage. The requested services cover the full project development pathway from concept definition and selection through comparative techno-economic feasibility assessment and conceptual engineering to advice on procurement and tender strategy and, where required, support for the preparation of functional FEED/EPC tender documents. The contract is structured into four work packages in two implementation steps. In Work Packages A and B, the contractor shall review existing concepts and documentation, consult each partner, refine or propose PtL plant concepts, advise on feedstock and utility sourcing, process technologies, offtake markets, regulation and certification, conduct kick-off meetings and site visits, and prepare Concept and Site Analysis Reports with comparative assessments and recommendations. The contractor shall also deliver partner trainings and prepare comparative techno-economic feasibility studies for up to two plant concepts per partner, including a book of assumptions, process simulation, technical descriptions, preliminary process flow diagrams, equipment sizing, interface definitions, certification compliance assessment, CAPEX and OPEX estimates, economic modelling, risk analysis and concept recommendations. Preliminary results shall be discussed with each partner in an interactive workshop to validate assumptions, review trade-offs and support concept selection. Subject to confirmation by the partner and GIZ, Work Package C covers FEL-2 conceptual engineering for the selected concept and a refined Class 4 AACE cost estimate. This includes advisory support on site development, permitting and certification, preparation of an integrated project execution plan, partner trainings on PtL process simulation and plant engineering, and an FEL-2 engineering package comprising Basis of Design specifications, process descriptions, drawings, equipment lists, preliminary equipment specifications, interface and battery limit definitions, input and output specifications, and QA/QC and HSE requirements. The engineering work shall be carried out in close coordination with the partner and GIZ and shall include advice on technology and licensor options as well as updated CAPEX estimates, economic models and key project indicators. Where sustainable CO2 supply is not readily available, the services may also include, for one project, the screening of potential sustainable carbon sources and the design of a CCU system including FEL-1 engineering package and CAPEX assessment. In a subsequent stage, the contractor shall advise on FEED/EPC procurement and tender strategy and, where required, prepare the functional tender specifications, including design basis, technical and performance specifications, scope of supply and services, site and utility information, HSE and QA/QC requirements and project schedule elements in line with the partner"s procurement framework and international standards. The contractor shall also provide advice on commercial and legal terms during tender preparation. For one partner, the services may further include support during the FEED/EPC tendering process, including bidder communication, clarification support, qualification and bid evaluation assistance, preparation of evaluation notes and support during negotiations. Throughout implementation, the contractor shall also provide cross-cutting knowledge exchange, monitoring, reporting, backstopping and coordination services.
- EnBW Energie Baden-Württemberg AG
Qualification System for Large Power Transformers (LPTs)
EnBW is seeking requests for participation for production, delivery and operational handover for high-quality large power transformers for our **380kV grid projects. Companies with the capability to meet our technical specifications are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and ability to implement our projects. Below are the summarized technical requirements: **Electrical Specifications:** - **Design:** Three-winding power transformer - **Rated power: **400/200/200 MVA - **Voltage ratio: **400/33/33 kV - **Vector group: **YNd11d11 - The specified no load sound power level, measured according to the sound intensity method is 93 dB(A). - **Cooling type: **provided by an ONAF system. - **Short circuit voltage: **specified as 22% for HV-LV1, 22% for HV-LV2, and 44% for LV1-LV2. - The transformer is designed in accordance with DIN 60076 - An on load tap changer is provided with 17 steps and a total voltage control range of −10% to +10% **Important Keywords:** 380 kV Transformers, High Voltage Transformers, Three-Winding power transformers, Outdoor Installation Transformers We look forward to receiving your request for participation and potential partnerships.
- Netze ODR GmbHFrist: 14. Juni
Qualification System for Large Power Transformers (LPTs)
EnBW is seeking requests for participation for production, delivery and operational handover for high-quality large power transformers for our **380kV grid projects. Companies with the capability to meet our technical specifications are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and ability to implement our projects. Below are the summarized technical requirements: **Electrical Specifications:** - **Design:** Three-winding power transformer - **Rated power: **400/200/200 MVA - **Voltage ratio: **400/33/33 kV - **Vector group: **YNd11d11 - The specified no load sound power level, measured according to the sound intensity method is 93 dB(A). - **Cooling type: **provided by an ONAF system. - **Short circuit voltage: **specified as 22% for HV-LV1, 22% for HV-LV2, and 44% for LV1-LV2. - The transformer is designed in accordance with DIN 60076 - An on load tap changer is provided with 17 steps and a total voltage control range of −10% to +10% **Important Keywords:** 380 kV Transformers, High Voltage Transformers, Three-Winding power transformers, Outdoor Installation Transformers We look forward to receiving your request for participation and potential partnerships.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Bord na Móna PLC.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.