Alterations to Porch and Tower including Drainage Works at Lismore Cathedral, North Mall, Lismore
Removal and replacement of the existing stairs from ground to first floor and new partitions enclosing the new stairs, a WC compartment and some storage space. Alterations include moving existing double doors to form a new lobby, a new glass door in the east wall and some minor alterations to the first floor. Repairs t...
Angebotsfrist:09. April 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Removal and replacement of the existing stairs from ground to first floor and new partitions enclosing the new stairs, a WC compartment and some storage space. Alterations include moving existing double doors to form a new lobby, a new glass door in the east wall and some minor alterations to the first floor. Repairs to sources of wate...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Lismore Cathedral CLG
- Veröffentlicht: 06. April 2026
- Frist: 09. April 2026
Ausschreibungsbeschreibung
Removal and replacement of the existing stairs from ground to first floor and new partitions enclosing the new stairs, a WC compartment and some storage space. Alterations include moving existing double doors to form a new lobby, a new glass door in the east wall and some minor alterations to the first floor. Repairs to sources of water ingress (provisional). Services will include electrical - additional lighting, heater, water heater, extract fan; water services and drainage outfall from new WC to adjoining school system. The cathedral is a protected structure on the Record of Protected Structures of the Waterford City and County Development Plan. It is also listed as a National Monument in the Record of Monuments and Places. It is rated as a building of national importance. Because it is a building of national importance and a protected structure, the contractors submitting tenders must have a suitable level of experience in conservation work.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Ausschreibungen
10- Lismore Cathedral CLGLismoreFrist: 03. Apr.
_Alterations to Porch and Tower including Drainage Works at Lismore Cathedral, North Mall, Lismore
Abbau und Ersatz der bestehenden Treppe vom Erdgeschoss zum 1. Obergeschoss, neue Trennwände für die Treppe, WC-Kabine und Lagerraum. Umbau: Verlegung bestehender Doppeltüren für neuen Vorraum, neue Glastür in Ostwand, kleinere Änderungen im 1. Obergeschoss. Reparatur von Wassereintritt (vorläufig). Elektro: zusätzliche Beleuchtung, Heizung, Warmwasserbereiter, Abluftventilator. Wasser/Abwasser: Anschluss des neuen WC an das benachbarte Schulsystem. Das Gebäude ist ein geschütztes Bauwerk (Nationaldenkmal) von nationaler Bedeutung. Bieter müssen Erfahrung in Denkmalpflege nachweisen.
- Health Service Executive (HSE)KildareFrist: 30. Apr.
Alteration Works to the existing Laundry and Drier Rooms at Abbeyleix CNU, Abbeyleix Health Centre, Knocknamoe, Abbeyleix, Co. Laois.
Reconfiguration of existing Laundry and Drier rooms located on ground floor level including the replacement and relocation of existing washing and drying machines, replacement of existing internal and external doors and windows and redecoration of both rooms as well as works to the Comms room located on first floor level, together with all associated works.
- Office of Public Works (OPW)TrimFrist: 12. Mai
6 Harcourt St - | Conradh na Gaeilge, Dublin 2, D02 VH98 Phase 3A: Basement Piling Works for New Build Extension to 6 Harcourt Street
The refurbishment and redevelopment of No. 6 Harcourt Street Dublin 2 to provide for improved facilities for Conradh na Gaeilge, the Irish language development organisation. The proposal involves the renovation of the existing original house to accommodate a museum and cultural centre, and the construction of new accommodation to the rear to house administration and support facilities. No. 6 Harcourt Street is listed on the Dublin City Council Record of Protected Structures. The refurbishment and redevelopment of No. 6 Harcourt Street Dublin 2 to provide for improved facilities for Conradh na Gaeilge, the Irish language development organisation. The proposal involves the renovation of the existing original house to accommodate a museum and cultural centre, and the construction of new accommodation to the rear to house administration and support facilities.No. 6 Harcourt Street is listed on the Dublin City Council Record of Protected Structures. Phase 3a: Ground Excavation, Secant Piling Works and Temporary Works* Phase 3a will constitute a piling works package for the basement construction. It includes: • Demolition of rear party wall to No. 7 Harcourt Street (above and below ground). • Backfilling of basement vault abutting the rear façade of the Protected Structure and propping of rear façade of the Protected Structure • Installation of basement piling works (Secant Wall) • Installation of shotcrete lining to inner face of piling wall • Ground excavation works to the underside of proposed basement slab • Temporary shoring props to restrain basement ope and all associated temporary site works
- Valentia Island Development Company CLGValentia IslandFrist: 09. Apr.
The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry
Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.
- Kingdom Homecare Services LtdTraleeFrist: 09. Apr.
Bluebird Care Day Centre – Fit-Out and Refurbishment Works
Internal fit-out and refurbishment of first floor of existing two-storey building for use as a day care and activity centre. Works include demolition of existing internal partitions and finishes; new drywall partition systems; fully accessible Wet Changing Room compliant with TGD Part M including full room XY/H-Frame ceiling track hoist; kitchen fit-out; sensory rooms with Autex Acoustics treatment; quiet rooms; office W.C.; protected corridor; electrical installation; mechanical ventilation with heat recovery; plumbing, drainage and water services; external wall insulation upgrade; attic insulation; fire safety works; Disability Access Certificate (DAC) compliance; and all associated finishes, fixtures and fittings.
- ØVRE EIKER KOMMUNALE EIENDOM KFHOKKSUNDFrist: 30. Apr.
Alterations of the Technical Centre to the Department Roads/Park and the Ambulance Service, as well as a new vehicle hall for the Fire Brigade.
The assignment is for a turnkey contract with interaction for the engineering design services and execution of the following work Skotselvveien 29, in Øvre Eiker municipality; Alterations to the existing technical centre, approx. 1940m2 Expansion of the building/addition of a new fire station, approx. 537 m2 Alteration and development of outdoor areas. Plan drawings and a situation plan have been prepared that show the wanted solutions and are being worked through in cooperation with users. The
- University Of UlsterColeraineFrist: 01. Mai
Derry~Londonderry Northern Roads Sports Dome (UU Dome)
Ulster University intends to appoint a contractor to deliver the construction works for a new tensile PVC membrane structure ("the Dome"). The proposed development comprises a tensile PVC membrane structure (the Dome) with a gross internal floor area of approximately 15,700m². The scheme will also include wider site works including a car park, civic event space, an amended entrance off Northland Road and associated infrastructure, on behalf of Ulster University. The project is required to be completed in advance of June 2028 and is part funded by the PEACEPLUS Programme (SEUPB). The form of Contract will be NEC4 (New Engineering Contract) Option B Priced Contract with bill of quantities.
- DOKKEN UTVIKLING ASBergenFrist: 02. März
Urban areas, landscape and strategy for first floors at Dokken
Dokken is a large and strategically important urban development area with a central location in Bergen. The transformation of the area from port and industrial area to a new, open and compound district is one of the most significant urban development assignments in the city in recent times. The development of the Dokken provides a unique opportunity to establish a centrist district where residences, workplaces, urban spaces and public orientated functions are included in a general structure and
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Mai
NL-Petten: The supply and installation of air handling units, replacing the existing ones in buildings 308 and 309.
The European Commission's Joint Research Centre (JRC) in Petten intends to replace the existing Air Handling Units (AHUs) and associated HVAC infrastructure located in buildings 308 and 309. The current ventilation systems are obsolete and have reached the end of their operational lifespan. Furthermore, preliminary technical assessments have indicated that the existing air renewal capacity is insufficient to maintain optimal indoor air quality for the occupants. To ensure a healthy, safe, and productive working environment, this procurement aims to upgrade the facilities. The primary objective is to improve indoor air quality, while simultaneously improving the overall energy efficiency of the buildings. The scope of this contract encompasses the supply, installation, and comprehensive commissioning of the new air handling systems and related infrastructure to provide a fully functional delivery. This includes the safe removal and disposal of the existing AHUs, roof support frames, humidification systems, and redundant cabling or piping, ensuring continuous operation of the buildings during the transition. The technical project involves replacing the units with new, highly energy-efficient equipment featuring heat recovery systems. Additionally, the contract covers the complete adaptation of the hydraulic system to operate under a new, lower-temperature regime, the installation of humidification systems, installing structural supports on the roofs, and the execution of all necessary electrical works. Finally, it requires the full integration of the new instrumentation and controls with the existing Siemens Building Management System (BMS), alongside essential auxiliary tasks such as ductwork cleaning.
- Dublin Port Company_411DublinFrist: 30. Apr.
Multi Party Framework Agreement for Civil Works Contractor at Dublin Port Company
Dublin Port Company proposes to engage in a competitive process for the establishment of Multi-party Framework Agreement for Civil Works Contractor. The scope of works include but are not limited to the following: • New terminal yards works consisting of prepared site, demolitions, site enclosure security fencing, concrete or flexible paving, drainage, site services, electrical lighting, signage and associated structures, security cabins, welfare facilities, buildings, offices, reefer gantries.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 09. April 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Lismore Cathedral CLG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.