Aðalstræti 112, Patreksfjörður - Building Renovations
The project consists of renovation and alteration works at Aðalstræti 112 in Patreksfjörður, including construction works, plumbing installations, electrical works, and interior finishing, in accordance with the tender documents, drawings, and technical specifications provided by the Client. The Contractor shall be res...
Angebotsfrist:08. Juni 2026
Typ:Ausschreibung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The project consists of renovation and alteration works at Aðalstræti 112 in Patreksfjörður, including construction works, plumbing installations, electrical works, and interior finishing, in accordance with the tender documents, drawings, and technical specifications provided by the Client. The Contractor shall be responsible for all ...
- Ausschreibungstyp: Ausschreibung
- Auftraggeber: Orkubú Vestfjarða ohf.
- Veröffentlicht: 05. Mai 2026
- Frist: 08. Juni 2026
- Thema: Tischlerarbeiten
Ausschreibungsbeschreibung
The project consists of renovation and alteration works at Aðalstræti 112 in Patreksfjörður, including construction works, plumbing installations, electrical works, and interior finishing, in accordance with the tender documents, drawings, and technical specifications provided by the Client. The Contractor shall be responsible for all project management, labor, procurement of materials, equipment, and tools necessary to complete the works in a professional and safe manner. All works shall be carried out in accordance with applicable laws, regulations, standards, and the instructions of the supervising authorities. Particular emphasis shall be placed on ensuring that all materials and workmanship are of first-class quality and comply with the requirements of the Icelandic Building Regulations and relevant standards.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Technological University of the Shannon: Midlands Midwest (TUSMM)LimerickFrist: 03. Juni
Supply of 3 Building Management Systems to TUS Midwest
Proposals are sought for the design, supply, installation, integration, testing, commissioning, training, documentation for a new open-protocol Building Management System (BMS) at TUS Clare Street Campus, Limerick, TUS Thurles campus and TUS Clonmel Campus. All of the the BMS systems must be controlled remotely and need to have access to the network from Moylish campus. The works shall be completed in accordance with all applicable standards, including electrical regulations, manufacturer requirements, and site specific policies. The project aims to monitor, control, optimise and safeguard the mechanical and electrical services within the building.
- Oslo kommune v/ Vann- og avløpsetatenOsloFrist: 30. Apr.
Market survey - Renovation/alterations to iron sulphate rooms.
The Agency for Water and Sewerage Works (VAV) plans to renovate and rebuild the iron sulphate room at Bekkelaget treatment facility. The aim is to ensure safe, robust and efficient handling, storing and dosing of iron sulphate, with emphasis on operational safety, HSE/SHA, outer environment and lifetime costs. The project shall be carried out in accordance with NS 8405 and other competition documents. This market survey shall map: • tenderers ́ interest in the assignment. • recommendations for t
- Vestland fylkeskommuneLEIKANGERFrist: 28. Mai
County road 560 Skogsskiftet sentrumsområde
The work includes engineering design services, construction of county road 560 with accompanying foot and cycle paths and side roads in Øygarden municipality. Tenderers shall adapt the system to neighbouring roads in accordance with land acquisition contracts and will be responsible for all the necessary applications. The work also includes engineering design services for and the execution of all roads, side roads, foot and cycle facilities, as well as the accompanying technical installations and equipment that are necessary to ensure the function of the facility in accordance with the contract and regulations.
- Office of Public Works (OPW)TrimFrist: 12. Mai
The provision of Interpretation and Exhibition Design for a proposed new visitor facility building adjacent to the Casino at Marino, Cherrymount Crescent (off Malahide Road), Marino, Dublin.
Office of Public Works (OPW) wishes to appoint an Integrated Interpretation Team that shall be responsible for providing all the necessary consultancy services for Stage (I) Preliminary Design to Stage (V) Handover of Works. The following disciplines are relevant to this project: • Interpretive Design Services • Interpretive Research services • Project Management Services • Graphic Design Services • AV / Film Technical Design Services • Procurement services • Quantity Surveying/Cost Management Services • PSDP Services • Script Writing The Integrated Interpretative Team will be responsible for providing all interpretive and associated construction/fitout-related technical advice and design services to the OPW Client for the Project. The Consultant will be required to provide all necessary services including the Stage Services, described below and elsewhere in the contract. The Integrated Interpretation Team shall be required to consult and liaise with all affected stakeholders to facilitate timely design and construction/fitout of the works and to minimise impacts on those affected. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. As noted in 4.3.9.1, It is expected that within the team there will be a Specialist AV / Film Advisor available to provide advice to the team during all stages of the design and fit out process. The Integrated Interpretative Design Team shall comprise of all the disciplines necessary to achieve this objective. The Team shall be led by an Interpretative designer with a track record of successfully carrying out similar works. Interpretive Research services need to include (a named) suitably qualified person able to collate/and or undertake subject matter research feeding into interpretative design, narrative development and Script Writing. The Team may be formed by a single consultant with in-house specialists or may be a group of consultants who have combined to form a team. In the latter case the Team Leader shall be an Interpretative designer who shall be clearly identified in their Tender Submission as the Lead Tenderer and shall be the entity that enters into a contract with OPW for the delivery of the Services. Other Team members shall be sub-consultants to the Lead Tenderer. Note - The cost of the works will be required to align with the available budgets. The consultant shall refine / revise designs as necessary during the lifetime of the project to achieve this, in consultation with OPW. Full list of requirements are contained within the tender documents.
- KriminalomsorgsdirektoratetLillestrømFrist: 09. Juni
Archive and emptying services oslo prison.
The Oslo Prison unit closes 15 June 2026. Archiving material in the basement shall thus be digitalised and destroyed. There is a high level of tracking concentration in the archive premises. Some archive pieces have visible mould outside, but all archive pieces will externally be well coated with tracks. The documents shall be scanned and placed in a digital archive and the paperwork shall be destroyed after scanning. Mould-infected documents that are granted barracks shall be transported for burning. Tenders shall include emptying (packing, packaging and transport), media conversion and casing (transport and burner) with the accompanying services, such as clearing of means of transport, packaging boxes etc. The final result shall be an empty basement archive and the content is archived in accordance with the current rules.
- MANİSA SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜŞEHZADELERFrist: 15. Juni
Supply and Installation of Pyrolysis Equipment
The chosen Contractor shall be responsible for the turnkey delivery of the Project, including but not limited to: • Design, supply, installation, commissioning and testing a Pyrolysis Unit (min 75 kg/hr) under the Sludge2Energy Project; • Provision of software and hardware for the automation system. • Preparation of As-Built drawings; • Provision of training, documentation; • warranty and after-sales supervisor support for 24 months; • Data management and monitoring; • Compliance with all Technical Specifications and national/international standards.
- Dublin City CouncilDublinFrist: 22. Mai
Contract for the execution of the Building Works designed by the Employer relating to Dublin City Council's redevelopment of Dalymount Park, Phibsborough
The project comprises the redevelopment of the existing Dalymount Stadium and its associated ancillary accommodation into a UEFA Category 3 stadium with capacity to accommodate 8,039 spectators (6,245 seated and 1,794 standing spaces). The Works include the demolition and removal of all existing stadium structures and associated infrastructure, site investigation and testing, and the execution of the new construction works in accordance with the Employer’s Requirements. The project is sponsored by DCC’s Community, Culture, Leisure and Area Services (CCLAS) Department and overseen by the Corporate Project Governance Board (CPGB). The project has completed Gate 1 and Part 8 approval (as amended April 2026). The redevelopment will deliver a modern, compliant sporting venue incorporating spectator stands, player and match official facilities, media and broadcasting infrastructure, hospitality and community spaces, building services installations, and all associated external and site development works. The scope further includes the coordination and delivery of structural, architectural, civil, mechanical, electrical, and specialist systems necessary to achieve regulatory compliance and operational functionality. All works are to be undertaken in accordance with the Employer’s Requirements, statutory approvals, applicable standards, and the obligations set out in the Contract documentation. This is the first stage of the competitive procedure, whereby any interested party may submit a response to the Suitability Assessment Questionnaire (SAQ) in order to be considered for inclusion on the tender list. The SAQ must be completed in full and returned with all required supplementary information and completed Appendices. Following the receipt and evaluation of completed SAQs, it is envisaged that the top five (5) scoring Applicants (subject to the quality and number of SAQs received) who also meet the minimum criteria and rules for selection will be invited to tender for the Dalymount Park Main Works Contract. In the event of a tie, the Contracting Authority reserves the right to shortlist more than five (5) Applicants to Stage 2 For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 7831568 – Input when notice created . Please note that this project is subject to funding.
- Ministry of Foreign AffairsCopenhagen
Audit of the Primary Health Care Support Programme FY25/26 and FY26/27
The Royal Danish Embassy, Kenya, has entered into a contract regarding the following services: 1. Conduct financial audits of the Danida PHC programme in accordance with International Standards of Auditing (ISA) and Appendix 1 2. Plan and perform procedures related to compliance audits 3. Plan and perform procedures related to performance audits The Consultant is expected to perform audits on PHC for financial year 25/26, including spill over from 24/25 and financial year 26/27. The purpose of the audits is to confirm that Danida PHC programme funds have been used for the intended purposes, and in an efficient and economical manner in line with the financing covenants between Danida and GOK and relevant financial regulations and guidelines. The Consultant shall review and report on whether the financial statements of the funded activities present fairly, in all material respects, revenues received, costs incurred, and commodities and technical assistance directly procured under the programme for the period audited in conformity with the terms of the agreements and generally accepted accounting principles or other comprehensive basis of accounting. As such, the objective of the financial audits and performed procedures related to compliance and performance audits are: 1. To form an opinion on whether the annual financial statements are prepared, in all material respects, in accordance with established financial guidelines for reporting. 2. To enable the RDE to determine whether funds disbursed have been used in compliance with, and in all material respects with, all applicable laws and agreements covering the Danida PHC programme. 3. To enable the RDE to determine whether funds disbursed have been spent in an economical way, in all material respects, and to obtain reasonable assurance whether the systems, processes and transactions examined support the exercise of sound, transparent and accountable financial management in the administration of the funds granted by the RDE. 4. In respect of the compliance and performance audits, it is not a requirement that these be performed against any specific international standards, but Kenyan accounting principles for government expenditures must be followed, as well as International Standards for Auditing.
- Veitur ohf.Reykjavik
Service and maintenance for Veitur´s utilities grid
The Purchaser intends to enter into a framework agreement, with a maximum of three Contractor(s), for a Services frame agreement for its grid service and maintenance based in Iceland. The scope shall include works in all of the Purchaser utilities e.g. Electricity (400V up to 33kV grid), Hot Water, Cold Water, and Sewage. The scope shall include in whole or in part: • Maintenance of existing grid infrastructure • Fault Repair of existing grid infrastructure • Renewal of existing grid infrastructure • Installation of new utility systems • New Building Connections to existing grid and grid changes necessary to secure new building connections • New installation and maintenance of sub-stations • New installation and maintenance of street cabinets • End to End Responsibilities shall include, but not limited to: • Preparation (e.g. permits, licenses, planning) work prior to execution of work • Project management and supervision • Qualified field resources to perform work • Qualified resources to perform own inspections during the work to be performed • Other supporting functions with respect to the work to be performed • Security measures • Warehousing, Material and Equipment as a part of performing the Services. (i.e. including purchasing, storage and end-to-end management of all material required to perform work, unless otherwise specified by the Purchaser) • Supporting IT Systems required for the performance of Services
- Centre for development of the South-East planning regionStrumicaFrist: 14. Apr.
Supply of equipment – EV Chargers
The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in the SouthEast of North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and asbuilt documentation must be delivered to ensure correct use, maintenance and longterm functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage lowcarbon mobility and contribute to the development of regional electric vehicle infrastructure.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf auftrag.ai. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 08. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Orkubú Vestfjarða ohf..
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf auftrag.ai werden diese Punkte priorisiert dargestellt.